Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Mechanical Properties of Sheet Pile Cofferdam during Adjacent Open Cut Tunnel Construction near Lake Bottom

View through CrossRef
In water-related projects, the application of steel sheet pile cofferdams is becoming more and more widespread, and the influence of tunnel construction on the mechanical properties of adjacent cofferdams is important. In this study, the object of research was the mechanical properties of large-span steel sheet pile cofferdams. The open-cut tunnel project was located in Suzhou Yinshan Lake, China. According to the actual construction steps of the tunnel foundation pit, assuming that the soil was a small strain hardening soil model, combined with on-site monitoring data, a three-dimensional elastoplastic finite difference model was established. The results show that during tunnel construction, the maximum settlement of the cofferdam appeared at 0.27~0.53 m on the side of the foundation pit; the maximum horizontal displacement of the steel sheet pile occurred at the pile bottom of foundation pit side, and the seepage gradually increased during construction, eventually resulting in water gushing at the bottom of the foundation pit. After the completion of tunnel construction, the settlement value of the cofferdam presented a pattern that first increased and then decreased from the side of the foundation pit to the side of the adjacent lakeside; the steel cofferdam tilted toward the side of the foundation pit, with a maximum inclination angle of 3.37°. It should be pointed out that as the construction progressed, the axial force of the tie rods in the steel cofferdam changed from a U-shaped distribution to a V-shaped distribution. This study could provide a reference for the impact of tunnel foundation pit construction on adjacent steel cofferdam and could also provide a reference for the safety research of open-cut tunnel construction.
Title: Mechanical Properties of Sheet Pile Cofferdam during Adjacent Open Cut Tunnel Construction near Lake Bottom
Description:
In water-related projects, the application of steel sheet pile cofferdams is becoming more and more widespread, and the influence of tunnel construction on the mechanical properties of adjacent cofferdams is important.
In this study, the object of research was the mechanical properties of large-span steel sheet pile cofferdams.
The open-cut tunnel project was located in Suzhou Yinshan Lake, China.
According to the actual construction steps of the tunnel foundation pit, assuming that the soil was a small strain hardening soil model, combined with on-site monitoring data, a three-dimensional elastoplastic finite difference model was established.
The results show that during tunnel construction, the maximum settlement of the cofferdam appeared at 0.
27~0.
53 m on the side of the foundation pit; the maximum horizontal displacement of the steel sheet pile occurred at the pile bottom of foundation pit side, and the seepage gradually increased during construction, eventually resulting in water gushing at the bottom of the foundation pit.
After the completion of tunnel construction, the settlement value of the cofferdam presented a pattern that first increased and then decreased from the side of the foundation pit to the side of the adjacent lakeside; the steel cofferdam tilted toward the side of the foundation pit, with a maximum inclination angle of 3.
37°.
It should be pointed out that as the construction progressed, the axial force of the tie rods in the steel cofferdam changed from a U-shaped distribution to a V-shaped distribution.
This study could provide a reference for the impact of tunnel foundation pit construction on adjacent steel cofferdam and could also provide a reference for the safety research of open-cut tunnel construction.

Related Results

Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
ABSTRACT Present methods of pile group analysis are either limited to special geometric cases or do not consider pile-soil-pile interaction. An analytical procedu...
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
In order to investigate the influence of different diameters on pile end resistance, pile side resistance, pile axial force and pile force transmission law of jacked pile penetrati...
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
ABSTRACT This paper analyzes some aspects of anchor-pile design for marine environments, using a finite-element mathematical model of the pile, soil, and the pile...
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
Abstract During the past year, a new mechanical pile connector has been introduced to the offshore construction industry. This connector has been the culmination ...
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
ABSTRACTThe spiral heat exchanger of the energy pile groups is divided into multiple segments. Each heat exchanger segment is regarded as a three‐dimensional spiral heat source of ...
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
With the rapid development of urbanization and infrastructure construction, the requirements for the foundation design of high-rise buildings and large bridges are increasing. Pile...
Pile Driving Measurements On The Heather Platform Installation
Pile Driving Measurements On The Heather Platform Installation
Abstract The first leg piles of the Heather Platform were instrumented using strain transducers and accelerometers that were attached to the pile just below its t...
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...