Material excavated from the A26 tunnel – transport and recycling
View through CrossRef
AbstractThe A26 Linzer autobahn represents one of the most complex new construction projects of Asfinag BMG, quite part from the traffic and technical challenges – location in the urban area of Linz, almost the entire route runs in tunnels or cut‐and‐cover and two large bridge structures. The tunnelled sections amount to a total length of about 3.2 km, of which about 600 m will be constructed as cut‐and‐cover. About 900,000 m3 of material will be excavated overall, of which 700,000 m3 is rock and 200,000 m3 loose ground. Particularly the transport away and the recycling of the material excavated from the tunnel will be a major challenge in the inner‐city area. The Danube will be used as a waterway for the transport of excavated material from the mined sections in order to avoid truck transport with its resulting environmental impact. The recycling of the excavated material will be done at harbour facilities available in the neighbourhood of the project.Die A26 Linzer Autobahn stellt neben ihren verkehrlichen und technischen Rahmenbedingungen – Lage im Stadtgebiet von Linz, Streckenführung praktisch zur Gänze als Tunnel‐ bzw. Unterflurtrasse, zwei große Brückenbauwerke – vor allem für die Bauausführung eines der komplexesten Neubauprojekte der Asfinag BMG dar. Die Tunnelbaustrecken umfassen eine Gesamtlänge von rund 3,2 km; davon werden rund 600 m als Unterflurtrasse oder in offener Bauweise ausgeführt. An Ausbruchmassen fallen insgesamt rund 900.000 m3 an, davon rund 700.000 m3 Festgestein und 200.000 m3 Lockermaterial. Speziell der Abtransport und die Weiterbehandlung der Tunnelausbruchmassen stellt im innerstädtischen Bereich eine große Herausforderung dar. So wird die Donau als Schifffahrtsroute für den Abtransport des Ausbruchmaterials der bergmännischen Bauweise genutzt, um LKW‐Fahrten und somit Umweltbelastungen zu vermeiden. Die Weiterverwertung der Ausbruchmassen erfolgt an den dazu zur Verfügung stehenden Hafenanlangen im Umfeld des Projekts.
Title: Material excavated from the A26 tunnel – transport and recycling
Description:
AbstractThe A26 Linzer autobahn represents one of the most complex new construction projects of Asfinag BMG, quite part from the traffic and technical challenges – location in the urban area of Linz, almost the entire route runs in tunnels or cut‐and‐cover and two large bridge structures.
The tunnelled sections amount to a total length of about 3.
2 km, of which about 600 m will be constructed as cut‐and‐cover.
About 900,000 m3 of material will be excavated overall, of which 700,000 m3 is rock and 200,000 m3 loose ground.
Particularly the transport away and the recycling of the material excavated from the tunnel will be a major challenge in the inner‐city area.
The Danube will be used as a waterway for the transport of excavated material from the mined sections in order to avoid truck transport with its resulting environmental impact.
The recycling of the excavated material will be done at harbour facilities available in the neighbourhood of the project.
Die A26 Linzer Autobahn stellt neben ihren verkehrlichen und technischen Rahmenbedingungen – Lage im Stadtgebiet von Linz, Streckenführung praktisch zur Gänze als Tunnel‐ bzw.
Unterflurtrasse, zwei große Brückenbauwerke – vor allem für die Bauausführung eines der komplexesten Neubauprojekte der Asfinag BMG dar.
Die Tunnelbaustrecken umfassen eine Gesamtlänge von rund 3,2 km; davon werden rund 600 m als Unterflurtrasse oder in offener Bauweise ausgeführt.
An Ausbruchmassen fallen insgesamt rund 900.
000 m3 an, davon rund 700.
000 m3 Festgestein und 200.
000 m3 Lockermaterial.
Speziell der Abtransport und die Weiterbehandlung der Tunnelausbruchmassen stellt im innerstädtischen Bereich eine große Herausforderung dar.
So wird die Donau als Schifffahrtsroute für den Abtransport des Ausbruchmaterials der bergmännischen Bauweise genutzt, um LKW‐Fahrten und somit Umweltbelastungen zu vermeiden.
Die Weiterverwertung der Ausbruchmassen erfolgt an den dazu zur Verfügung stehenden Hafenanlangen im Umfeld des Projekts.
Related Results
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract
Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a ve...
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Background: carpal tunnel syndrome (CTS) arises from compression of the median nerve when it passes through the carpal tunnel in the wrist. Dental professionals use vibratory instr...
Multi-Facility Location Optimization to Analyze the Economics of Plastic Recycling Systems: A Study Integrating K-Means and Monte Carlo Methods
Multi-Facility Location Optimization to Analyze the Economics of Plastic Recycling Systems: A Study Integrating K-Means and Monte Carlo Methods
Abstract
Plastic waste recycling is essential for sustainable practices, but it suffers from inefficiency due to a lack of a secondary market and difficulties in sep...
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
Influence of Lower Double-Track Tunnel Spacing on the Stress and Deformation Characteristics of Upper Tunnel in Double-Level Condominium Tunnels
The open-cut tunnels in Aixi Lake, Nanchang, are constructed in a condominium form of highway tunnel and subway tunnel, which are the first superimposed double-level tunnels in Chi...
Risk management overview of tunnels using numerical modeling
Risk management overview of tunnels using numerical modeling
PurposeThe purpose of this paper is to introduce the numerical methods in tunnel engineering and their capabilities to indicate the fracture and failure in all kinds of tunneling m...
The Effect of Intersection Angle on the Failure Mechanism of Utility Tunnel
The Effect of Intersection Angle on the Failure Mechanism of Utility Tunnel
Planning utility tunnel network in the area with geological disasters poses serious concerns, especial for the utility tunnel built in the ground fissures developed cities. Many pr...
Optimal Knee Flexion Angle for ACL Femoral Tunnel Drilling and ALL Femoral Tunnel Orientation in Combined ACL and ALL Reconstruction: 3D Simulation Study
Optimal Knee Flexion Angle for ACL Femoral Tunnel Drilling and ALL Femoral Tunnel Orientation in Combined ACL and ALL Reconstruction: 3D Simulation Study
Background:
In combined anterior cruciate ligament (ACL) and anterolateral ligament (ALL) reconstruction, there is a risk of collision between the femoral tunnels of th...