Risk Analysis Of Bogie Maintenance TB 1014 Using FMEA Method
View through CrossRef
ABSTRACTThe bogie is a vital component in the railway system that functions to support the load, maintain stability, and ensure the smooth running of the train. Damage to the bogie can cause safety problems and reduce passenger comfort. This study aims to analyze the risk of failure of the TB 1014 bogie component on the K3 01430 train using the Failure Mode and Effect Analysis (FMEA) method as a case study at the Surabaya Pasar Turi (SBI) Train Depo. Data were collected through field observations, technician interviews, and bogie component inspections. The analysis was carried out by assessing the Severity, Occurrence, and Detection parameters to obtain the Risk Priority Number (RPN) value for each component. The results showed that the shock absorber, block brake sprinkler, and wheels had the highest RPN values of 140, 120, and 108, respectively, which were maintenance priorities. All components had RPNs below 200 so the recommended maintenance strategy was corrective maintenance. The FMEA method has proven effective in helping to identify, assess, and prioritize failure risks, so that it can be used as a basis for developing more targeted maintenance strategies and increasing train operational reliability.
Title: Risk Analysis Of Bogie Maintenance TB 1014 Using FMEA Method
Description:
ABSTRACTThe bogie is a vital component in the railway system that functions to support the load, maintain stability, and ensure the smooth running of the train.
Damage to the bogie can cause safety problems and reduce passenger comfort.
This study aims to analyze the risk of failure of the TB 1014 bogie component on the K3 01430 train using the Failure Mode and Effect Analysis (FMEA) method as a case study at the Surabaya Pasar Turi (SBI) Train Depo.
Data were collected through field observations, technician interviews, and bogie component inspections.
The analysis was carried out by assessing the Severity, Occurrence, and Detection parameters to obtain the Risk Priority Number (RPN) value for each component.
The results showed that the shock absorber, block brake sprinkler, and wheels had the highest RPN values of 140, 120, and 108, respectively, which were maintenance priorities.
All components had RPNs below 200 so the recommended maintenance strategy was corrective maintenance.
The FMEA method has proven effective in helping to identify, assess, and prioritize failure risks, so that it can be used as a basis for developing more targeted maintenance strategies and increasing train operational reliability.
Related Results
A critical analysis of the AIAG-VDA FMEA; does the newly released AIAG-VDA method offer improvements over the former AIAG method?
A critical analysis of the AIAG-VDA FMEA; does the newly released AIAG-VDA method offer improvements over the former AIAG method?
After several years of collaboration, The Automotive Industry Action Group (AIAG) and The German Association of the Automotive Industry (VDA) completed a harmonized version of thei...
Pemeliharaan Korektif Pada Kerusakan Bogie Pada Bucket Wheel Excavator
Pemeliharaan Korektif Pada Kerusakan Bogie Pada Bucket Wheel Excavator
Corrective maintenance merupakan langkah perawatan yang dilakukan setelah terjadinya kerusakan, salah satunya pada komponen bogie pada Bucket Wheel Excavator (BWE). Kerusakan bogie...
PENGUJIAN SUHU LEMARI ES DENGAN METODE TERINTEGRASI FUZZYFAILURE MODE AND EFFECT ANALYSIS (FUZZY-FMEA)
PENGUJIAN SUHU LEMARI ES DENGAN METODE TERINTEGRASI FUZZYFAILURE MODE AND EFFECT ANALYSIS (FUZZY-FMEA)
Failure Mode and Effect Analysis (FMEA) banyak diimplementasikan untuk analisis risiko baik di bidang manufaktur maupun jasa. Permasalahan yang sering timbul pada implementasi FMEA...
Mid-Life Refurbishment Maintenance Strategy to Sustain Performance and Reliability of Train System
Mid-Life Refurbishment Maintenance Strategy to Sustain Performance and Reliability of Train System
Mid-Life Refurbishment (MLR) is a process conducted in many industries to improve or extend the life span of assets such as machines, infrastructures and systems. The objective of ...
An Investigation in Implementation of Maintenance Models in Higher Learning Institutions in Gaborone
An Investigation in Implementation of Maintenance Models in Higher Learning Institutions in Gaborone
ABSTRACT
Purpose :
To investigate on the implementation of maintenance models and techniques used when executing facilities main...
An integrated fuzzy-FMEA risk assessment approach for reinforced concrete structures in oil and gas industry
An integrated fuzzy-FMEA risk assessment approach for reinforced concrete structures in oil and gas industry
The oil and gas industry is one of the harshest environments on reinforced concrete structures. Enhancing the reliability of these industries has been identified as a critical goal...
Smart Maintenance: Enhancing Maintenance Effectiveness at Pace with Artificial Intelligence
Smart Maintenance: Enhancing Maintenance Effectiveness at Pace with Artificial Intelligence
Abstract
Objectives/Scope
The integration of Artificial Intelligence (AI) in production operations within the oil and gas indust...
Quality Control Analysis of Tofu Products at Sari Murni Factory Using SQC and FMEA Methods
Quality Control Analysis of Tofu Products at Sari Murni Factory Using SQC and FMEA Methods
This study analyzes quality control for tofu products at SM Sari Murni Tofu Factory using Statistical Quality Control (SQC) and Failure Mode and Effect Analysis (FMEA) methods. The...