Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Research on Key Technologies of Intelligent Maintenance for Rail Transit in Henan

View through CrossRef
Background: With the rapid expansion of Henan's rail transit network, the traditional manual operation and maintenance mode can no longer meet the requirements for high efficiency, safety, and economy, and there is an urgent need to transition toward intelligent and predictive maintenance. Objective: This review explored the development status of intelligent maintenance for subway tunnels, tracks and vehicles under the background of multi-network integration in Henan Province, analyze the key dilemmas including inconsistent standards, data silos, insufficient algorithm robustness and inadequate system integration, solve the practical problems such as low operation efficiency and potential safety risks, clarify the obstacles restricting the upgrading of intelligent maintenance, and provide theoretical support and practical guidance for constructing a full-lifecycle intelligent operation and maintenance system. Method: Domestic and foreign literatures and typical cases from 2020 to 2025 were systematically reviewed, and the application effects of core intelligent technologies in Henan rail transit were comprehensively compared and analyzed. Results: High-precision intelligent detection and fault diagnosis systems have been formed for tunnel, track and vehicle components, which effectively support the transformation from regular maintenance to predictive maintenance. Henan metro intelligent maintenance has achieved breakthroughs in individual technologies, but the current system still faces four core bottlenecks: non‑uniform multi‑system standards, severe data silos, insufficient algorithm robustness, and lack of system integration. Specifically, cities such as Zhengzhou and Luoyang have not yet established a cross‑system condition perception and information exchange mechanism among high‑speed rail, intercity railways, suburban railways, and subways, making it difficult to interconnect inspection data, maintenance records, and asset ledgers. Existing intelligent detection algorithms perform well in laboratory environments, but their robustness and generalization capabilities under complex on‑site conditions such as lighting variations, vibrations, and electromagnetic interference still require systematic validation. Moreover, a balance has yet to be struck among the high cost, lightweight design, and low‑power consumption requirements of intelligent maintenance equipment. Conclusion: Current pilot projects are largely characterized by "isolated demonstrations and fragmented construction", lacking a closed‑loop integration architecture from the perception layer and data layer to the decision‑making layer and execution layer. Therefore, there is an urgent need to build a "technology‑management integrated" full‑lifecycle intelligent operation and maintenance ecosystem. Future efforts should focus on breaking through key technologies such as multi‑source heterogeneous data fusion, cross‑system collaborative diagnosis, and dynamic maintenance decision support, to create a full‑chain intelligent maintenance platform covering "perception‑analysis‑decision‑execution", supported by unified standards and evaluation systems, so as to truly achieve the transition from individual technology breakthroughs to systemic ecological capability.
Title: Research on Key Technologies of Intelligent Maintenance for Rail Transit in Henan
Description:
Background: With the rapid expansion of Henan's rail transit network, the traditional manual operation and maintenance mode can no longer meet the requirements for high efficiency, safety, and economy, and there is an urgent need to transition toward intelligent and predictive maintenance.
Objective: This review explored the development status of intelligent maintenance for subway tunnels, tracks and vehicles under the background of multi-network integration in Henan Province, analyze the key dilemmas including inconsistent standards, data silos, insufficient algorithm robustness and inadequate system integration, solve the practical problems such as low operation efficiency and potential safety risks, clarify the obstacles restricting the upgrading of intelligent maintenance, and provide theoretical support and practical guidance for constructing a full-lifecycle intelligent operation and maintenance system.
Method: Domestic and foreign literatures and typical cases from 2020 to 2025 were systematically reviewed, and the application effects of core intelligent technologies in Henan rail transit were comprehensively compared and analyzed.
Results: High-precision intelligent detection and fault diagnosis systems have been formed for tunnel, track and vehicle components, which effectively support the transformation from regular maintenance to predictive maintenance.
Henan metro intelligent maintenance has achieved breakthroughs in individual technologies, but the current system still faces four core bottlenecks: non‑uniform multi‑system standards, severe data silos, insufficient algorithm robustness, and lack of system integration.
Specifically, cities such as Zhengzhou and Luoyang have not yet established a cross‑system condition perception and information exchange mechanism among high‑speed rail, intercity railways, suburban railways, and subways, making it difficult to interconnect inspection data, maintenance records, and asset ledgers.
Existing intelligent detection algorithms perform well in laboratory environments, but their robustness and generalization capabilities under complex on‑site conditions such as lighting variations, vibrations, and electromagnetic interference still require systematic validation.
Moreover, a balance has yet to be struck among the high cost, lightweight design, and low‑power consumption requirements of intelligent maintenance equipment.
Conclusion: Current pilot projects are largely characterized by "isolated demonstrations and fragmented construction", lacking a closed‑loop integration architecture from the perception layer and data layer to the decision‑making layer and execution layer.
Therefore, there is an urgent need to build a "technology‑management integrated" full‑lifecycle intelligent operation and maintenance ecosystem.
Future efforts should focus on breaking through key technologies such as multi‑source heterogeneous data fusion, cross‑system collaborative diagnosis, and dynamic maintenance decision support, to create a full‑chain intelligent maintenance platform covering "perception‑analysis‑decision‑execution", supported by unified standards and evaluation systems, so as to truly achieve the transition from individual technology breakthroughs to systemic ecological capability.

Related Results

Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition is the driving force of any economic system, as it creates a challenging environment for service suppliers to provide affordable and reliable services to customers. Rai...
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
The increasing of traffic and operation speed in urban transits has accelerated the degradation of track components. Rail wear, especially extended side wear of the high rail on sh...
Design of Flangeway Gap for Restraining Rail
Design of Flangeway Gap for Restraining Rail
The aim of the paper is to classify restraining rail, discuss the advantages and disadvantages of each type of restraining rail, derive the formula to determine the flangeway gap, ...
Research on 5G Key Technologies and Applications in Urban Rail Transit
Research on 5G Key Technologies and Applications in Urban Rail Transit
With the rapid development of science and technology, Chinese urban rail transit has entered a newstage of intelligent development from the stage of rapid construction....
San Pedro Bay Ports Rail Enhancement Program: 2010 Update
San Pedro Bay Ports Rail Enhancement Program: 2010 Update
The San Pedro Bay Ports of Long Beach and Los Angeles continue to provide vital rail connections to the rest of the country. The Rail Enhancement Program sets forth the rail improv...
Fatigue Analysis of Rail-Head-to-Web Fillet at Bolted Rail Joint Under Various Impact Wheel Load Factors and Support Configurations
Fatigue Analysis of Rail-Head-to-Web Fillet at Bolted Rail Joint Under Various Impact Wheel Load Factors and Support Configurations
As one of the weakest locations in the track superstructure, the rail joint encounters different types of defects and failures, including rail bolt-hole cracking, rail head-web cra...
Towards a Better Understanding of the Rail Grinding Mechanism
Towards a Better Understanding of the Rail Grinding Mechanism
Rail grinding continues to be one of the most effective techniques for extending rail life, improving wheel/rail contact behavior, and reducing the overall cost of track maintenanc...
Effect of Design Rail Cant on Concrete Crosstie Rail Seat Pressure Distribution
Effect of Design Rail Cant on Concrete Crosstie Rail Seat Pressure Distribution
Previous research has focused on the effect of rail cant on rail wear and wheel/rail interaction, indicating that a steeper rail cant results in increased wear on rails and wheels....

Back to Top