Javascript must be enabled to continue!
Assessment and Mitigation Studies of Voltage Sags during Sympathetic Inrush Current
View through CrossRef
The system voltage may be negatively impacted by the transformer’s energisation which draws a large value of magnetising inrush current for a few seconds. During the transformer’s energisation process, it experiences an unexpected saturation. When the transformer is saturated, the growth of magnetising inrush current, sympathetic inrush current and voltage sags are a few issues that are appear. Numerous variables that affect the inrush current and the resulting voltage sags were taken into consideration. This is due to the fact that the energisation of a large power transformer may result in a high voltage sag which relies on a value of parameters, including the duration of the circuit breaker closing time. One of the most essential objectives for power quality is the research of voltage sags that appear in a network. The goal of this project is to investigate sympathetic and inrush currents as well as to assess the voltage sag that occurs during transformer energisation and how severe it is. In this paper, the voltage sags are analysed by modelling 100kVA, 11kV/415V of wye-delta of single line (circles) transformer and using PSCAD software. It is expected to observe the magnitude, the duration and the percentage of voltage sags in order to make a comparison result between single connected transformer, two parallel-connected transformers and three parallel-connected transformers. To predict the severity of the sympathetic inrush current, the effects of voltage sags and their assessment is developed. As a result, it has been shown that the more energisation of the transformers, the peak of inrush current increases causing the higher magnitude and the longer duration of voltage sags. In conclusion, the voltage sags also become severe and persists for a longer duration when the number of transformers in operation are increased.
Title: Assessment and Mitigation Studies of Voltage Sags during Sympathetic Inrush Current
Description:
The system voltage may be negatively impacted by the transformer’s energisation which draws a large value of magnetising inrush current for a few seconds.
During the transformer’s energisation process, it experiences an unexpected saturation.
When the transformer is saturated, the growth of magnetising inrush current, sympathetic inrush current and voltage sags are a few issues that are appear.
Numerous variables that affect the inrush current and the resulting voltage sags were taken into consideration.
This is due to the fact that the energisation of a large power transformer may result in a high voltage sag which relies on a value of parameters, including the duration of the circuit breaker closing time.
One of the most essential objectives for power quality is the research of voltage sags that appear in a network.
The goal of this project is to investigate sympathetic and inrush currents as well as to assess the voltage sag that occurs during transformer energisation and how severe it is.
In this paper, the voltage sags are analysed by modelling 100kVA, 11kV/415V of wye-delta of single line (circles) transformer and using PSCAD software.
It is expected to observe the magnitude, the duration and the percentage of voltage sags in order to make a comparison result between single connected transformer, two parallel-connected transformers and three parallel-connected transformers.
To predict the severity of the sympathetic inrush current, the effects of voltage sags and their assessment is developed.
As a result, it has been shown that the more energisation of the transformers, the peak of inrush current increases causing the higher magnitude and the longer duration of voltage sags.
In conclusion, the voltage sags also become severe and persists for a longer duration when the number of transformers in operation are increased.
Related Results
Assessing the Financial Impact and Mitigation Methods for Voltage Sag in Power Grid
Assessing the Financial Impact and Mitigation Methods for Voltage Sag in Power Grid
Voltage sags, as defined by the IEEE Standard, refer to sudden drops in voltage magnitude that last for a duration greater than 0.5 cycles of the power frequency but less than or e...
EPD Electronic Pathogen Detection v1
EPD Electronic Pathogen Detection v1
Electronic pathogen detection (EPD) is a non - invasive, rapid, affordable, point- of- care test, for Covid 19 resulting from infection with SARS-CoV-2 virus. EPD scanning techno...
Improvement of operation of power transformer protection system during sympathetic inrush current phenomena using fault current limiter
Improvement of operation of power transformer protection system during sympathetic inrush current phenomena using fault current limiter
Power transformer protection has a high sensitivity due to its important role in power systems. Various factors such as inrush and sympathetic inrush currents may result in the ina...
Modelado de un Recuperador Dinámico de Tensión para el Mejoramiento de la Calidad de la Onda de Tensión
Modelado de un Recuperador Dinámico de Tensión para el Mejoramiento de la Calidad de la Onda de Tensión
[1] R. C. Dugan, H. W. Beaty, y S. Santoso, Electrical Power Systems Quality, Third edition. Tata McGraw Hill Education, 2012.[2] J. Arrilaga y N. R. Watson, Powe...
Evaluation of Different Methods for Voltage Sag Source Detection
Evaluation of Different Methods for Voltage Sag Source Detection
This paper compares and evaluates three different methods for voltage sag source detection. First method (method I) is based on the assumption, that the energy flow at the monitori...
Methodology for Determination of the Number of Equipment Malfunctions Due to Voltage Sags
Methodology for Determination of the Number of Equipment Malfunctions Due to Voltage Sags
This article deals with the assessment of the reliability of sensitive equipment due to voltage sags. The most frequent problems of power quality are voltage sags. Equipment that c...
A Water‐Rock Coupled Model for Fault Water Inrush: A Case Study in Xiaochang Coal Mine, China
A Water‐Rock Coupled Model for Fault Water Inrush: A Case Study in Xiaochang Coal Mine, China
Water inrush disasters in mining frequently occur under the influence of confined water‐bearing fault zones. Therefore, investigating the fault water inrush mechanism is necessary ...
Evaluation of elevated heart rate as a sympathetic nervous system biomarker in essential hypertension
Evaluation of elevated heart rate as a sympathetic nervous system biomarker in essential hypertension
Background:
There is a need for an easily accessible biomarker of sympathetic nervous activation in essential hypertension, but none exists. Heart rate (HR) has been su...

