Kajian Rencana Teknis dan Rencana Biaya Reklamasi Penambangan Batuan Andesit di PT Radian Delta Wijaya Desa Sadu, Kecamatan Soreang, Kabupaten Bandung, Provinsi Jawa Barat
View through CrossRef
Abstract. The existence and availability of mineral resources in West Java is quite large, one of which is andesite rock in Bandung Regency. Andesite rock has a role in the physical development process, but by paying attention to environmental aspects in carrying out its exploitation, every mining company is required to have Good Mining Practice rules in carrying out mining operations. This research was conducted with the aim of repairing or managing disturbed land as a result of the mining business activities carried out, as well as providing added value to the ex-mining area which can become an object of utility for the surrounding community and the wider community in general. Providing added value includes aspects of appropriate environmental empowerment, economic empowerment resulting from the reclamation activity itself. This study discusses the study of reclamation plans, land surface arrangement, revegetation, reclamation and post-mining costs. Based on the results of the study, the reclamation area was 2,969 ha with the time needed for land management using mechanical tools if the total was 5 years, namely 349.3 days. The time for making the drainage system is 6 days. And the time required for revegetation for 5 years is 155 days. Meanwhile, the direct cost of the reclamation activity plan for the production operation period (2021–2025) is Rp. 1,073,794,391 where the percentage of reclamation planning costs is 8.7% - 10% and supervision costs are between 6.4% - 7%, so that the indirect costs are Rp. 195,240,447.
Abstrak. Keberadaan dan keterdapatan sumberdaya bahan tambang di Jawa Barat cukup besar salah satunya batuan andesit di Kabupaten Bandung. Batuan andesit memiliki peran dalam proses pembangunan secara fisik, namun dengan memperhatikan aspek lingkungan didalam melakukan eksploitasinya, yaitu setiap perusahaan tambang wajib memiliki kaidah Good Mining Practice dalam melakukan operasi pertambangan. Penelitian ini dilakukan bertujuan untuk memperbaiki atau menata lahan yang terganggu sebagai akibat kegiatan usaha pertambangan yang dilakukan, serta memberikan nilai tambah pada area bekas tambang yang dapat menjadi obyek daya guna bagi masyarakat sekitar serta masyarakat luas pada umumnya. Memberikan nilai tambah mencakup pada aspek pemberdayaan lingkungan yang tepat guna, pemberdayaan ekonomi yang dihasilkan dari kegiatan reklamasi itu sendiri. Penelitian ini membahas mengenai kajian rencana reklamasi, penataan permukaan lahan, revegetasi, biaya reklamasi dan pasca tambang. Berdasarkan hasil penelitian, didapat luasan area reklamasi 2.969 ha dengan waktu yang dibutuhkan untuk penataan lahan menggunakan alat-alat mekanis jika ditotal selamat 5 tahun yaitu 349,3 hari. Waktu pembuatan sistem drainase yaitu 6 hari. Dan waktu revegetasi yang dibutuhkan selama pengerjaan 5 tahun yaitu 155 hari. Sedangkan biaya langsung rencana kegiatan reklamasi periode operasi produksi (2021–2025) adalah sebesar Rp. 1.073.794.391 dimana persentase biaya perencanaan reklamasi 8,7 % – 10 % dan biaya supervisi antara 6,4 % – 7 %, sehingga didapat biaya tidak langsungnya sebesar Rp. 195.240.447.
Universitas Islam Bandung (Unisba)
Title: Kajian Rencana Teknis dan Rencana Biaya Reklamasi Penambangan Batuan Andesit di PT Radian Delta Wijaya Desa Sadu, Kecamatan Soreang, Kabupaten Bandung, Provinsi Jawa Barat
Description:
Abstract.
The existence and availability of mineral resources in West Java is quite large, one of which is andesite rock in Bandung Regency.
Andesite rock has a role in the physical development process, but by paying attention to environmental aspects in carrying out its exploitation, every mining company is required to have Good Mining Practice rules in carrying out mining operations.
This research was conducted with the aim of repairing or managing disturbed land as a result of the mining business activities carried out, as well as providing added value to the ex-mining area which can become an object of utility for the surrounding community and the wider community in general.
Providing added value includes aspects of appropriate environmental empowerment, economic empowerment resulting from the reclamation activity itself.
This study discusses the study of reclamation plans, land surface arrangement, revegetation, reclamation and post-mining costs.
Based on the results of the study, the reclamation area was 2,969 ha with the time needed for land management using mechanical tools if the total was 5 years, namely 349.
3 days.
The time for making the drainage system is 6 days.
And the time required for revegetation for 5 years is 155 days.
Meanwhile, the direct cost of the reclamation activity plan for the production operation period (2021–2025) is Rp.
1,073,794,391 where the percentage of reclamation planning costs is 8.
7% - 10% and supervision costs are between 6.
4% - 7%, so that the indirect costs are Rp.
195,240,447.
Abstrak.
Keberadaan dan keterdapatan sumberdaya bahan tambang di Jawa Barat cukup besar salah satunya batuan andesit di Kabupaten Bandung.
Batuan andesit memiliki peran dalam proses pembangunan secara fisik, namun dengan memperhatikan aspek lingkungan didalam melakukan eksploitasinya, yaitu setiap perusahaan tambang wajib memiliki kaidah Good Mining Practice dalam melakukan operasi pertambangan.
Penelitian ini dilakukan bertujuan untuk memperbaiki atau menata lahan yang terganggu sebagai akibat kegiatan usaha pertambangan yang dilakukan, serta memberikan nilai tambah pada area bekas tambang yang dapat menjadi obyek daya guna bagi masyarakat sekitar serta masyarakat luas pada umumnya.
Memberikan nilai tambah mencakup pada aspek pemberdayaan lingkungan yang tepat guna, pemberdayaan ekonomi yang dihasilkan dari kegiatan reklamasi itu sendiri.
Penelitian ini membahas mengenai kajian rencana reklamasi, penataan permukaan lahan, revegetasi, biaya reklamasi dan pasca tambang.
Berdasarkan hasil penelitian, didapat luasan area reklamasi 2.
969 ha dengan waktu yang dibutuhkan untuk penataan lahan menggunakan alat-alat mekanis jika ditotal selamat 5 tahun yaitu 349,3 hari.
Waktu pembuatan sistem drainase yaitu 6 hari.
Dan waktu revegetasi yang dibutuhkan selama pengerjaan 5 tahun yaitu 155 hari.
Sedangkan biaya langsung rencana kegiatan reklamasi periode operasi produksi (2021–2025) adalah sebesar Rp.
1.
073.
794.
391 dimana persentase biaya perencanaan reklamasi 8,7 % – 10 % dan biaya supervisi antara 6,4 % – 7 %, sehingga didapat biaya tidak langsungnya sebesar Rp.
195.
240.
447.
Related Results
Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Berdasarkan Kepmen ESDM No. 1827 K/30/MEM/2018 setiap pemegang IUP Operasi Produksi wajib menyampaikan dokumen rencana reklamasi dan jaminan reklamasi sebelum memulai kegiatan oper...
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Abstract. In addition to providing benefits, marine mining activities can have a negative impact on the marine environment, causing various changes to the marine environment. One o...
Rencana Teknis dan Ekonomis untuk Rencana Kegiatan Reklamasi Tambang Batubara di PT Banjarsari Pribumi Kecamatan Merapi Timur, Kabupaten Lahat, Provinsi Sumatera Selatan
Rencana Teknis dan Ekonomis untuk Rencana Kegiatan Reklamasi Tambang Batubara di PT Banjarsari Pribumi Kecamatan Merapi Timur, Kabupaten Lahat, Provinsi Sumatera Selatan
Abstract. PT Banjarsari Pribumi is a private mining company engaged in coal mining with an open mining system. The mining location is in East Merapi District, Lahat Regency, South ...
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Abstract. The andesite rocks in this study come from the PT. Sofa Nugraha mine located in Parung Panjang District, Bogor Regency, West Java Province. The purpose of this research i...
BIMBINGAN TEKNIS PEMBUATAN PERATURAN DESA DI DESA KAWUNGLARANG, KECAMATAN RANCAH, KABUPATEN CIAMIS
BIMBINGAN TEKNIS PEMBUATAN PERATURAN DESA DI DESA KAWUNGLARANG, KECAMATAN RANCAH, KABUPATEN CIAMIS
Peraturan Desa ditetapkan oleh Kepala Desa setelah dibahas dan disepakati bersama Badan Permusyawaratan Desa merupakan kerangka hukum dan kebijakan dalam penyelenggaraan Pemerintah...
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Abstract. Environmental impacts that can occur such as decreased soil productivity, soil compaction, the possibility of erosion, unstable soil movement, disruption of flora and fau...
Analisis Risiko Bencana Longsor dan Kerugiannya Kecamatan Cililin Kabupaten Bandung Barat
Analisis Risiko Bencana Longsor dan Kerugiannya Kecamatan Cililin Kabupaten Bandung Barat
Abstract. Disaster Management Agency in West Bandung Regency, 5 sub-districts in the southern region of West Bandung Regency have a fairly high vulnerability to landslides, one of ...
BIMBINGAN TEKNIS PEMBUATAN PERATURAN DESA DI DESA KALIMATI, KECAMATAN ADIWERNA, KABUPATEN TEGAL, JAWA TENGAH
BIMBINGAN TEKNIS PEMBUATAN PERATURAN DESA DI DESA KALIMATI, KECAMATAN ADIWERNA, KABUPATEN TEGAL, JAWA TENGAH
Peraturan Desa ditetapkan oleh Kepala Desa setelah dibahas dan disepakati bersama BadanPermusyawaratan Desa merupakan kerangka hukum dan kebijakan dalam penyelenggaraanPemerintahan...