Statoil North Sea – Successful World Record MLT Installation
View through CrossRef
Abstract
In October 2010 the deepest set sealed multilateral junction in the industry was installed at 6900 m MD in Oseberg South well 30/9-F-9 AY1/Y2.
The differential pressure across the junction in the well is expected to be in the range of 250 bars. To meet this pressure requirement, a multilateral (ML) junction rated to 370 bars was identified. The high pressure junction components and entire multilateral system has undergone an extensive testing and qualification program, including several component tests and a full scale system interface and integration test.
A 10 ¾″ pre-cut window with an outer aluminium tube was installed as an integral part of the 10 ¾″ liner. The plan was to perform the milling operation through this window. A stuck string incident during the 10 ¾″ liner installations accidentally caused the liner to drop in hole. The liner ended up at the wrong orientation, and the window could consequently not be used.
The mainbore was drilled to TD at 8583 m MD and the 7″ liner was run and cemented. After the liner perforation the MLT operations started with the installation of a multilateral anchor packer to allow for installation of a latch interface assembly (LIA) and milling system. The LIA was installed and locked into the multilateral packer on a separate run.
The milling operation was done in a two step operation with milling of a 1st pass window using a 10 ¾″ milling machine prior to installation of whipstock and performing the 2nd pass milling operation.
The lateral branch was drilled to TD at 8258 m MD and a 5 ½″ screen completion was run and dropped off into the 8 ½″ open hole. The drilling whipstock was retrieved from the well and a completion deflector was installed. The junction was finally stung into the deflector, simultaneously as an open hole seal stinger entered top of the screen liner in open hole, tying the branches together.
A 6900 m long upper completion string with inflow control valves was finally installed to allow for surface control of the two branches.
Title: Statoil North Sea – Successful World Record MLT Installation
Description:
Abstract
In October 2010 the deepest set sealed multilateral junction in the industry was installed at 6900 m MD in Oseberg South well 30/9-F-9 AY1/Y2.
The differential pressure across the junction in the well is expected to be in the range of 250 bars.
To meet this pressure requirement, a multilateral (ML) junction rated to 370 bars was identified.
The high pressure junction components and entire multilateral system has undergone an extensive testing and qualification program, including several component tests and a full scale system interface and integration test.
A 10 ¾″ pre-cut window with an outer aluminium tube was installed as an integral part of the 10 ¾″ liner.
The plan was to perform the milling operation through this window.
A stuck string incident during the 10 ¾″ liner installations accidentally caused the liner to drop in hole.
The liner ended up at the wrong orientation, and the window could consequently not be used.
The mainbore was drilled to TD at 8583 m MD and the 7″ liner was run and cemented.
After the liner perforation the MLT operations started with the installation of a multilateral anchor packer to allow for installation of a latch interface assembly (LIA) and milling system.
The LIA was installed and locked into the multilateral packer on a separate run.
The milling operation was done in a two step operation with milling of a 1st pass window using a 10 ¾″ milling machine prior to installation of whipstock and performing the 2nd pass milling operation.
The lateral branch was drilled to TD at 8258 m MD and a 5 ½″ screen completion was run and dropped off into the 8 ½″ open hole.
The drilling whipstock was retrieved from the well and a completion deflector was installed.
The junction was finally stung into the deflector, simultaneously as an open hole seal stinger entered top of the screen liner in open hole, tying the branches together.
A 6900 m long upper completion string with inflow control valves was finally installed to allow for surface control of the two branches.
Related Results
RAPID: A New Approach for Improved Regularity and Decreased Maintenance Costs
RAPID: A New Approach for Improved Regularity and Decreased Maintenance Costs
Abstract
Statoil is a Norwegian based oil and gas company with a daily oil and gas production of 1.1 million boe, operations in 30 countries and about 24.000 empl...
Effect of exposure to extremely low frequency magnetic fields on melatonin levels in calves is seasonally dependent
Effect of exposure to extremely low frequency magnetic fields on melatonin levels in calves is seasonally dependent
AbstractThe question of health effects of extremely low frequency (50/60 Hz) magnetic fields (ELFMF) has been widely discussed, but the mechanisms of interaction of these fields wi...
Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Abstract
Subsea completions in deep waters are becoming more and more frequent around the world. This entails the use of innovative technology, remote interventio...
Successful Implementation and Optimization of MLT Technology
Successful Implementation and Optimization of MLT Technology
Abstract
This paper highlights the successful installation of a MultiLateral Technology (MLT) for the first time in an offshore field 40 km from Abu Dhabi. It will d...
On three types of sea breeze in Qingdao of East China: an observational analysis
On three types of sea breeze in Qingdao of East China: an observational analysis
Our knowledge of sea breeze remains poor in the coastal area of East China, due largely to the high terrain heterogeneity. Five–year (2016–2020) consecutive wind observations from ...
Italian Ornithological Commission (COI) - Report 30
Italian Ornithological Commission (COI) - Report 30
Italian Ornithological Commission (COI) - Report 30. This report refers to records from January 1st 2020 to December 31st 2021, with the addition of a number of records from previo...
Effects of melatonin on in vitro oocyte maturation and embryo development in pigs
Effects of melatonin on in vitro oocyte maturation and embryo development in pigs
Background and Aim: In vitro fertilization (IVF) efficiency in pigs remains suboptimal, partly due to oxidative stress during oocyte maturation and embryo development. Melatonin (M...
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract
During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...