Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Real-time optimisation of the Hoa Binh reservoir, Vietnam

View through CrossRef
Multi-purpose reservoirs often have to be managed according to conflicting objectives, which requires efficient tools for trading-off the objectives. This paper proposes a multi-objective simulation-optimisation approach that couples off-line rule curve optimisation with on-line real-time optimisation. First, the simulation-optimisation framework is applied for optimising reservoir operating rules. Secondly, real-time and forecast information is used for on-line optimisation that focuses on short-term goals, such as flood control or hydropower generation, without compromising the deviation of the long-term objectives from the optimised rule curves. The method is illustrated for optimisation of the Hoa Binh reservoir in Vietnam. The approach is proven efficient to trade-off conflicting objectives. Selected by a Pareto optimisation method, the preferred optimum is able to mitigate the floods in the downstream part of the Red River, and at the same time to increase hydropower generation and to save water for the dry season. The real-time optimisation procedure further improves the efficiency of the reservoir operation and enhances the flexibility for the decision-making. Finally, the quality of the forecast is addressed. The results illustrate the importance of a sufficient forecast lead time to start pre-releasing water in flood situations.
Title: Real-time optimisation of the Hoa Binh reservoir, Vietnam
Description:
Multi-purpose reservoirs often have to be managed according to conflicting objectives, which requires efficient tools for trading-off the objectives.
This paper proposes a multi-objective simulation-optimisation approach that couples off-line rule curve optimisation with on-line real-time optimisation.
First, the simulation-optimisation framework is applied for optimising reservoir operating rules.
Secondly, real-time and forecast information is used for on-line optimisation that focuses on short-term goals, such as flood control or hydropower generation, without compromising the deviation of the long-term objectives from the optimised rule curves.
The method is illustrated for optimisation of the Hoa Binh reservoir in Vietnam.
The approach is proven efficient to trade-off conflicting objectives.
Selected by a Pareto optimisation method, the preferred optimum is able to mitigate the floods in the downstream part of the Red River, and at the same time to increase hydropower generation and to save water for the dry season.
The real-time optimisation procedure further improves the efficiency of the reservoir operation and enhances the flexibility for the decision-making.
Finally, the quality of the forecast is addressed.
The results illustrate the importance of a sufficient forecast lead time to start pre-releasing water in flood situations.

Related Results

Biodiversity potential and scientific basis for conservation in the Song Hinh - Tay Hoa area, Dak Lak province, Vietnam
Biodiversity potential and scientific basis for conservation in the Song Hinh - Tay Hoa area, Dak Lak province, Vietnam
The Song Hinh - Tay Hoa area harbors exceptional ecological and biodiversity values. Two characteristic forest ecosystems are represented: lowland and mid-montane evergreen tropica...
STRESS OXY HÓA VỚI BỆNH TẬT
STRESS OXY HÓA VỚI BỆNH TẬT
Stress oxy hóa là tình trạng mất cân bằng giữa gốc tự do hay gốc có oxy hoạt động và chất chống oxy hóa. Cơ thể cần một số lượng gốc tự do, gốc có oxy hoạt động cho hoạt động bình ...
Cường độ tiếng ồn và các yếu tố liên quan tại các tuyến đường chính của thị trấn Tân Túc huyện Bình Chánh thành phố Hồ Chí Minh
Cường độ tiếng ồn và các yếu tố liên quan tại các tuyến đường chính của thị trấn Tân Túc huyện Bình Chánh thành phố Hồ Chí Minh
- Đặt vấn đề: Ô nhiễm tiếng ồn do giao thông có ảnh hưởng nghiêm trọng đến sức khỏe con người.Tuy nhiên, cho tới năm 2019, tại thị trấn Tân Túc, huyện Bình Chánh, Thành phố Hồ Chí ...
Robust design optimization of electrical machines for electric and hybrid vehicles
Robust design optimization of electrical machines for electric and hybrid vehicles
Contribution méthodologique au dimensionnement optimal et robuste des machines électriques dédiées aux chaines de traction VE et VEH Face aux préoccupations croissa...
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Improved Reservoir Fluid Estimation for Prospect Evaluation Using Mud Gas Data
Abstract Reservoir fluid estimation for exploration prospects can be random and of large uncertainties. Typically, the reservoir fluid estimation in a prospect can b...
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
New Perspectives for 3D Visualization of Dynamic Reservoir Uncertainty
This reference is for an abstract only. A full paper was not submitted for this conference. Abstract 1 Int...
Thực Trạng Trình Độ và Nhu Cầu Nâng Cao Trình Độ của Giảng Viên cho Đào Tạo Ngành Cơ Khí - Tự Động Hoá, Trình Độ Quốc Tế tại Việt Nam
Thực Trạng Trình Độ và Nhu Cầu Nâng Cao Trình Độ của Giảng Viên cho Đào Tạo Ngành Cơ Khí - Tự Động Hoá, Trình Độ Quốc Tế tại Việt Nam
Đào tạo nguồn nhân lực chất lượng cao cho các lĩnh vực ngành nghề trong bối cảnh hội nhập quốc tế và cuộc cách mạng công nghiệp 4.0 đòi hỏi cần có các nhà giáo đáp ứng yêu cầu về t...

Back to Top