Study on Optimization of Stope Structural Parameters and Filling Scheme of Wawu Phosphate Mine in Yichang City, China

View through CrossRef
Reasonable stope structural parameters are very important to ensure the safety and efficiency of mining. In this paper, based on the elastic-plastic constitutive model of Mohr-Coulomb strength criterion, the reasonable span and critical span are calculated by using simply supported beam theory and mine room width calculation formula. PLAXIS2D finite element analysis software was used to conduct numerical simulation research on 7 m × 9 m, 5 m × 12 m stope structure parameter schemes and 7 m × 9m, 5 m × 12 m waste rock filling schemes. The optimal structure parameters of the stope were determined based on the calculation and analysis of displacement variation rule, surrounding rock stress distribution and plastic zone. The analysis and simulation results show that Case 1 one-time mining 7 m × 9 m and Case 3 one-time mining 5 m × 12 m, the plastic zone is connected, the simulation calculation is not convergent, and the stope is unstable. Case 2 waste rock filling 7 m × 9 m and Case 4 waste rock filling 5 m × 12 m, the distribution and change of stress, displacement and plastic zone in the goaf under the two cases are compared, and finally the waste rock filling 7 m × 9 m is obtained can improve the economy and safety of mining in the mining area, and verify the feasibility of implementing stope structural parameters and waste rock filling mining system is verified.
Title: Study on Optimization of Stope Structural Parameters and Filling Scheme of Wawu Phosphate Mine in Yichang City, China
Description:
Reasonable stope structural parameters are very important to ensure the safety and efficiency of mining.
In this paper, based on the elastic-plastic constitutive model of Mohr-Coulomb strength criterion, the reasonable span and critical span are calculated by using simply supported beam theory and mine room width calculation formula.
PLAXIS2D finite element analysis software was used to conduct numerical simulation research on 7 m × 9 m, 5 m × 12 m stope structure parameter schemes and 7 m × 9m, 5 m × 12 m waste rock filling schemes.
The optimal structure parameters of the stope were determined based on the calculation and analysis of displacement variation rule, surrounding rock stress distribution and plastic zone.
The analysis and simulation results show that Case 1 one-time mining 7 m × 9 m and Case 3 one-time mining 5 m × 12 m, the plastic zone is connected, the simulation calculation is not convergent, and the stope is unstable.
Case 2 waste rock filling 7 m × 9 m and Case 4 waste rock filling 5 m × 12 m, the distribution and change of stress, displacement and plastic zone in the goaf under the two cases are compared, and finally the waste rock filling 7 m × 9 m is obtained can improve the economy and safety of mining in the mining area, and verify the feasibility of implementing stope structural parameters and waste rock filling mining system is verified.

Related Results

JENIS DAN FUNGSI HURUF WAWU DALAM SURAH AL-MULK
JENIS DAN FUNGSI HURUF WAWU DALAM SURAH AL-MULK
Penelitian ini bertujuan untuk mengkaji penggunaan huruf "wawu" dalam Surah al-Mulk. Dalam bahasa Arab, huruf "wawu" memiliki peran penting secara gramatikal dan stilistik, yang me...
An approach for unplanned dilution assessment in open stope with consideration of the stope shape irregularity
An approach for unplanned dilution assessment in open stope with consideration of the stope shape irregularity
Abstract This study aims to propose an assessment tool for unplanned dilution, considering the irregularity of the stope shapes due to the overbreak and underbreak of the...
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
DETERMINING A RESILIENT STOPE BOUNDARY FOR UNDERGROUND MASS MINING PROJECTS
Uncertainty-based stope boundary optimization is a complex part of underground mine planning, especially in mass mining projects and notably block caving. Besides, grade variation ...
P0883HEALTHY FEMALES EXCRETE MORE PHOSPHATE THAN MALES IN RESPONSE TO AN ORAL CHALLENGE
P0883HEALTHY FEMALES EXCRETE MORE PHOSPHATE THAN MALES IN RESPONSE TO AN ORAL CHALLENGE
Abstract Background and Aims There are disparities in the diagnosis, treatment and prognosis for cardiovascular disease (CVD) be...
Novel phosphate-based cements for clinical applications
Novel phosphate-based cements for clinical applications
This Thesis aims at the development of two novel families of inorganic phosphate cements with suitable characteristics for clinical applications in hard tissue regeneration or repl...
Different methods of longwall full mining partial filling and optimal design of filling process
Different methods of longwall full mining partial filling and optimal design of filling process
Abstract Different methods of longwall full mining partial filling have been extensively studied to meet the special mining requirements of pressure coal resources ...
P0894OBESITY IMPAIRS THE ACUTE RESPONSE TO AN ORAL PHOSPHATE CHALLENGE
P0894OBESITY IMPAIRS THE ACUTE RESPONSE TO AN ORAL PHOSPHATE CHALLENGE
Abstract Background and Aims T Obesity is an increasing health problem world-wide. People who are overweight or obese are at gre...
Glutathione induces ArabidopsisPHT1;5gene via WRKY75 transcription factor to regulate phosphate homeostasis
Glutathione induces ArabidopsisPHT1;5gene via WRKY75 transcription factor to regulate phosphate homeostasis
AbstractPhosphorus is a macronutrient that regulates a wide range of physiological processes, including plant growth and development. The scarcity of bioavailable phosphate is ofte...

Back to Top