Javascript must be enabled to continue!
Multi-Objective Robust Scheduling Optimization Model of Wind, Photovoltaic Power, and BESS Based on the Pareto Principle
View through CrossRef
With the increasing proportion of distributed power supplies connected to the power grid, the application of a battery energy storage system (BESS) to a power system leads to new ideas of effectively solving the problem of distributed power grid connections. There is obvious uncertainty involved in distributed power output, and these uncertainties must be considered when optimizing the scheduling of virtual power plants. In this context, scene simulation technology was used to manage the uncertainty of wind power and photovoltaic output, forming a classic scenario. In this study, to reduce the influence of the uncertainty of wind and photovoltaic power output on the stable operation of the system, the time-of-use (TOU) prices and BESS were incorporated into the optimal scheduling problem that is inherent in wind and photovoltaic power. First, this study used the golden section method to simulate the wind and photovoltaic power output; second, the day-ahead wind and photovoltaic power output were used as the random variables; third, a wind and photovoltaic power BESS robust scheduling model that considers the TOU price was constructed. Finally, this paper presents the Institute of Electrical and Electronics Engineers (IEEE) 30 bus system in an example simulation, where the solution set is based on the Pareto principle, and the global optimal solution can be obtained by the robust optimization model. The results show that the cooperation between the TOU price and BESS can counteract wind and photovoltaic power uncertainties, improve system efficiency, and reduce the coal consumption of the system. The example analysis proves that the proposed model is practical and effective. By accounting for the influence of uncertainty of the optimal scheduling model, the actual operating cost can be reduced, and the robustness of the optimization strategy can be improved.
Title: Multi-Objective Robust Scheduling Optimization Model of Wind, Photovoltaic Power, and BESS Based on the Pareto Principle
Description:
With the increasing proportion of distributed power supplies connected to the power grid, the application of a battery energy storage system (BESS) to a power system leads to new ideas of effectively solving the problem of distributed power grid connections.
There is obvious uncertainty involved in distributed power output, and these uncertainties must be considered when optimizing the scheduling of virtual power plants.
In this context, scene simulation technology was used to manage the uncertainty of wind power and photovoltaic output, forming a classic scenario.
In this study, to reduce the influence of the uncertainty of wind and photovoltaic power output on the stable operation of the system, the time-of-use (TOU) prices and BESS were incorporated into the optimal scheduling problem that is inherent in wind and photovoltaic power.
First, this study used the golden section method to simulate the wind and photovoltaic power output; second, the day-ahead wind and photovoltaic power output were used as the random variables; third, a wind and photovoltaic power BESS robust scheduling model that considers the TOU price was constructed.
Finally, this paper presents the Institute of Electrical and Electronics Engineers (IEEE) 30 bus system in an example simulation, where the solution set is based on the Pareto principle, and the global optimal solution can be obtained by the robust optimization model.
The results show that the cooperation between the TOU price and BESS can counteract wind and photovoltaic power uncertainties, improve system efficiency, and reduce the coal consumption of the system.
The example analysis proves that the proposed model is practical and effective.
By accounting for the influence of uncertainty of the optimal scheduling model, the actual operating cost can be reduced, and the robustness of the optimization strategy can be improved.
Related Results
Analysis of Senegal Type Vertical Axis Wind Turbines Arrangement in Wind Farm
Analysis of Senegal Type Vertical Axis Wind Turbines Arrangement in Wind Farm
Background:
In a wind farm, the wind speed of the downstream wind turbine will be
lower than the wind speed of the upstream wind turbine due to the influence of the wake. Therefore...
Many-Objective Genetic Programming for Job-Shop Scheduling
Many-Objective Genetic Programming for Job-Shop Scheduling
<p>The Job Shop Scheduling (JSS) problem is considered to be a challenging one due to practical requirements such as multiple objectives and the complexity of production flow...
Savonius Rotor for Offshore Wind Energy Conversion
Savonius Rotor for Offshore Wind Energy Conversion
Abstract
Analysis of performance is presented for wind energy conversion by a Savonius type vertical axis rotor configured for generation of electrical power. The...
Multiterminal HVDC transmissions systems for offshore wind
Multiterminal HVDC transmissions systems for offshore wind
Offshore wind is emerging as one of the future energy vectors. Offshore wind power plants locations provide more strong and constant wind speed that allows to extract more power co...
Short-term optimization scheduling method of cascade hydropower and photovoltaic complementary system based on pumping station operation strategy
Short-term optimization scheduling method of cascade hydropower and photovoltaic complementary system based on pumping station operation strategy
With the rapid development of photovoltaic power generation, how to improve the photovoltaic grid connection rate is an urgent problem to be solved. This article proposes an optimi...
Multi-Objective Distributionally Robust Optimal Scheduling of Park-Level Integrated Energy System
Multi-Objective Distributionally Robust Optimal Scheduling of Park-Level Integrated Energy System
In order to reduce operational costs and improve energy utilization
efficiency of the park-level integrated energy system (IES), a
multi-objective distributionally robust schedulin...
Design and Performance Analysis of Distributed Equal Angle Spiral Vertical Axis Wind Turbine
Design and Performance Analysis of Distributed Equal Angle Spiral Vertical Axis Wind Turbine
Background:
The wind turbine is divided into a horizontal axis and a vertical axis depending
on the relative positions of the rotating shaft and the ground. The advantage of the ch...
wLEACH: Real-Time Meteorological Data Based Wind LEACH
wLEACH: Real-Time Meteorological Data Based Wind LEACH
Introduction:Nowadays, Wireless Sensor Network (WSN) plays an important role in various fields. The limited power capability of the sensor nodes in the WSN brings constraints on th...