Penentuan Interval Waktu Pemeliharaan Pencegahan pada Peralatan Sub-Unit RKC 3 di PTX Pabrik Tuban

View through CrossRef
PT X Tuban Plant has four plants (unit), namely Tuban I, Tuban II, Tuban III and Tuban IV. Each unit plant has three sub units, i.e., Crusher Operations Sub-Unit, Raw Mill, Kiln and Coal Mill (RKC) Sub-Unit and Finish Mill Sub-Unit. RKC 3 Sub-Unit in Tuban III has the highest number of equipment downtime and production loss. Therefore, it was necessary to optimize the time interval of preventive maintenance ( ) and total labor force as part of the company maintenance policy, would also fulfill the required reliability and availability of RKC 3 Sub-Unit. There were two steps in determining Tp optimum. The first step was to obtain the best distribution of the time between failures (TBF) and time to repair (TTR). The next step was to iterate the operating time (Ti) and Tp to determine the minimum preventive maintenance cost rate, reliability and maintainability.This iteration was applied to sub-units of RKC 3 that possesses a series system. Tp at the lowest rate of maintenance costs was the optimum Tp. The optimum Tp for RKC 3 Sub-Unit is 3743,28 hour. The preventive maintenance cost rate for optimum Tp is Rp33.100/hour and the reliability and availability of sub unit are 96,7% and 99,86% respectively.Keywords: reliability, availability, preventive maintenance cost rate, and preventive maintenance
Title: Penentuan Interval Waktu Pemeliharaan Pencegahan pada Peralatan Sub-Unit RKC 3 di PTX Pabrik Tuban
Description:
PT X Tuban Plant has four plants (unit), namely Tuban I, Tuban II, Tuban III and Tuban IV.
Each unit plant has three sub units, i.
e.
, Crusher Operations Sub-Unit, Raw Mill, Kiln and Coal Mill (RKC) Sub-Unit and Finish Mill Sub-Unit.
RKC 3 Sub-Unit in Tuban III has the highest number of equipment downtime and production loss.
Therefore, it was necessary to optimize the time interval of preventive maintenance ( ) and total labor force as part of the company maintenance policy, would also fulfill the required reliability and availability of RKC 3 Sub-Unit.
There were two steps in determining Tp optimum.
The first step was to obtain the best distribution of the time between failures (TBF) and time to repair (TTR).
The next step was to iterate the operating time (Ti) and Tp to determine the minimum preventive maintenance cost rate, reliability and maintainability.
This iteration was applied to sub-units of RKC 3 that possesses a series system.
Tp at the lowest rate of maintenance costs was the optimum Tp.
The optimum Tp for RKC 3 Sub-Unit is 3743,28 hour.
The preventive maintenance cost rate for optimum Tp is Rp33.
100/hour and the reliability and availability of sub unit are 96,7% and 99,86% respectively.
Keywords: reliability, availability, preventive maintenance cost rate, and preventive maintenance.

Related Results

Is the Level of Pentraxin-3 a Valid Biomarker in Axial Spondyloarthritis?
Is the Level of Pentraxin-3 a Valid Biomarker in Axial Spondyloarthritis?
Abstract Background Pentraxin-3 (PTX-3) is essential in inflammation, remodelling and regulation of inflammation in various rheumatic diseases. This s...
ILP4 and InR regulate Paclitaxel-induced hypersensitivity differently in Drosophila larvae
ILP4 and InR regulate Paclitaxel-induced hypersensitivity differently in Drosophila larvae
Abstract Paclitaxel (PTX), a chemotherapeutic that stabilizes microtubules, induces nociceptive hypersensitivity and sensory neuron damage in humans, mice, and flies. T...
Investigation of Pectenotoxin Profiles in the Yellow Sea (China) Using a Passive Sampling Technique
Investigation of Pectenotoxin Profiles in the Yellow Sea (China) Using a Passive Sampling Technique
Pectenotoxins (PTXs) are a group of lipophilic algal toxins. These toxins have been found in algae and shellfish from Japan, New Zealand, Ireland, Norway and Portugal. PTX profiles...
Improved anti-glioblastoma efficacy by IL-13Rα2 mediated copolymer nanoparticles loaded with paclitaxel
Improved anti-glioblastoma efficacy by IL-13Rα2 mediated copolymer nanoparticles loaded with paclitaxel
AbstractGlioma presents one of the most malignant brain tumors and the therapeutic effect is often limited due to the existence of brain tumor barrier. Based on interleukin-13 rece...
BIAYA PEMELIHARAAN ASSET TETAP TERHADAP LABA
BIAYA PEMELIHARAAN ASSET TETAP TERHADAP LABA
Biaya pemeliharaan asset tetap dan laba dalam kurun waktu tahun 2019 sampai tahun 2023 yang diperoleh  Mr. Cling  Laundry mengalami fluktuasi, yang disebabkan oleh berbagai macam f...
Abstract 1502: Microtubule stabilization alters tumor secretome and fibroblast activation
Abstract 1502: Microtubule stabilization alters tumor secretome and fibroblast activation
Abstract Microtubules (MTs) represent one of the most effective targets in cancer chemotherapy. However, drugs that target MTs, like the taxanes, often fail in the m...

Back to Top