The Global Academy in west London, UK, was the country’s first university technical college to be built using offsite modular construction techniques. Advanced offsite modular technology integrated with traditional site-based building solutions enabled the project to meet a challenging programme on a constrained plot. The college was built in just 12 months, providing a new state-of-the-art educational facility for 800 14–19-year-old broadcast and digital media students. It has a structural design life of 60 years and high levels of acoustic performance and energy efficiency. This paper reviews the methods used to design, engineer and build the college and the key role played by offsite modular construction.
Title: Global Academy, London: how offsite modular construction is reshaping education
Description:
The Global Academy in west London, UK, was the country’s first university technical college to be built using offsite modular construction techniques.
Advanced offsite modular technology integrated with traditional site-based building solutions enabled the project to meet a challenging programme on a constrained plot.
The college was built in just 12 months, providing a new state-of-the-art educational facility for 800 14–19-year-old broadcast and digital media students.
It has a structural design life of 60 years and high levels of acoustic performance and energy efficiency.
This paper reviews the methods used to design, engineer and build the college and the key role played by offsite modular construction.
Related Results
Financial Modeling for Modular and Offsite Construction
Financial Modeling for Modular and Offsite Construction
The advantages of using modular and offsite construction compared with the traditional construction methods are numerous due to its efficiency in delivering shorter schedules, lowe...
Data Analytics of Production Cycle Time for Offsite Construction Projects
Data Analytics of Production Cycle Time for Offsite Construction Projects
Offsite construction has been widely used in the construction industry. The process improves productivity that leads to shortened project schedule and lower budget. Over the decade...
The role of onsite Implanon insertion training for HEWs for sustainable FP programs in Ethiopia: a mixed-method study
The role of onsite Implanon insertion training for HEWs for sustainable FP programs in Ethiopia: a mixed-method study
Abstract
Background
Training health extension workers on Implanon insertion offsite, or away from the workplace, can be c...
Effectiveness of Onsite Implanon Insertion Training of Health Extension Workers in Ethiopia: A Mixed-method Study by USAID Transform: Primary Health Care
Effectiveness of Onsite Implanon Insertion Training of Health Extension Workers in Ethiopia: A Mixed-method Study by USAID Transform: Primary Health Care
Abstract
Background: Training health extension workers on Implanon insertion offsite, or away from the workplace, can be cost-intensive, can depend on the human and financi...
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia
The Absence of Smart Technology as One of The Key Factors of Transportation in Modular Construction: A Case Study in Malaysia
Modular construction is a new method introduced to meet the modernisation agenda in the Malaysian construction industry. It provides various benefits to the construction industry, ...
Modular Construction: A Comprehensive Review
Modular Construction: A Comprehensive Review
Modular construction has the potential to transform the construction industry, as most (80–95%) of the modules, which are considered prefabricated buildings, are manufactured off-s...
The development of a lean six sigma and BIM framework for enhancing off-site manufacturing
The development of a lean six sigma and BIM framework for enhancing off-site manufacturing
Purpose
This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to...
Fast simulation : assisted shape correction after machining
Fast simulation : assisted shape correction after machining
Computer simulation is acknowledged as the third branch of Science. From the seminal work of Turner et al. (1956) [on Finite Elements, impressive improvements have been made in ter...