Application of Thick Salt-Gypsum Formation Cementing Technology in KS Gas Field

View through CrossRef
Abstract The most challenging cementing problems that been encountered in KS gas field of Tarim oilfield in China occurred in the salt-gypsum formation having the thickness of about 1000~3000m and the maximum depth of 7000m above. In most cases, there are high pressure saltwater layers among the salt-gypsum formation with the highest pressure gradient of 2.60g/cm3. HPHT (130 MPa, 160 °C, BHST), ultra deep well and narrow safety density window with the density of about 0.07-0.12 g/cm3 brought huge problems which made the well cementing very hard to achieve good bonding quality, especially for production liner cementing. The qualification rate of cementing quality of the salt-gypsum formation section was only about 40% in 2013. The bad cement bonding quality was recognized as one of the main reasons for this issue, which was the one of the top headaches for the operator. To answer these challenges, the ultra-high strength toughness casing, casing running downhole simulating technology, salt-tolerant spacer fluid and high density cement slurry, and step by step pressurized casing annular cement until cement set have been developed and applied successfully. The qualification rate of cementing quality of the salt-gypsum Layer section increased to 78% in 2014. The successful application of these techniques improving cementing quality of the significant thick salt-gypsum formation under the extremely challenging downhole condition promoted the exploration and development of ultra-deep subsalt reservoirs in China.
Title: Application of Thick Salt-Gypsum Formation Cementing Technology in KS Gas Field
Description:
Abstract The most challenging cementing problems that been encountered in KS gas field of Tarim oilfield in China occurred in the salt-gypsum formation having the thickness of about 1000~3000m and the maximum depth of 7000m above.
In most cases, there are high pressure saltwater layers among the salt-gypsum formation with the highest pressure gradient of 2.
60g/cm3.
HPHT (130 MPa, 160 °C, BHST), ultra deep well and narrow safety density window with the density of about 0.
07-0.
12 g/cm3 brought huge problems which made the well cementing very hard to achieve good bonding quality, especially for production liner cementing.
The qualification rate of cementing quality of the salt-gypsum formation section was only about 40% in 2013.
The bad cement bonding quality was recognized as one of the main reasons for this issue, which was the one of the top headaches for the operator.
To answer these challenges, the ultra-high strength toughness casing, casing running downhole simulating technology, salt-tolerant spacer fluid and high density cement slurry, and step by step pressurized casing annular cement until cement set have been developed and applied successfully.
The qualification rate of cementing quality of the salt-gypsum Layer section increased to 78% in 2014.
The successful application of these techniques improving cementing quality of the significant thick salt-gypsum formation under the extremely challenging downhole condition promoted the exploration and development of ultra-deep subsalt reservoirs in China.

Related Results

Analysis of Sticking and the Releasing Technology of the Composite Gypsum-Salt Rock in the Tarim Basin
Analysis of Sticking and the Releasing Technology of the Composite Gypsum-Salt Rock in the Tarim Basin
ABSTRACT: The Kuqa FoId-Thrust BeIt in Tarim Basin is verified as the most challenging geological structure for ultra-deep hydrocarbon development in China onshor...
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
A Deep Dive on Stage Cementing Operations in Sub-Saharan Africa: A Case Study
Abstract Cementing through weak sand and unconsolidated formations are a common occurrence in today's drilling operations. Main challenges include well control, poor...
Performance Experiment of Ultra high Temperature Cementing Slurry System
Performance Experiment of Ultra high Temperature Cementing Slurry System
Abstract The continuous development of oil and gas exploration and development to deep and ultra deep wells in China, the formation temperature is also getting higher and h...
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Full Offline Well Cementing Implementation Resulting in Significant Time Savings and Improvement in Operational Efficiency
Abstract The current global low oil price environment has driven many operators to consider having a quicker and more efficient operations and reduction of the well ...
Thermal Anomalies Around Evolving Salt Sheets
Thermal Anomalies Around Evolving Salt Sheets
ABSTRACT The thermal conductivity of salt is about a factor three larger than that of sediments at sediment surface temperatures. The increase of sedimentary ther...
First Look-Ahead VSP Guided Salt Dome Island Exploration Well Drilling in the UAE
First Look-Ahead VSP Guided Salt Dome Island Exploration Well Drilling in the UAE
Abstract An exploration well offshore UAE, which was the first of it's kind, was planned to be drilled from an island and within salt dome. Well planning was based o...