Javascript must be enabled to continue!
Gas in Riser - The Elephant in the Room
View through CrossRef
Abstract
Gas hydrates forming during well control events in deep water plugging kill and choke lines is a risk previously documented (Lage et al. 2002). In this paper a deep water well's temperature profile has been calculated to investigate the forming of hydrates in the wellbore casing and the riser annulus. The calculations show that water-based mud (WBM) has a large potential for cooling down the wellbore during circulation. The cold seawater surrounding the long riser act as a heat exchanger that gradually removes energy or heat from the drilling fluid. The relatively low thermal conductivity for cement will also result in the cement acting as an insulating layer against the formation, leaving the casing wall at a relative low temperature. The study shows that the temperature conditions for forming [BR1]hydrates are likely[BR2] present deep down inside the wellbore casing as well as in the wellhead, the BOP and the drilling riser.
The volume reduction when hydrates are forming may mistakenly be interpreted as loss of mud to the formation and not a result of gas influx to the wellbore. This may have safety implications. [BR3]Gas hydrates forming in the casing wellbore may also change the properties of the WBM since gas hydrates are formed using water from the mud.
The calculations also show that gas hydrates may stay stable in large part of the wellbore casing and the riser annulus and may be transported a long distance to the upper part of the riser and without any significant change in volume. If gas hydrates are transported up the riser, the released gas will expand rapidly upon the melting of the hydrates, resulting in a very limited time for the drill crew to perform the required actions.
Based on the findings in the study the authors recommend that the human factors implications of hydrates in drilling and well control should be further investigated in order to improve overall system safety.
Title: Gas in Riser - The Elephant in the Room
Description:
Abstract
Gas hydrates forming during well control events in deep water plugging kill and choke lines is a risk previously documented (Lage et al.
2002).
In this paper a deep water well's temperature profile has been calculated to investigate the forming of hydrates in the wellbore casing and the riser annulus.
The calculations show that water-based mud (WBM) has a large potential for cooling down the wellbore during circulation.
The cold seawater surrounding the long riser act as a heat exchanger that gradually removes energy or heat from the drilling fluid.
The relatively low thermal conductivity for cement will also result in the cement acting as an insulating layer against the formation, leaving the casing wall at a relative low temperature.
The study shows that the temperature conditions for forming [BR1]hydrates are likely[BR2] present deep down inside the wellbore casing as well as in the wellhead, the BOP and the drilling riser.
The volume reduction when hydrates are forming may mistakenly be interpreted as loss of mud to the formation and not a result of gas influx to the wellbore.
This may have safety implications.
[BR3]Gas hydrates forming in the casing wellbore may also change the properties of the WBM since gas hydrates are formed using water from the mud.
The calculations also show that gas hydrates may stay stable in large part of the wellbore casing and the riser annulus and may be transported a long distance to the upper part of the riser and without any significant change in volume.
If gas hydrates are transported up the riser, the released gas will expand rapidly upon the melting of the hydrates, resulting in a very limited time for the drill crew to perform the required actions.
Based on the findings in the study the authors recommend that the human factors implications of hydrates in drilling and well control should be further investigated in order to improve overall system safety.
Related Results
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract
Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Abstract
As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitatio...
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Abstract
The world's demand for metal is rising and new solutions must be explored to meet the needs associated with population growth, urbanization, decarbonized en...
The Dorada Field Production Risers
The Dorada Field Production Risers
Abstract
The Dorada Field floating production system, located offshore Spain in 310 ft of water in the Mediterranean Sea, utilizes three individual production ris...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract
The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT
Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Abstract
Although the possibility of a riser dropping off from its top hang-off point during installation or in service is minimal, such incident can pose significan...
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
ABSTRACT
This paper presents a feasibility study for design of a spar with Top-Tensioned Production Risers (TTRs) in 10,000 ft water depth. The study was sponsore...