The study was aimed at evaluating the performance of Nigeria’s Electric Power System before and during Privatization using Akure 33kV distribution Network as a case study. This is done to ascertain the effectiveness of the Privatization programme that occurred in the Electric Power Sector in Nigeria. The amount of energy served, the peak load supplied and load flow data of the Network for periods of 2010 to 2015 were collated from the daily log entry recording sheets of the 132/33kV transmission substation office in Akure. The percentage transformer loading and power transferred across the line were determined through load flow studies. The cost of energy not served due to faults was evaluated at a rate of NGN 24.30k per Kilo-Watt Hour (KWHr). The analysis was for a period of pre-privatization (2010-2012) and post-privatization (2013-2015). The results from the study indicate that the energy served decreased by 9% from 2010 to 2015 while the cost of energy not supplied increased largely after the Privatization. A decreasing rate in peak load supplied and transformer loadings were also observed during the Privatization. These results show that less customers might have been served or customers being served by this utility system experienced power outages more frequently in the post-privatization period than in the pre-privatization era.
Orion Scholar Journals Publication
Title: Evaluation of Pre and Post-privatization of Nigeria’s electric power system
Description:
The study was aimed at evaluating the performance of Nigeria’s Electric Power System before and during Privatization using Akure 33kV distribution Network as a case study.
This is done to ascertain the effectiveness of the Privatization programme that occurred in the Electric Power Sector in Nigeria.
The amount of energy served, the peak load supplied and load flow data of the Network for periods of 2010 to 2015 were collated from the daily log entry recording sheets of the 132/33kV transmission substation office in Akure.
The percentage transformer loading and power transferred across the line were determined through load flow studies.
The cost of energy not served due to faults was evaluated at a rate of NGN 24.
30k per Kilo-Watt Hour (KWHr).
The analysis was for a period of pre-privatization (2010-2012) and post-privatization (2013-2015).
The results from the study indicate that the energy served decreased by 9% from 2010 to 2015 while the cost of energy not supplied increased largely after the Privatization.
A decreasing rate in peak load supplied and transformer loadings were also observed during the Privatization.
These results show that less customers might have been served or customers being served by this utility system experienced power outages more frequently in the post-privatization period than in the pre-privatization era.
Related Results
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
Privatization
Privatization
Privatization is a process through which the private sector increasingly participates in economic activities that used to be the remit of the state. Privatization processes can occ...
Non-Recommended Publishing Lists: Strategies for Detecting Deceitful Journals
Non-Recommended Publishing Lists: Strategies for Detecting Deceitful Journals
Abstract
The rapid growth of open access publishing (OAP) has significantly improved the accessibility and dissemination of scientific knowledge. However, this expansion has also c...
EPD Electronic Pathogen Detection v1
EPD Electronic Pathogen Detection v1
Electronic pathogen detection (EPD) is a non - invasive, rapid, affordable, point- of- care test, for Covid 19 resulting from infection with SARS-CoV-2 virus. EPD scanning techno...
Transnational Tobacco Company Influence on Tax Policy During Privatization of a State Monopoly: British American Tobacco and Uzbekistan
Transnational Tobacco Company Influence on Tax Policy During Privatization of a State Monopoly: British American Tobacco and Uzbekistan
Objectives. The International Monetary Fund encourages privatization of state-owned tobacco industries. Privatization tends to lower cigarette prices, which encourages consumption....
SUNTRACKER
SUNTRACKER
A SUNTRACKER (illustrated in figure1), is a Concentrating Solar Power (CSP) unit, in the category of solar dish engines. The novel solar dish engine module (shown in figure 2) is d...
Field-emission current densities of carbon nanotube under the different electric fields
Field-emission current densities of carbon nanotube under the different electric fields
The field emission current variation law of carbon nanotube in a large electric field range (0-32 V m-1) is analyzed in depth by combining the density functional theory with metal ...
The Challenges of Privatization
The Challenges of Privatization
AbstractThis book provides a systematic account of the privatization process at the global scale, presenting an overarching description of the phenomenon, and panel data empirical ...