Float-Over Installation Analysis of Semisubmersible Production Platform Topside
View through CrossRef
Compared with split lifting by floating crane, the float-over is less time-consuming and has larger lifting capacity, especially suitable for large and medium sized offshore platforms. Float-over installation process of a deepwater semisubmersible platform topside is analyzed in this paper. And the multi-floating coupling calculation is carried out in the typical loading conditions of mating process between topside and column top structure. The motion response of leg mating unit in position of barge is received. The calculation results show that the float movement condition meets float-over installation requirements of topside. The analysis can provide a reference for the project of the float-over installation in the future.
American Society of Mechanical Engineers
Title: Float-Over Installation Analysis of Semisubmersible Production Platform Topside
Description:
Compared with split lifting by floating crane, the float-over is less time-consuming and has larger lifting capacity, especially suitable for large and medium sized offshore platforms.
Float-over installation process of a deepwater semisubmersible platform topside is analyzed in this paper.
And the multi-floating coupling calculation is carried out in the typical loading conditions of mating process between topside and column top structure.
The motion response of leg mating unit in position of barge is received.
The calculation results show that the float movement condition meets float-over installation requirements of topside.
The analysis can provide a reference for the project of the float-over installation in the future.
Related Results
Successful Float Over Installation by Portable DP Vessel
Successful Float Over Installation by Portable DP Vessel
ABSTRACT
Float over topside installation has become a cost effective alternative for offshore construction over the past 25-30 years, as ever-increasing integrated t...
Arthit Field Development: Float-over Hardware Design and Issues
Arthit Field Development: Float-over Hardware Design and Issues
Abstract
The 17,500 metric ton Arthit PP topsides was successfully installed in December of 2007 in the Gulf of Thailand after a short voyage from Batam Island, I...
Independence Installation
Independence Installation
Abstract
This Session paper will review the planning, preparation, and execution of the installation of the Independence Hub facility in Mississippi Canyon Block ...
DESAIN STRUKTUR FLOAT PESAWAT AMFIBI
DESAIN STRUKTUR FLOAT PESAWAT AMFIBI
Lembaga Penerbangan dan Antariksa Nasional (LAPAN) berkerja sama dengan PT Dirgantara Indonesia (PT DI) berupaya mengembangkan pesawat N219 menjadi pesawat amfibi. Pengembangan ter...
Pieter Schelte, a Twin Tanker Vessel Concept for the Single Piece Removal of Large Topsides and Jackets
Pieter Schelte, a Twin Tanker Vessel Concept for the Single Piece Removal of Large Topsides and Jackets
Abstract
In this paper a safe and cost effective approach to the removal of large oil and gas offshore platforms is presented. A dedicated vessel will be commissi...
Anteo : the Float-over giant
Anteo : the Float-over giant
Abstract
Anteo is a "giant" hydraulic system providing one of the most reliable and cost-effective solution to the market demand of Integrated Deck installation b...
The IRI topside parameters
The IRI topside parameters
Abstract. The IRI electron density topside has been constructed on the basis of the data available about thirty years ago. Recently a large amount of data from old topside sounders...
Float-over of Arthit PP Deck
Float-over of Arthit PP Deck
Abstract
In December 2007, the 17,500-metric ton, Arthit PP deck was installed over the substructure in a single piece by a using J. Ray McDermott's (J. Ray) tran...