Elevated Pipelay Initiation and Cost Optimized Lowering of Subsea Rigid Pipeline

View through CrossRef
Abstract S-lay installation methodology is an industry accepted method for the installation of subsea rigid pipelines. Pipeline initiation is a major operation during the start of S-lay and its selection is dependent on various factors including project requirements, field layout and strength of holdback. The beachpull initiation method is utilized in shallow water regions where a barge or vessel is unable to access the initiation point due to keel clearance. For most applications, however, the dead man anchor initiation method is utilized irrespective of the water depth. For the dead man anchor methodology, the type of anchor needs to be selected based on the in-situ conditions. Near the jacket, conventional dead-man anchor initiation is not feasible due to the presence of subsea assets. The holdback method provides an acceptable alternative in such cases. There are several variations of this method such as elevated holdback, vertical bow string and horizontal bow string initiation which are chosen based on operational requirements. During a project undertaken recently in the Middle East region, several initiation challenges were encountered due to congested fields owing to subsea assets and the best suitable methodology was determined which included dead man and elevated holdback initiation. It was observed that optimizing the initiation, reduced risk associated with subsea asset clashes and accelerate the schedule. For another fast track project in Asia Pacific region at deeper water depths, vertical bow string initiation was used to override challenges in reducing loads on the jacket. On the same project a modified initiation method was adopted to avoid a davit lift operation, shorten the target box distance and avoid saturation diving which helped the project avoid mobilization of a large anchored or DP barge and utilize available diving support vessel with a single crane or davit. The paper explains different challenges in pipelay initiation operations of subsea rigid pipelines and the selection of the appropriate type of initiation. It also presents recent case studies of different initiation operations with the associated challenges and benefits.
Title: Elevated Pipelay Initiation and Cost Optimized Lowering of Subsea Rigid Pipeline
Description:
Abstract S-lay installation methodology is an industry accepted method for the installation of subsea rigid pipelines.
Pipeline initiation is a major operation during the start of S-lay and its selection is dependent on various factors including project requirements, field layout and strength of holdback.
The beachpull initiation method is utilized in shallow water regions where a barge or vessel is unable to access the initiation point due to keel clearance.
For most applications, however, the dead man anchor initiation method is utilized irrespective of the water depth.
For the dead man anchor methodology, the type of anchor needs to be selected based on the in-situ conditions.
Near the jacket, conventional dead-man anchor initiation is not feasible due to the presence of subsea assets.
The holdback method provides an acceptable alternative in such cases.
There are several variations of this method such as elevated holdback, vertical bow string and horizontal bow string initiation which are chosen based on operational requirements.
During a project undertaken recently in the Middle East region, several initiation challenges were encountered due to congested fields owing to subsea assets and the best suitable methodology was determined which included dead man and elevated holdback initiation.
It was observed that optimizing the initiation, reduced risk associated with subsea asset clashes and accelerate the schedule.
For another fast track project in Asia Pacific region at deeper water depths, vertical bow string initiation was used to override challenges in reducing loads on the jacket.
On the same project a modified initiation method was adopted to avoid a davit lift operation, shorten the target box distance and avoid saturation diving which helped the project avoid mobilization of a large anchored or DP barge and utilize available diving support vessel with a single crane or davit.
The paper explains different challenges in pipelay initiation operations of subsea rigid pipelines and the selection of the appropriate type of initiation.
It also presents recent case studies of different initiation operations with the associated challenges and benefits.

Related Results

Critique of Offshore Pipelay Criteria and Its Effect on Pipeline Design
Critique of Offshore Pipelay Criteria and Its Effect on Pipeline Design
ABSTRACT The pipelay criteria currently used for pipeline design is based mainly on submarine static pipelay analysis results. The criteria recommended in the cod...
The Consequences of Accidental Pipeline or Umbilical Releases During Brownfield Pipelay Operations
The Consequences of Accidental Pipeline or Umbilical Releases During Brownfield Pipelay Operations
Abstract Compared to greenfield developments, pipeline and umbilical pipelay operations in brownfield environments are inherently more complex, requiring addition...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
In a cost constrained scenario, technology driven solutions aiming at CAPEX reductions are crucial to make Subsea Processing (SSP) projects economically attractive. Subsea Processi...
Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
Technology Focus: Subsea Systems (August 2025)
Technology Focus: Subsea Systems (August 2025)
_ From a broader and high-level perspective—considering importance, impact, significance, and criticality—subsea systems and advanced offshore engineering play an...