Javascript must be enabled to continue!
Effect of Piping Configuration on Determining Alarm Response Time in HP Scrubber Using Dynamic Simulation
View through CrossRef
The HP scrubber is an equipment used to separate liquid from gas in the oil and gas industry. The low liquid level in the vessel is one of the abnormal conditions in the HP scrubber, a blowby gas event will happen because of a low level. So, the controller level indicator is required to prevent system damage and workplace accidents. The alarm response time is calculated in order to avoid an accident. To determine the alarm response time for a HP scrubber, a dynamic process simulation method can be used using Aspen HYSYS version 12. In a process simulation modeling also requires a process description that can describe real-world conditions, one of which is the condition of the existing piping in the system. Failure scenarios caused a process to have abnormal conditions, allowing the alarm response time to be calculated, and it can be modelled by using the event scheduler facility In Aspen HYSYS. The HP scrubber's maximum alarm response time without pipe segments and with the addition of 16 m pipe segments are 2.42 minutes and 2.56 minutes. Meanwhile, the time from alarm to failure on the HP Scrubber without and with the addition of 16 m pipe are 13.60 minutes and 28.70 minutes, respectively. So, the length of segment pipes added to the pipe configuration does not really affect the alarm response time. However, it can affect the time until a process failure occurs.
Politeknik Negeri Bandung
Title: Effect of Piping Configuration on Determining Alarm Response Time in HP Scrubber Using Dynamic Simulation
Description:
The HP scrubber is an equipment used to separate liquid from gas in the oil and gas industry.
The low liquid level in the vessel is one of the abnormal conditions in the HP scrubber, a blowby gas event will happen because of a low level.
So, the controller level indicator is required to prevent system damage and workplace accidents.
The alarm response time is calculated in order to avoid an accident.
To determine the alarm response time for a HP scrubber, a dynamic process simulation method can be used using Aspen HYSYS version 12.
In a process simulation modeling also requires a process description that can describe real-world conditions, one of which is the condition of the existing piping in the system.
Failure scenarios caused a process to have abnormal conditions, allowing the alarm response time to be calculated, and it can be modelled by using the event scheduler facility In Aspen HYSYS.
The HP scrubber's maximum alarm response time without pipe segments and with the addition of 16 m pipe segments are 2.
42 minutes and 2.
56 minutes.
Meanwhile, the time from alarm to failure on the HP Scrubber without and with the addition of 16 m pipe are 13.
60 minutes and 28.
70 minutes, respectively.
So, the length of segment pipes added to the pipe configuration does not really affect the alarm response time.
However, it can affect the time until a process failure occurs.
.
Related Results
NGL Recovery - A New Concept for an Old Scrubber
NGL Recovery - A New Concept for an Old Scrubber
Abstract
Gas scrubbers are designed to protect process equipment, such as compressors, dehydration towers, pipelines and molecular sieves from liquids. The efficienc...
Animal Alarm Calls
Animal Alarm Calls
Alarm calls are broadly defined as calls occurring in a predator context. Alarm calls have been the subject of intense scrutiny in animal communication research, as they are releva...
Low Temperature Piping Support Challenges & Mitigation
Low Temperature Piping Support Challenges & Mitigation
Abstract
Piping systems having service temperatures lower than ambient present a challenge for the pipe support design. Pipe supports for these cold piping systems a...
Modelling and Simulation of a Wet Scrubber System
Modelling and Simulation of a Wet Scrubber System
Shipping is a relatively clean transport method with low emissions per ton-mile compared with road transport. However, harmful emissions emitted in coastal areas are a concern, as ...
RANCANG BANGUN VENTURI SCRUBBER TERHADAP PENURUNAN EMISI JELAGA
RANCANG BANGUN VENTURI SCRUBBER TERHADAP PENURUNAN EMISI JELAGA
The industrial world and vehicles that currently exist make the pollution level increase. Often we see thick smoke rising out of the factory chimney, the thick smoke is a waste of ...
Safety Restraint System for High-Pressure Oilfield Piping
Safety Restraint System for High-Pressure Oilfield Piping
Abstract
Conveying energized fluid through piping presents a significant hazard with the potential for explosion in the event of a component failure. A method is ...
Clinical Alarm Awareness, Management Challenges, and Alarm Fatigue Among ICU Nurses
Clinical Alarm Awareness, Management Challenges, and Alarm Fatigue Among ICU Nurses
Abstract
Background
Clinical alarms play a crucial role in ensuring patient safety in intensive care units (ICUs). However, excessive alarms and ineffective alarm managemen...
Ensuring the Reliability of Offshore Gas Compression Systems
Ensuring the Reliability of Offshore Gas Compression Systems
Summary
Selection of offshore gas equipment is based on intended application, efficiency, reliability, and compatibility with platform structural requirements. Th...

