The Uneven Settlement Cause and Settlement Prediction of Xi Ying Sluice

View through CrossRef
Xi Ying sluice built in Xishi River, Changzhou City, is a single span sluice with width of 6m. The chamber is pier wall structure of depressed reinforced concrete floor, when the chamber had a filling and discharging water during construction period, we found that the chamber appeared large uneven subsidence. According to the design, construction and other specific circumstances of Xi Ying sluice, by using three-dimensional finite element method to calculate and analyzed the settlement of the sluice, we studied on the genesis of the uneven settlement and predicted the settlement after the running. Analysis shows that the chamber of the uneven settlement is due to the jacking effect of concrete pile. The settlement has been basically completed caused by chamber weight, there will not be a substantial settlement; In the case of blocking water during operation period, chamber’s settlement increment outside the river side and inside the river side are respectively 0.3mm and 0.4mm; through processing, the settlement of chamber won’t affect the normal operation of sluice.
Title: The Uneven Settlement Cause and Settlement Prediction of Xi Ying Sluice
Description:
Xi Ying sluice built in Xishi River, Changzhou City, is a single span sluice with width of 6m.
The chamber is pier wall structure of depressed reinforced concrete floor, when the chamber had a filling and discharging water during construction period, we found that the chamber appeared large uneven subsidence.
According to the design, construction and other specific circumstances of Xi Ying sluice, by using three-dimensional finite element method to calculate and analyzed the settlement of the sluice, we studied on the genesis of the uneven settlement and predicted the settlement after the running.
Analysis shows that the chamber of the uneven settlement is due to the jacking effect of concrete pile.
The settlement has been basically completed caused by chamber weight, there will not be a substantial settlement; In the case of blocking water during operation period, chamber’s settlement increment outside the river side and inside the river side are respectively 0.
3mm and 0.
4mm; through processing, the settlement of chamber won’t affect the normal operation of sluice.

Related Results

Prediction on Changes of Seabed due to Sluice Built on entrance of Haiyou Branch in Sanmen Bay
Prediction on Changes of Seabed due to Sluice Built on entrance of Haiyou Branch in Sanmen Bay
Abstract Haiyou branch is the main branch of Sanmen Bay, it is an optional plan to construct sluice at the entrance of Haiyou branch to store fresh water for the uti...
Flow Measurements Using a Sluice Gate; Analysis of Applicability
Flow Measurements Using a Sluice Gate; Analysis of Applicability
This study analyzes the possibilities of using an irrigation sluice gate in submerged conditions to measure water flow rate. Hydraulic experiments on sluice gate discharge capacity...
En skvatmølle i Ljørring
En skvatmølle i Ljørring
A Horizontal Mill at Ljørring, Jutland.Horizontal water-mills have been in use in Jutland since the beginning of the Christian era 2). But the one here described shows so close a c...
Effects of Sluice Interception on Water Quality and Spirogyra in the Typical Irrigation Ditches of Jianghan Plain, China
Effects of Sluice Interception on Water Quality and Spirogyra in the Typical Irrigation Ditches of Jianghan Plain, China
To elucidate water quality evolution and algal responses in sluice-controlled ditches, this study combined in situ monitoring (July–October 2025) in the Chong Lake Watershed of Jia...
Study on the Deposition Reduction Effect of the Sediment–Sluice Tunnel in Zengwen Reservoir
Study on the Deposition Reduction Effect of the Sediment–Sluice Tunnel in Zengwen Reservoir
Reservoirs are a crucial part of the human water supply system. The effectiveness and service life of a reservoir is decided mainly by its storage capacity, and as such, preventing...
Bed configuration under sluice gate at Sandy–Loam Bed Channel
Bed configuration under sluice gate at Sandy–Loam Bed Channel
Sluice gate operation is necessary to keep the continuity the design discharge. The mis-operation of sluice gate occurs endanger stucture and destruct the bed irrigation channel. I...
An investigation into gravity independent oscillating heat pipes
An investigation into gravity independent oscillating heat pipes
[ACCESS RESTRICTED TO THE UNIVERSITY OF MISSOURI AT AUTHOR'S REQUEST.] A number of oscillating heat pipes (OHPs) with unbalanced structures were investigated in an effort to develo...
Distributions of phosphorus fractions in the sediments of a river–lake system: a case study in Huai River catchment area, China
Distributions of phosphorus fractions in the sediments of a river–lake system: a case study in Huai River catchment area, China
Phosphorus (P) forms, with respect to sediment characteristics, and an in-stream sluice were studied in the river–lake system, Huai River catchment area, China. The mean of total P...

Back to Top