Studi Pengaruh Geometri Peledakan terhadap Biaya Pemboran dan Biaya Peledakan pada PT Unggul Dinamika Utama Kabupaten Kutai Timur Provinsi Kalimantan Timur
View through CrossRef
This study aims to analyze the effect of blasting geometry on drilling and blasting costs in mining operations at PT Unggul Dinamika Utama, Kutai Timur Regency, East Kalimantan Province. The research focuses on comparing two operational areas, namely PIT Tempudo 6 and PIT East, which apply different blasting geometries: a burden of 7 m and spacing of 8 m at PIT Tempudo 6, and a burden of 8 m and spacing of 9 m at PIT East. The research method involved collecting primary data from actual field drilling and blasting activities, as well as secondary data from the company. The parameters analyzed included blasting geometry, explosive consumption, and operational costs of drilling and blasting. The results show that the total drilling cost at PIT Tempudo 6 was Rp. 215,689,696, while at PIT East it was Rp. 162,177,899. The total blasting cost at PIT Tempudo 6 reached Rp. 3,023,066,977.60, while at PIT East it was Rp. 1,780,839,602.80. Thus, the total operational cost of blasting activities at PIT Tempudo 6 amounted to Rp. 3,238,756,673.60, and at PIT East amounted to Rp. 1,943,017,501.80. It can be concluded that differences in blasting geometry significantly affect operational cost efficiency. Larger burden and spacing values lead to more efficient costs by reducing the number of drill holes and explosive consumption per blasted rock volume.
Asosiasi Riset Ilmu Manajemen dan Bisnis Indonesia
Title: Studi Pengaruh Geometri Peledakan terhadap Biaya Pemboran dan Biaya Peledakan pada PT Unggul Dinamika Utama Kabupaten Kutai Timur Provinsi Kalimantan Timur
Description:
This study aims to analyze the effect of blasting geometry on drilling and blasting costs in mining operations at PT Unggul Dinamika Utama, Kutai Timur Regency, East Kalimantan Province.
The research focuses on comparing two operational areas, namely PIT Tempudo 6 and PIT East, which apply different blasting geometries: a burden of 7 m and spacing of 8 m at PIT Tempudo 6, and a burden of 8 m and spacing of 9 m at PIT East.
The research method involved collecting primary data from actual field drilling and blasting activities, as well as secondary data from the company.
The parameters analyzed included blasting geometry, explosive consumption, and operational costs of drilling and blasting.
The results show that the total drilling cost at PIT Tempudo 6 was Rp.
215,689,696, while at PIT East it was Rp.
162,177,899.
The total blasting cost at PIT Tempudo 6 reached Rp.
3,023,066,977.
60, while at PIT East it was Rp.
1,780,839,602.
80.
Thus, the total operational cost of blasting activities at PIT Tempudo 6 amounted to Rp.
3,238,756,673.
60, and at PIT East amounted to Rp.
1,943,017,501.
80.
It can be concluded that differences in blasting geometry significantly affect operational cost efficiency.
Larger burden and spacing values lead to more efficient costs by reducing the number of drill holes and explosive consumption per blasted rock volume.
Related Results
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
EVALUASI PEMBORAN PENYEDIAAN LUBANG LEDAK DI PIT WARUTE PT BUKIT INTAN INDOPERKASA
EVALUASI PEMBORAN PENYEDIAAN LUBANG LEDAK DI PIT WARUTE PT BUKIT INTAN INDOPERKASA
Kegiatan pembongkaran overburden menggunakan metode peledakan. Sebelum operasi peledakan dilakukan kegiatan pemboran untuk penyediaan lubang ledak dengan geometri dan pola pemboran...
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
PERAN TATA KELOLA PERUSAHAAN DALAM MEMODERASI PENGARUH IMPLEMANTASI GREEN ACCOUNTING, CORPORATE SOCIAL RESPONSIBILITY DAN FIRM SIZE TERHADAP KINERJA KEUANGAN
This study examines the role of corporate governance in moderating the influence of green accounting disclosure, corporate social responsibility (CSR), and firm size on the financi...
Analisis Geometri Peledakan terhadap Fragmentasi Batu Gamping di Quarry D Blok 2 Pt Indocement Tunggal Prakarsa, Tbk. Kecamatan Gunung Putri, Kabupaten Bogor Provinsi Jawa Barat
Analisis Geometri Peledakan terhadap Fragmentasi Batu Gamping di Quarry D Blok 2 Pt Indocement Tunggal Prakarsa, Tbk. Kecamatan Gunung Putri, Kabupaten Bogor Provinsi Jawa Barat
Abstract. PT Indocement Tunggal Prakarsa Tbk is a company engaged in limestone and claystone mining using a quarry mining system. In its blasting activities, the company sets a fra...
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review
FAKTOR-FAKTOR YANG MEMPENGARUHI MORTALITAS PADA PASIEN DENGAN FRAKTUR COSTA: Literature Review Anna Tri Wahyuni1), Masfuri2), Liya Arista3)1,2,3 Fakultas Ilmu Keperawatan Univers...
OPTIMASI BIAYA PELEDAKAN PADA PEMBONGKARAN LIMESTONE DI QUARRY BATUGAMPING
OPTIMASI BIAYA PELEDAKAN PADA PEMBONGKARAN LIMESTONE DI QUARRY BATUGAMPING
Kegiatan penambangan menggunakan, metode quarry dan proses pembongkaran material limestone menggunakan metode peledakan, agar memenuhi target produksi dan memperlancar proses pemua...
Studi Penentuan Getaran Peledakan Menggunakan Maximum Instantaneous Charge Per Delay di PT Lotus Sg Lestari
Studi Penentuan Getaran Peledakan Menggunakan Maximum Instantaneous Charge Per Delay di PT Lotus Sg Lestari
Penentuan PPV prediksi dalam kegiatan peledakan menggunakan jumlah bahan peledak maksimum per peledakan yang menyebabkan jumlah data prediksi PPV yang dihasilkan tidak cukup untuk ...