Javascript must be enabled to continue!
An integrated model for process parameter adjustment to recover throughput shortage in semiconductor assembly: A case study
View through CrossRef
Purpose: Existing productivity improvements activities such as inventory buffer, overall equipment effectiveness (OEE) and total productive maintenance (TPM) do not analytically associate the throughput shortage with process parameters. The paper aims to develop and test an integrated model to recover the throughput shortage through process parameters adjustment in a semiconductor assembly.Design/methodology/approach: The mathematical model of planned throughput is developed as a function of input parameters in an integrated multiple process line. When the planned throughput does not meet the real-time throughput, the throughput shortage occurs. The planned throughput for the next day is summed with the throughput shortage from previous day and mathematical programming is used to find the optimum process parameter values. Findings: The throughput shortage is restored using mathematical programming for the subsequent day of planning. If there still exist throughput shortage, the additional throughput shortage will be carried forward for the subsequent day of planning where mathematical programming is used again to find the adjusted process parameters. The proposed optimization model in essentially a parametric model using input parameters of real-time data based on a normal distribution that is translated into a range of minimum and maximum using 95% confidence interval.Research limitations/implications: The adjusted input parameters in this model is based on the cycle time of three processes which are Die Attach, Wire Bond and Pre-Cap Inspection. Downtime and setup time are not subjected to adjustments.Practical implications: The mathematical programming computes optimum process parameters values to restore the throughput shortage where it correlates the process parameters and throughput shortage quantitatively rather than conventional method of throughput shortage recovery.Originality/value: The research addresses the process parameter adjustment to recover the throughput shortage in integrated multiple processes.
Title: An integrated model for process parameter adjustment to recover throughput shortage in semiconductor assembly: A case study
Description:
Purpose: Existing productivity improvements activities such as inventory buffer, overall equipment effectiveness (OEE) and total productive maintenance (TPM) do not analytically associate the throughput shortage with process parameters.
The paper aims to develop and test an integrated model to recover the throughput shortage through process parameters adjustment in a semiconductor assembly.
Design/methodology/approach: The mathematical model of planned throughput is developed as a function of input parameters in an integrated multiple process line.
When the planned throughput does not meet the real-time throughput, the throughput shortage occurs.
The planned throughput for the next day is summed with the throughput shortage from previous day and mathematical programming is used to find the optimum process parameter values.
Findings: The throughput shortage is restored using mathematical programming for the subsequent day of planning.
If there still exist throughput shortage, the additional throughput shortage will be carried forward for the subsequent day of planning where mathematical programming is used again to find the adjusted process parameters.
The proposed optimization model in essentially a parametric model using input parameters of real-time data based on a normal distribution that is translated into a range of minimum and maximum using 95% confidence interval.
Research limitations/implications: The adjusted input parameters in this model is based on the cycle time of three processes which are Die Attach, Wire Bond and Pre-Cap Inspection.
Downtime and setup time are not subjected to adjustments.
Practical implications: The mathematical programming computes optimum process parameters values to restore the throughput shortage where it correlates the process parameters and throughput shortage quantitatively rather than conventional method of throughput shortage recovery.
Originality/value: The research addresses the process parameter adjustment to recover the throughput shortage in integrated multiple processes.
Related Results
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Stochasticity,complexity and synchronization in semiconductor lasers
Stochasticity,complexity and synchronization in semiconductor lasers
The purpose of this Thesis is study the dynamical behavior of semiconductor
lasers with optical feedback, as well as analyze the synchronization of this kind of
systems under dif...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Combination of Synchronised Assembly Precedence Matrices
Combination of Synchronised Assembly Precedence Matrices
Abstract
The planning of assembly lines has always been a complex task, as a large number of factors that influence and disrupt production must be taken into account. Uncer...
Development and Applications of the SCARA Robot
Development and Applications of the SCARA Robot
In the 1980s, when the author worked for Seiko Epson Corporation as a wristwatch production engineer, consumer needs had become so diversified that wristwatches had to be assembled...
Pengembangan Parameter Penilaian Keamanan Pelayanan Kesehatan Tradisional Empiris
Pengembangan Parameter Penilaian Keamanan Pelayanan Kesehatan Tradisional Empiris
Abstract
In the context of protecting the community against the security of traditional empirical health services, more detailed safety assessment parameters have been dev...
Hubungan College Adjustment dengan Stres Akademik Mahasiswa Tahun Pertama Fakultas Kedokteran
Hubungan College Adjustment dengan Stres Akademik Mahasiswa Tahun Pertama Fakultas Kedokteran
Abstract. First-year students experience a transitional period in adapting to complex learning systems and academic and social demands in higher education. This study aims to exami...
Chest Wall Hydatid Cysts: A Systematic Review
Chest Wall Hydatid Cysts: A Systematic Review
Abstract
Introduction
Given the rarity of chest wall hydatid disease, information on this condition is primarily drawn from case reports. Hence, this study systematically reviews t...

