First Successful Autonomous ICD Pilot for GOR Management Across ADNOC Offshore
View through CrossRef
Abstract
The paper discusses the pilot project in ADNOC Offshore to assess the Autonomous Inflow Control Device (AICD) technology as an effective solution for increasing oil production over the life of the field. High rate of water and gas production in horizontal wells is one of the key problems from the commencement of operation due to the high cost of produced water and gas treatment including several other factors. Early Gas breakthrough in wells can result in shut-in to conserve reservoir energy and to meet the set GOR guidelines. The pilot well was shut-in due to high GOR resulted from the gas breakthrough.
A pilot project was implemented to evaluate the ability of autonomous inflow control technology to manage gas break through early in the life of the well spanned across horizontal wellbore. And also to balance the production influx profile across the entire lateral length and to compensate for the permeability variation and therefore the productivity of each zone. Each compartment in the pilot well was equipped with AICD Screens and Swell-able Packers across horizontal open hole wellbore to evaluate oil production and defer gas breakthrough. Some AICDs were equipped with treatment valve for the compartments that needed acid simulation to enhance the effectiveness of the zone. The selection factors for installing number of production valves in the pilot well per each AICD was based on reservoir and field data. Pre-modeling of the horizontal wellbore section with AICD was performed using commercial simulation software (NETool).
After the first pilot was completed, a detailed technical analysis was conducted and based on the early production results from the pilot well showed that AICD completions effectively managed gas production by delaying the gas break through and restricting gas inflow from the reservoir with significant GOR reduction ±40% compared to baseline production performance data from the open hole without AICD thus increasing oil production. The pilot well performed positively to the AICD completion allowing to produce healthy oil and meeting the guidelines. The early production results are in line with NETool simulation modelling, thereby increasing assurance in the methods employed in designing the AICD completion for the well and candidate selection.
This paper discusses the successful AICD completion installation and production operation in pilot well in ADNOC Offshore to manage GOR and produced the well with healthy oil under the set guidelines. This will enable to re-activate wells shut-in due to GOR constraint to help meeting the sustainable field production target.
Title: First Successful Autonomous ICD Pilot for GOR Management Across ADNOC Offshore
Description:
Abstract
The paper discusses the pilot project in ADNOC Offshore to assess the Autonomous Inflow Control Device (AICD) technology as an effective solution for increasing oil production over the life of the field.
High rate of water and gas production in horizontal wells is one of the key problems from the commencement of operation due to the high cost of produced water and gas treatment including several other factors.
Early Gas breakthrough in wells can result in shut-in to conserve reservoir energy and to meet the set GOR guidelines.
The pilot well was shut-in due to high GOR resulted from the gas breakthrough.
A pilot project was implemented to evaluate the ability of autonomous inflow control technology to manage gas break through early in the life of the well spanned across horizontal wellbore.
And also to balance the production influx profile across the entire lateral length and to compensate for the permeability variation and therefore the productivity of each zone.
Each compartment in the pilot well was equipped with AICD Screens and Swell-able Packers across horizontal open hole wellbore to evaluate oil production and defer gas breakthrough.
Some AICDs were equipped with treatment valve for the compartments that needed acid simulation to enhance the effectiveness of the zone.
The selection factors for installing number of production valves in the pilot well per each AICD was based on reservoir and field data.
Pre-modeling of the horizontal wellbore section with AICD was performed using commercial simulation software (NETool).
After the first pilot was completed, a detailed technical analysis was conducted and based on the early production results from the pilot well showed that AICD completions effectively managed gas production by delaying the gas break through and restricting gas inflow from the reservoir with significant GOR reduction ±40% compared to baseline production performance data from the open hole without AICD thus increasing oil production.
The pilot well performed positively to the AICD completion allowing to produce healthy oil and meeting the guidelines.
The early production results are in line with NETool simulation modelling, thereby increasing assurance in the methods employed in designing the AICD completion for the well and candidate selection.
This paper discusses the successful AICD completion installation and production operation in pilot well in ADNOC Offshore to manage GOR and produced the well with healthy oil under the set guidelines.
This will enable to re-activate wells shut-in due to GOR constraint to help meeting the sustainable field production target.
Related Results
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 24 Sayı 1
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 24 Sayı 1
Değerli okuyucularımız, Cumhuriyet İlahiyat Dergisi’nin 24. Cilt 1. Sayısına hoşgeldi-niz. Bu sayımızla birlikte 23 yılı geride bırakmanın gururunu ve mutluluğunu yaşıyoruz.
Akade...
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 25 Sayı 2
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 25 Sayı 2
Cumhuriyet İlahiyat Dergisi’nin 25. cilt 2. sayısına hoşgeldiniz. Bu sayımızla birlikte 25 yılı geride bırakmanın gurur ve mutluluğunu yaşıyoruz.
Cumhuriyet İlahiyat Dergisi sahip...
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 23 Sayı 2
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 23 Sayı 2
Akademik yayın yolculuğunda 22 yılı geride bırakan Cumhuriyet İlahiyat Dergisi’nin 23. Cilt 2. Sayısına hoş geldiniz.
Akademi dünyasında değerli bilimsel çalışmalar yapmak kadar y...
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 23 Sayı 3 (Felsefe ve Din Bilimleri Özel Sayısı)
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 23 Sayı 3 (Felsefe ve Din Bilimleri Özel Sayısı)
Gayretimin bir kısmı bilim dünyasına hizmet, ama diğer çok mühim bir gayesi ise; koskoca bir İslam aleminin yitirmiş olduğu kendine hürmeti, güveni ve insanlık tarihindeki yerini h...
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 25 Sayı 1
Cumhuriyet İlahiyat Dergisi Yeni Sayı: Cilt 25 Sayı 1
Cumhuriyet İlahiyat Dergisi’nin 25. cilt 1. sayısına hoşgeldiniz. Bu sayımızla birlikte 25 yılı geride bırakmanın gurur ve mutluluğunu yaşıyoruz.
Cumhuriyet İlahiyat Dergisi sahip...
The Effect of Clinical Knee Measurement in Children with Genu Varus
The Effect of Clinical Knee Measurement in Children with Genu Varus
Abstract
Introduction
Children with genu varus needs frequent assessment and follow up that may need several radiographies. This study investigates the effectiveness of the clinica...
A Literature Review of Gustatory Over-Responsivity Among the Population with Autism Spectrum Disorders
A Literature Review of Gustatory Over-Responsivity Among the Population with Autism Spectrum Disorders
Introduction Atypical response to sensory stimuli is common in the autism spectrum disorder (ASD) population. While sensory over-responsivity in the gustatory domain (GOR) among A...
Understanding the Deviation of Horizontal Wolfcamp Well GOR from Type-Curve GOR in the Gas-Condensate Region of the Permian Basin
Understanding the Deviation of Horizontal Wolfcamp Well GOR from Type-Curve GOR in the Gas-Condensate Region of the Permian Basin
Abstract
The objective of this work is to explain the deviation in GOR/GLR (Gas-Oil-Ratio/Gas-Liquid-Ratio) of hydraulically fractured Wolfcamp horizontal shale well...