Javascript must be enabled to continue!
Process Control Ladder Logic Trouble Shooting Techniques Fundamentals
View through CrossRef
Programmable Logic Controller (PLC) based process control automation projects are a multiphase task requiring months of planning, specification documentation, design, implementation, debugging, and final commissioning. Debugging real time process control implementation is a three-phase process; logic simulation debugging, field static checkout, and in plant final testing and tuning. This paper briefly discusses the fundamental techniques used in the first two stages of implemented ladder logic debugging [5, 6]. A wastewater treatment facility for the processing of high flow storm rainwater using the Allen Bradley (AB) SLC 500 PLC is used to illustrate the concepts discussed. The rainwater is channeled to two large wet wells, the east wet well and the west wet well. The water is pumped to the river from the two connected wells at constant rate using a predefined process sequence control. Pumping station with multi motors deriving constant speed immersed pumps are used to regulate the discharge water flow and the level in the two wells. Only two pumps are assumed here; one in the east wet well and the other in the west wet well. The motors provide an input discrete signal indicating if the motor is running or not. The motors can also start by activating the Push Button located on the local panel if the AUTO/MAN switch is in Manual. Three float switches are used to provide an accurate indication of the water level at three prespecified critical east / west wet well locations. The Low-Level Float switch triggers the stopping of the running pump. The High-level Float switch triggers the starting of the scheduled pump. If the scheduled pump fails to start within more than 5 seconds, a backup pump is selected and started (not shown in this paper). An alarm must be issued in order to alert the operator of any motor failure. The Very High-level float switch triggers the starting of both pumps. If either of the two pumps fails to start the corresponding alarm is activated by the control. Pumps are scheduled to run according to an operator pre-defined calendar. This input is expected in hours of accumulated total pump run time. The two pumps must alternate while the water level is below the Very High Level and above the Low Level. Cascaded timers are not altered during the time when the two pumps are running. This paper shows the static and simulation debugging an abbreviated version of the typical original system used in wastewater facilities.
Inventive Research Organization
Title: Process Control Ladder Logic Trouble Shooting Techniques Fundamentals
Description:
Programmable Logic Controller (PLC) based process control automation projects are a multiphase task requiring months of planning, specification documentation, design, implementation, debugging, and final commissioning.
Debugging real time process control implementation is a three-phase process; logic simulation debugging, field static checkout, and in plant final testing and tuning.
This paper briefly discusses the fundamental techniques used in the first two stages of implemented ladder logic debugging [5, 6].
A wastewater treatment facility for the processing of high flow storm rainwater using the Allen Bradley (AB) SLC 500 PLC is used to illustrate the concepts discussed.
The rainwater is channeled to two large wet wells, the east wet well and the west wet well.
The water is pumped to the river from the two connected wells at constant rate using a predefined process sequence control.
Pumping station with multi motors deriving constant speed immersed pumps are used to regulate the discharge water flow and the level in the two wells.
Only two pumps are assumed here; one in the east wet well and the other in the west wet well.
The motors provide an input discrete signal indicating if the motor is running or not.
The motors can also start by activating the Push Button located on the local panel if the AUTO/MAN switch is in Manual.
Three float switches are used to provide an accurate indication of the water level at three prespecified critical east / west wet well locations.
The Low-Level Float switch triggers the stopping of the running pump.
The High-level Float switch triggers the starting of the scheduled pump.
If the scheduled pump fails to start within more than 5 seconds, a backup pump is selected and started (not shown in this paper).
An alarm must be issued in order to alert the operator of any motor failure.
The Very High-level float switch triggers the starting of both pumps.
If either of the two pumps fails to start the corresponding alarm is activated by the control.
Pumps are scheduled to run according to an operator pre-defined calendar.
This input is expected in hours of accumulated total pump run time.
The two pumps must alternate while the water level is below the Very High Level and above the Low Level.
Cascaded timers are not altered during the time when the two pumps are running.
This paper shows the static and simulation debugging an abbreviated version of the typical original system used in wastewater facilities.
Related Results
PERBEDAAN PENGARUH LATIHAN PRESSURE SHOOTING DRILLS DAN PASSING SHOOTING TERHADAP KEMAMPUAN SHOOTING DALAM PERMAINAN SEPAK BOLA PADA ATLET PUTRA SSB GANESHA PUTRA GROBOGAN
PERBEDAAN PENGARUH LATIHAN PRESSURE SHOOTING DRILLS DAN PASSING SHOOTING TERHADAP KEMAMPUAN SHOOTING DALAM PERMAINAN SEPAK BOLA PADA ATLET PUTRA SSB GANESHA PUTRA GROBOGAN
Tujuan penelitian untuk mengetahui perbedaan pengaruh latihan pressure shooting drills dan passing shooting terhadap kemampuan shooting terhadap kemampuan shooting dalam permainan ...
Asking for Trouble
Asking for Trouble
The first thing you do when you begin your PhD is label your Endnote library “the woods.” Your supervisor has warned you: you must not get lost. I know you, your supervisor says,...
THE EFFECT OF BODY MASS INDEX, BALANCE AND POWER TO SHOOTING OF WOMEN FUTSAL
THE EFFECT OF BODY MASS INDEX, BALANCE AND POWER TO SHOOTING OF WOMEN FUTSAL
Penelitian ini bertujuan untuk mengetahui pengaruh body mass index (BMI), keseimbangan dinamis dan daya ledak otot tungkai terhadap hasil shooting futsal putri. Subjek penelitian a...
UPAYA MENINGKATKAN AKURASI SHOOTING 3POINT DENGAN MENGGUNAKAN MEDIA J-GLOVE PADA TIM PUTRA BOLA BASKET UNIVERSITAS NEGERI JAKARTA
UPAYA MENINGKATKAN AKURASI SHOOTING 3POINT DENGAN MENGGUNAKAN MEDIA J-GLOVE PADA TIM PUTRA BOLA BASKET UNIVERSITAS NEGERI JAKARTA
ABSTRAK
Peneli tian ini bertujuan untuk mengkaji peningkatan hasil shooting dengan menggunakan media J-Glove pada mahasiswa (atlet) yang tergabung dalam Tim Putra Bol...
Assessing Illegal Shooting of Birds Along Power Lines
Assessing Illegal Shooting of Birds Along Power Lines
Birds found dead near power lines typically are assumed to have died from electrocution. However, birds die from many causes, and inaccurate diagnosis of cause of death undermines ...
MECHANISMS OF SCHEMATIC MODELING BASED ON VECTOR LOGIC
MECHANISMS OF SCHEMATIC MODELING BASED ON VECTOR LOGIC
Context. This paper addresses issues relevant to the EDA market – reducing the cost and time of testing and verification of digital projects by synthesizing the logic vector of a d...
PENGARUH METODE LATIHAN DRIBBLE SHOOT DAN THROUGH PASS SHOOT TERHADAP KEMAMPUAN SHOOTING DALAM SEPAKBOLA (Study Eksperimen pada SSB Safo Jomblo Slogohimo Usia 14-16 Tahun 2022)
PENGARUH METODE LATIHAN DRIBBLE SHOOT DAN THROUGH PASS SHOOT TERHADAP KEMAMPUAN SHOOTING DALAM SEPAKBOLA (Study Eksperimen pada SSB Safo Jomblo Slogohimo Usia 14-16 Tahun 2022)
ABSTRAK
Tujuan penelitian untuk mengetahui Perbedaan Pengaruh Metode Latihan Drible Shoot dan Through Pass Shoot Terhadap Kemampuan Shooting Dalam Sepakbola Pada Anak Usia 1...
Logic in the early 20th century
Logic in the early 20th century
The creation of modern logic is one of the most stunning achievements of mathematics and philosophy in the twentieth century. Modern logic – sometimes called logistic, symbolic log...

