Javascript must be enabled to continue!
Effect of Shaft Pillar Extraction on Stability of Main Shaft: A Case Study at Xincheng Gold Mine, China
View through CrossRef
Mining of ore body in the vicinity of a shaft has a significant influence on its stability. The in situ monitoring and numerical simulation are employed to analyze the effect of shaft pillar extraction at Xincheng Gold Mine. The XI# ore body is recently found around and beneath the shaft, and mining in this area may be detrimental to the shaft. Firstly, on the base of geological survey and in situ displacement monitoring, mechanical parameters of rock mass are obtained and the displacement around the shaft is measured. Secondly, the sensitivities of five main factors that may affect the shaft displacement are analyzed by means of orthogonal experiment according to the numerical simulation with FLAC3D. Finally, a numerical model is established according to the in situ condition; in order to forecast the shaft displacement induced by mining activities of XI# orebody, the Mining Priority Index (MPI) is put forward and used to select the optimal mining sequence. Based on the comparison between the numerical results with the monitoring data, it is determined that the ore within 100 m from the shaft is not suggested to be extracted until the last period of the shaft life.
Title: Effect of Shaft Pillar Extraction on Stability of Main Shaft: A Case Study at Xincheng Gold Mine, China
Description:
Mining of ore body in the vicinity of a shaft has a significant influence on its stability.
The in situ monitoring and numerical simulation are employed to analyze the effect of shaft pillar extraction at Xincheng Gold Mine.
The XI# ore body is recently found around and beneath the shaft, and mining in this area may be detrimental to the shaft.
Firstly, on the base of geological survey and in situ displacement monitoring, mechanical parameters of rock mass are obtained and the displacement around the shaft is measured.
Secondly, the sensitivities of five main factors that may affect the shaft displacement are analyzed by means of orthogonal experiment according to the numerical simulation with FLAC3D.
Finally, a numerical model is established according to the in situ condition; in order to forecast the shaft displacement induced by mining activities of XI# orebody, the Mining Priority Index (MPI) is put forward and used to select the optimal mining sequence.
Based on the comparison between the numerical results with the monitoring data, it is determined that the ore within 100 m from the shaft is not suggested to be extracted until the last period of the shaft life.
Related Results
Research on water immersion damage characteristics and equivalent width of coal pillar
Research on water immersion damage characteristics and equivalent width of coal pillar
Abstract
Affected by weakening effect of water in the goaf, the bearing capacity of coal pillar reduced, and coal pillar rock burst is prone to occur, which is a serious th...
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Effect of Normalizing on Semi Float Axle Shaft Performance - Case Study
Effect of Normalizing on Semi Float Axle Shaft Performance - Case Study
The primary function of axle shaft in semi float rear axle is to transmit the power to wheels. These shafts would experience the torsional load along with bending load as well. Hen...
Lightweight Design of Patch Plate on Car-body B-pillar based on Side Impact Safety
Lightweight Design of Patch Plate on Car-body B-pillar based on Side Impact Safety
The B-pillar of automobile needs to meet the requirements of vehicle strength and rigidity, and also consider the fuel economy of vehicle. Therefore, the design and development of ...
Doklam Standoff Resolution: Interview of Major General S B Asthana by SCMP
Doklam Standoff Resolution: Interview of Major General S B Asthana by SCMP
(Views of Major General S B Asthana,SM,VSM, (Veteran), Questioned by Jiangtao Shi of South China Morning Post on 29 August 2017.Question 1 (SCMP)Are you surprised that the over 70-...
The Epidemiology of Infant Shaft Fractures of Femur or Humerus by Incidence, Birth, Accidents, and Other Causes
The Epidemiology of Infant Shaft Fractures of Femur or Humerus by Incidence, Birth, Accidents, and Other Causes
Abstract
Background: Knowledge of femur and humerus shaft fractures during infancy is scarce. The purpose of this population-based registry study was to analyze both birth-...
Supercapacitive MnO2/PEDOT: PSS Modified 3D-Printed Polymeric Micro-Pillar Electrode for Extraction of Photosynthetic Electrons
Supercapacitive MnO2/PEDOT: PSS Modified 3D-Printed Polymeric Micro-Pillar Electrode for Extraction of Photosynthetic Electrons
Photosynthetic bio-electrochemical cells (PBECs) have been reported as having promising potential for the renewable energy field. When photosynthesis occurs, photosynthetic electro...
A Preliminary Review of Metallogenic Regularity of Gold Deposits in China
A Preliminary Review of Metallogenic Regularity of Gold Deposits in China
AbstractGold is one of the most important mineral resources in China with its rich mineral resources. In recent years, significant progress has been made on the process of gold res...

