Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Embracing Opportunities and Avoiding Pitfalls of Probabilistic Modelling in Field Development Planning

View through CrossRef
Abstract Uncertainty and risk analysis is an inseparable part of any decision making process in the field development planning. This study sheds light on the available approaches to capture the range of uncertainties but digs deep into the misuses of the probabilistic approach that renders the method difficult and time consuming to implement with little added value for risk mitigation and proper decision making. Probabilistic modeling using dynamic simulation models has been adopted in recent decades to address the variations in forecasted production profiles and to capture the uncertainties. However, there are misuses in the approach that pose questions on the outcome and its meaningfulness. Lack of enough spread in the forecast, history-matched models with physically incorrect parameter ranges/ combinations and models suggesting contradicting development scenarios are among examples. These in turn make the probabilistic forecasting output inconclusive and considering the high computational cost and time required to perform the exercise makes it unattractive to management. In this paper four case studies including mature and green fields have been described and a number of main issues and pitfalls of using probabilistic dynamic modeling in those cases are analyzed. General workflows are then presented for green and brown fields based on experimental design, proxy modeling, optimization and prediction candidates selection that provides solution for proper selection and implementation of the probabilistic dynamic modeling. It is argued that probabilistic modeling can help better capture the uncertainties and reduce the risk in field development planning provided that a fit-for-purpose approach is taken with correct understanding of the data requirement according to the reservoir complexity, the physical processes being modeled and assumptions used in the methodologies and simulation engines. This is in contrast to the attempts to capture the ranges of recoverables based on deterministic high and low cases that is often inefficient as the optimistic high-case of ‘hole-in-one’, may suggest an ideal but not plausible scenario whereas the pessimistic low-case of ‘train-wreck’ may be economically unattractive. The exercise then leaves the companies with the best technical estimate model to make the final call and the numbers from other models are only used for reserve booking purposes. The published papers in the literature include discussions on deterministic vs. probabilistic approaches and selection of base case models, the detailed algorithms and also case studies done using the published methods available in the commercial softwares. This paper however discusses the misuses of the probabilistic dynamic modelling approach and tries to inform the audience of the pitfalls of not understanding the reservoir and/or the tools used in implementing the methods and in this sense it is novel.
Title: Embracing Opportunities and Avoiding Pitfalls of Probabilistic Modelling in Field Development Planning
Description:
Abstract Uncertainty and risk analysis is an inseparable part of any decision making process in the field development planning.
This study sheds light on the available approaches to capture the range of uncertainties but digs deep into the misuses of the probabilistic approach that renders the method difficult and time consuming to implement with little added value for risk mitigation and proper decision making.
Probabilistic modeling using dynamic simulation models has been adopted in recent decades to address the variations in forecasted production profiles and to capture the uncertainties.
However, there are misuses in the approach that pose questions on the outcome and its meaningfulness.
Lack of enough spread in the forecast, history-matched models with physically incorrect parameter ranges/ combinations and models suggesting contradicting development scenarios are among examples.
These in turn make the probabilistic forecasting output inconclusive and considering the high computational cost and time required to perform the exercise makes it unattractive to management.
In this paper four case studies including mature and green fields have been described and a number of main issues and pitfalls of using probabilistic dynamic modeling in those cases are analyzed.
General workflows are then presented for green and brown fields based on experimental design, proxy modeling, optimization and prediction candidates selection that provides solution for proper selection and implementation of the probabilistic dynamic modeling.
It is argued that probabilistic modeling can help better capture the uncertainties and reduce the risk in field development planning provided that a fit-for-purpose approach is taken with correct understanding of the data requirement according to the reservoir complexity, the physical processes being modeled and assumptions used in the methodologies and simulation engines.
This is in contrast to the attempts to capture the ranges of recoverables based on deterministic high and low cases that is often inefficient as the optimistic high-case of ‘hole-in-one’, may suggest an ideal but not plausible scenario whereas the pessimistic low-case of ‘train-wreck’ may be economically unattractive.
The exercise then leaves the companies with the best technical estimate model to make the final call and the numbers from other models are only used for reserve booking purposes.
The published papers in the literature include discussions on deterministic vs.
probabilistic approaches and selection of base case models, the detailed algorithms and also case studies done using the published methods available in the commercial softwares.
This paper however discusses the misuses of the probabilistic dynamic modelling approach and tries to inform the audience of the pitfalls of not understanding the reservoir and/or the tools used in implementing the methods and in this sense it is novel.

Related Results

Inventory and pricing management in probabilistic selling
Inventory and pricing management in probabilistic selling
Context: Probabilistic selling is the strategy that the seller creates an additional probabilistic product using existing products. The exact information is unknown to customers u...
Diagnostic pitfalls in [68Ga]Ga-DOTATATE PET/CT imaging: a systematic review
Diagnostic pitfalls in [68Ga]Ga-DOTATATE PET/CT imaging: a systematic review
[68Ga]Ga-DOTA-Tyr3-octreotate ([68Ga]Ga-DOTATATE) is an established somatostatin receptor imaging agent that has demonstrated superior efficacy in visualizing neuroendocrine tumors...
Advanced Financial Modelling and Analysis
Advanced Financial Modelling and Analysis
Abstract: This chapter, "Advanced Financial Modelling and Analysis," provides an in-depth exploration of the principles, techniques, and applications of financial modelling in the ...
High-quality probabilistic predictions for existing hydrological models with common objective functions    
High-quality probabilistic predictions for existing hydrological models with common objective functions    
<p>Probabilistic predictions describe the uncertainty in modelled streamflow, which is a critical input for many environmental modelling applications.  A...
Adaptive Planning for Resilient Coastal Waterfronts
Adaptive Planning for Resilient Coastal Waterfronts
Many delta and coastal cities worldwide face increasing flood risk due to changing climate conditions and sea level rise. The question is how to develop measures and strategies for...
Optimisation in Neurosymbolic Learning Systems
Optimisation in Neurosymbolic Learning Systems
In the last few years, Artificial Intelligence (AI) has reached the public consciousness through high-profile applications such as chatbots, image generators, speech synthesis and ...
Probabilistic SWE reanalysis as a generalization of deterministic SWE reconstruction techniques
Probabilistic SWE reanalysis as a generalization of deterministic SWE reconstruction techniques
AbstractSnow accumulation and melt is highly variable in space and time in complex mountainous environments. Therefore, it is necessary to provide high‐resolution spatially and tem...
Predictors of unmet need for family planning in Ethiopia 2019: a systematic review and meta analysis
Predictors of unmet need for family planning in Ethiopia 2019: a systematic review and meta analysis
AbstractBackgroundunmet need for family planning is a common cause of uninteded pregnancy which mostly end up with abortion. Many studies were conducted on predictors of unmet need...

Back to Top