THE COMPARATIVE ANALYSIS OF PLAN AND ACTUALFUEL RATIO ON THE LOADING TOOLS OF KOBELCO SK 520, SK 330 EXCAVATORS AND HAULING TOOL OF HINO FM260 JD DUMP TRUCK

View through CrossRef
One of the biggest needs in mining activities is mechanical equipment to achieve production target which needs fuel. A mechanical tool is declared successful if it is able to meet the production target by using a minimum of fuel consumption. The excessive use of fuel will affect the company's profits. The ratio between total fuel consumption and total production is called the fuel ratio. A company is successful or gains profit if the plan fuel ratio is higher that the actual fuel ratio. The aim of this research was to analyze the comparison between plan and actual fuel ratio on Kobelco SK 520, Kobelco SK 330 excavators and Hino FM 260 JD Dump Truck. This analysis process was conducted by knowing the production target and realization of the overburden and coal getting production target. In March 2022, the production of SK 520 was 43,147.97 BCWmonth, DT 8-193 10,328.07 BCM/month, SK 330 was 41,981.76 tonnes/month, DT 8-138was 8,169.43 tonnes/month. In April 2022, the production of SK 520 was 50,188.03 BCM/month, DT 8-193 was 8,750.25 BCWmonth, SK 330 was 38,555.66 tonnes/month, DT 8-138 was 8,432.83 tonnes/month. The fuel ratio in March were SK 520 of 0.19 litre/BCM, DT 8-193 of 0.27 litrefBCM, SK 330 of 0.17 litre/ton and DT 8-138 of 0.23 litre/ton. The fuel ratio in April 2022 were SK 520 ofO. 19 litre/BCM, DT 8-193 ofO.29 litre/BCM, SK 330 of0.18 liter/ton, and DT 8-138 of 0.21 litre/ton. The loss of fuel ratio in March 2022 on the overburden removal was SK 520 of Rp 22,652,684 and DT 8-193 of Rp the coal getting activity on SK 330 was Rp 36,734,040 and DT 8-138 of Rp In April 2022, the loss on the overburden removal on SK 520 was Rp 35,733,877.36 and on DT 8-193 was Rp 7,787,723, and the coal getting on SK 330 was Rp 27,451,630 and DT 8-138 was Rp 6,004,175.
Title: THE COMPARATIVE ANALYSIS OF PLAN AND ACTUALFUEL RATIO ON THE LOADING TOOLS OF KOBELCO SK 520, SK 330 EXCAVATORS AND HAULING TOOL OF HINO FM260 JD DUMP TRUCK
Description:
One of the biggest needs in mining activities is mechanical equipment to achieve production target which needs fuel.
A mechanical tool is declared successful if it is able to meet the production target by using a minimum of fuel consumption.
The excessive use of fuel will affect the company's profits.
The ratio between total fuel consumption and total production is called the fuel ratio.
A company is successful or gains profit if the plan fuel ratio is higher that the actual fuel ratio.
The aim of this research was to analyze the comparison between plan and actual fuel ratio on Kobelco SK 520, Kobelco SK 330 excavators and Hino FM 260 JD Dump Truck.
This analysis process was conducted by knowing the production target and realization of the overburden and coal getting production target.
In March 2022, the production of SK 520 was 43,147.
97 BCWmonth, DT 8-193 10,328.
07 BCM/month, SK 330 was 41,981.
76 tonnes/month, DT 8-138was 8,169.
43 tonnes/month.
In April 2022, the production of SK 520 was 50,188.
03 BCM/month, DT 8-193 was 8,750.
25 BCWmonth, SK 330 was 38,555.
66 tonnes/month, DT 8-138 was 8,432.
83 tonnes/month.
The fuel ratio in March were SK 520 of 0.
19 litre/BCM, DT 8-193 of 0.
27 litrefBCM, SK 330 of 0.
17 litre/ton and DT 8-138 of 0.
23 litre/ton.
The fuel ratio in April 2022 were SK 520 ofO.
19 litre/BCM, DT 8-193 ofO.
29 litre/BCM, SK 330 of0.
18 liter/ton, and DT 8-138 of 0.
21 litre/ton.
The loss of fuel ratio in March 2022 on the overburden removal was SK 520 of Rp 22,652,684 and DT 8-193 of Rp the coal getting activity on SK 330 was Rp 36,734,040 and DT 8-138 of Rp In April 2022, the loss on the overburden removal on SK 520 was Rp 35,733,877.
36 and on DT 8-193 was Rp 7,787,723, and the coal getting on SK 330 was Rp 27,451,630 and DT 8-138 was Rp 6,004,175.

Related Results

Primerjalna književnost na prelomu tisočletja
Primerjalna književnost na prelomu tisočletja
In a comprehensive and at times critical manner, this volume seeks to shed light on the development of events in Western (i.e., European and North American) comparative literature ...
PARAMETER YANG MEMPENGARUHI PRODUKTIVITAS PENGEBORAN, PELEDAKAN, DAN SISTEM SHOVEL-DUMP TRUCK PADA TAMBANG ANDESIT
PARAMETER YANG MEMPENGARUHI PRODUKTIVITAS PENGEBORAN, PELEDAKAN, DAN SISTEM SHOVEL-DUMP TRUCK PADA TAMBANG ANDESIT
PT Sumber Gunung Maju Bravo 10 merupakan perusahaan penambangan andesit yang terletak di Desa Ukirsari, Serang, Banten. Ketidaktercapaian target pengeboran per hari, terdapat beber...
Interacting FDOs for Secure Processes
Interacting FDOs for Secure Processes
In modern industry, administration and research there are many processes that involve distributed actors needing to securely create, update and manage information. Typical examples...
Estimasi Biaya Alat Muat Dan Angkut Penambangan Quarry Batu Andesit PT Putra Elan Balindo Pada Kota Palu Sulawesi Tengah
Estimasi Biaya Alat Muat Dan Angkut Penambangan Quarry Batu Andesit PT Putra Elan Balindo Pada Kota Palu Sulawesi Tengah
PT. Putra Elan Balindo is a company engaged in the mining sector specially the andesite minerals domiciled in Palu City. PT. Putra Elan Balindo located in Watusampu Village, Ulujad...
Acid mine drainage generation potential of waste rocks using weathering cell test in gold mine, Thailand
Acid mine drainage generation potential of waste rocks using weathering cell test in gold mine, Thailand
In gold mine, tons of waste rocks produced and left under atmospheric condition may consequently generate acid mine drainage (AMD). The aims of this study was to predict the AMD ge...
OPTIMALISASI PRODUKSI ALAT BERAT DALAM PEKERJAAN GALIAN DAN TANAMAN DI PROYEK JALAN RAYA (STUDI KASUS: JALUR LINTAS SELATAN LOT 2 BLITAR)
OPTIMALISASI PRODUKSI ALAT BERAT DALAM PEKERJAAN GALIAN DAN TANAMAN DI PROYEK JALAN RAYA (STUDI KASUS: JALUR LINTAS SELATAN LOT 2 BLITAR)
Abstrak             The effectiveness and success of construction projects is greatly influenced by the productivity of heavy equipment, especially in terms of excavation work an...
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Abstract. The andesite rocks in this study come from the PT. Sofa Nugraha mine located in Parung Panjang District, Bogor Regency, West Java Province. The purpose of this research i...
Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
Design and early operation of a new-generation internal beam dump for CERN’s Super Proton Synchrotron
The Super Proton Synchrotron (SPS) is the last stage in the injector chain for CERN’s Large Hadron Collider, and it also provides proton and ion beams for several fixed-target expe...

Back to Top