Ceiba Field Operational History
View through CrossRef
Abstract
This paper describes the operational history for the Ceiba Field. The FPSO vessel and process equipment is detailed together with external support required for servicing the facility and exporting crude oil. Areas of particular interest including operational problems and the related solutions are also detailed.
Introduction
The Ceiba field, offshore Equatorial Guinea, West Africa was discovered in October 1999. The water depth at the field is approximately 700m. Development of the prospect started immediately leading ultimately to fist oil being produced from four subsea wells tied back to an FPSO approximately 5 miles distant. Hydrocarbons were first received on the FPSO Sendje Berge on November 22nd, 2000, fourteen months after discovery. To achieve this difficult task many engineering judgements were made with a view to maintaining flexibility of the surface and subsea systems in the future. The following paper describes the operational history together with the steps that were taken prior to production to maximize production uptime.
The field to this point has been developed in two phases. The first phase is namely "Phase 1" which includes wells Ceiba 1, Ceiba 2, Ceiba 3, Ceiba 4 and Ceiba 7. The second phase "Phase 1A" includes additional production and water injection wells. Part of the Phase 1A development inclided changing out the existing FPSO for an upgraded FPSO.
Facility Description
The FPSO Sendje Berge is a VLCC (Very Large Crude Carrier) taken from the Bergesen shipping fleet and converted to an FPSO by adding process facilities and modifying the ships systems. The FPSO was moored in position using twelve pre-installed anchors. Production from subsea wells was routed to the FPSO from the wells via 8" flowlines and flexible risers to compensate for vessel motion.
Production history from the field aided in the specification and construction of a modified vessel (FPSO Sendje Ceiba) and ultimately the replacement of the Sendje Berge with the Sendje Ceiba.
Production Statistics
Ceiba first oil was on November 22, 2000. Since first oil, up until January 12, 2002 when the Sendje Berge was changed out for the Sendje Ceiba, 13,014,182 barrels of oil have been produced and exported. Nineteen export operations were conducted using a bow to bow transfer method. All produced gas that is not used as fuel gas is flared. Produced water is treated on board to reduce hydrocarbon content and insure that environmental criteria are met before being discharged overboard.
The average facilities uptime for the 14 months that the Sendje Berge was producing was 98.73%.
Bergesen Offshore provided the marine crew on board the Sendje Berge. The crew is responsible for maintaining the ship's facilities including steam used for crude heating, generation of electrical power and exporting operations. Approximately sixty people are regularly stationed on the Sendje Berge to provide this support. ABB Offshore provided the personnel to support the process facilities, a total of 10 make up the compliment of production crew.
Title: Ceiba Field Operational History
Description:
Abstract
This paper describes the operational history for the Ceiba Field.
The FPSO vessel and process equipment is detailed together with external support required for servicing the facility and exporting crude oil.
Areas of particular interest including operational problems and the related solutions are also detailed.
Introduction
The Ceiba field, offshore Equatorial Guinea, West Africa was discovered in October 1999.
The water depth at the field is approximately 700m.
Development of the prospect started immediately leading ultimately to fist oil being produced from four subsea wells tied back to an FPSO approximately 5 miles distant.
Hydrocarbons were first received on the FPSO Sendje Berge on November 22nd, 2000, fourteen months after discovery.
To achieve this difficult task many engineering judgements were made with a view to maintaining flexibility of the surface and subsea systems in the future.
The following paper describes the operational history together with the steps that were taken prior to production to maximize production uptime.
The field to this point has been developed in two phases.
The first phase is namely "Phase 1" which includes wells Ceiba 1, Ceiba 2, Ceiba 3, Ceiba 4 and Ceiba 7.
The second phase "Phase 1A" includes additional production and water injection wells.
Part of the Phase 1A development inclided changing out the existing FPSO for an upgraded FPSO.
Facility Description
The FPSO Sendje Berge is a VLCC (Very Large Crude Carrier) taken from the Bergesen shipping fleet and converted to an FPSO by adding process facilities and modifying the ships systems.
The FPSO was moored in position using twelve pre-installed anchors.
Production from subsea wells was routed to the FPSO from the wells via 8" flowlines and flexible risers to compensate for vessel motion.
Production history from the field aided in the specification and construction of a modified vessel (FPSO Sendje Ceiba) and ultimately the replacement of the Sendje Berge with the Sendje Ceiba.
Production Statistics
Ceiba first oil was on November 22, 2000.
Since first oil, up until January 12, 2002 when the Sendje Berge was changed out for the Sendje Ceiba, 13,014,182 barrels of oil have been produced and exported.
Nineteen export operations were conducted using a bow to bow transfer method.
All produced gas that is not used as fuel gas is flared.
Produced water is treated on board to reduce hydrocarbon content and insure that environmental criteria are met before being discharged overboard.
The average facilities uptime for the 14 months that the Sendje Berge was producing was 98.
73%.
Bergesen Offshore provided the marine crew on board the Sendje Berge.
The crew is responsible for maintaining the ship's facilities including steam used for crude heating, generation of electrical power and exporting operations.
Approximately sixty people are regularly stationed on the Sendje Berge to provide this support.
ABB Offshore provided the personnel to support the process facilities, a total of 10 make up the compliment of production crew.
Related Results
IDENTIFICAÇÃO DE GEOFÁCIES DAS ÁREAS DE OCORRÊNCIA DO PSITACÍDEO BROTOGERIS CHIRIRI NA ÁREA CENTRAL DA ILHA DO MARANHÃO (MA) PELO MÉTODO DE AVISTAMENTO
IDENTIFICAÇÃO DE GEOFÁCIES DAS ÁREAS DE OCORRÊNCIA DO PSITACÍDEO BROTOGERIS CHIRIRI NA ÁREA CENTRAL DA ILHA DO MARANHÃO (MA) PELO MÉTODO DE AVISTAMENTO
A pesquisa surge com o intuito de expandir e estimular o estudo sobre a avifauna brasileira, nesse caso em específico, a espécie Brotogeris chiriri. Objetivando entender os fatores...
Bombax Ceiba Flower Mucilage as Natural Pharmaceutical Excipient: Isolation, Characterization and Evaluation
Bombax Ceiba Flower Mucilage as Natural Pharmaceutical Excipient: Isolation, Characterization and Evaluation
The goal of the current study was to separate the mucilage from the Bombax Ceiba flower petals and investigate its potential use as a pharmaceutical excipient. Bombax Ceiba flower ...
Operational Art
Operational Art
The art of warfare is practiced in three levels: the strategic, operational, and tactical. Operational art refers to the military commander’s employment of force in a theater of op...
Protection of Bombax Ceiba by Revealing their Fungal Endophytic Diversity and Therapeutic Applications
Protection of Bombax Ceiba by Revealing their Fungal Endophytic Diversity and Therapeutic Applications
The objective of the present research investigation was to protect Bombax ceiba by revealing their endophytic fungi diversity for disease management. In the present research invest...
Antitrypanosomal and Anthelminthic Properties of Ethanol Extracts of Carica papaya Linn. and Ceiba pentandra (L) Gaertn.
Antitrypanosomal and Anthelminthic Properties of Ethanol Extracts of Carica papaya Linn. and Ceiba pentandra (L) Gaertn.
The most common diseases that affect low-income countries are helminthosis and trypanosomosis. In Ghana, and in many other African countries, herbal treatment of various diseases i...
Résistance de Helicobacter pylori aux antibiotiques et d’autres substances antimicrobiennes. : Aspects moléculaires des mécanismes de détection
Résistance de Helicobacter pylori aux antibiotiques et d’autres substances antimicrobiennes. : Aspects moléculaires des mécanismes de détection
Contexte : Amélioration de la prise en charge de l’infection à H. pylori. Matériels et Méthodes : Détection de H. pylori, la résistance à la clarithromycine, la tétracycline, la lé...
Phytochemical Screening and Antimicrobial Activities of Leaves of Bombax ceiba L.
Phytochemical Screening and Antimicrobial Activities of Leaves of Bombax ceiba L.
Bombax ceiba L. is a multi-purpose and fast-growing tree belonging to family Bombacaceae. It has astringent, diuretic, anti-diarrheal, etc. properties and also finds its uses in ph...
Indigenous artificial limb of Bombax ceiba L. (Bombacaceae) wood-A novel ethnobotanical use
Indigenous artificial limb of Bombax ceiba L. (Bombacaceae) wood-A novel ethnobotanical use
Bombax ceiba L. (Semal) is a large, deciduous tree which is very popular among indigenous communities for its multidimensional importance. It is not only a part of various socio-cu...