This thesis aimed to reduce the delay and unnecessarily accelerated or crashed activities of the project by improving the project control system of an interior decoration company. To reduce the delay and unnecessarily accelerated or crashed activities of the project, the network analysis technique is applied in the proposed project control system. In the proposed project control system, four stages in planning and control the project are introduced in the closed loop feedback control system. They are project planning, project scheduling, resource allocation, and project control. In the proposed project control system, a project management software, Microsoft's Profect 98, is applied in the conbination of the four-mentioned stage to aid calculation and to display the results. After tracking a case study project, it is found that the project delayed from the due date 17 days. And the actual total working time is about 29.29% more than the planed total working time; whereas, the actual total wage cost was estimated to more than the plan by 45.41%. However, these failure results were, partly, because of the limitation of the usage of the proposed project control system caused by three principal causes as follows: 1. The lack of the commitments to the proposed system from the involving groups due to poor communication with the other involving group including the subcontractors and other involving groups, and the low role of the researcher in the case study project. 2. The lack of uncerstand and familiarity with the proposed system of the involving individuals the network analysis, and the computer usage. 3. The lack of studying the project before starting of the company-the site constraints and the details of other activities of other activities of other involving groups. Anyway, the researcher believes that if these limitations mentioned mentioned above are solved and there is the application of the proposed system in the case study project, theoretically, the project will be finished on the due date leading to no paid fine. Moreover, no more project managers will be allocated to the project than expected. As the result, at least, the company will save about bath 160, 400; whereas, the project managers can be allocated to more projects. And the overall working time of the company's subcontractors at the project site will be reduced by 38% from the actual usage leading to the reduction in the total wage 44%.
Title: Improvement of the project control system : a case study of an interior decoration company
Description:
This thesis aimed to reduce the delay and unnecessarily accelerated or crashed activities of the project by improving the project control system of an interior decoration company.
To reduce the delay and unnecessarily accelerated or crashed activities of the project, the network analysis technique is applied in the proposed project control system.
In the proposed project control system, four stages in planning and control the project are introduced in the closed loop feedback control system.
They are project planning, project scheduling, resource allocation, and project control.
In the proposed project control system, a project management software, Microsoft's Profect 98, is applied in the conbination of the four-mentioned stage to aid calculation and to display the results.
After tracking a case study project, it is found that the project delayed from the due date 17 days.
And the actual total working time is about 29.
29% more than the planed total working time; whereas, the actual total wage cost was estimated to more than the plan by 45.
41%.
However, these failure results were, partly, because of the limitation of the usage of the proposed project control system caused by three principal causes as follows: 1.
The lack of the commitments to the proposed system from the involving groups due to poor communication with the other involving group including the subcontractors and other involving groups, and the low role of the researcher in the case study project.
2.
The lack of uncerstand and familiarity with the proposed system of the involving individuals the network analysis, and the computer usage.
3.
The lack of studying the project before starting of the company-the site constraints and the details of other activities of other activities of other involving groups.
Anyway, the researcher believes that if these limitations mentioned mentioned above are solved and there is the application of the proposed system in the case study project, theoretically, the project will be finished on the due date leading to no paid fine.
Moreover, no more project managers will be allocated to the project than expected.
As the result, at least, the company will save about bath 160, 400; whereas, the project managers can be allocated to more projects.
And the overall working time of the company's subcontractors at the project site will be reduced by 38% from the actual usage leading to the reduction in the total wage 44%.
Related Results
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct
Introduction
Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Lessons in Diversity: Origins of Interior Decoration Education in the United States, 1870–1930
Lessons in Diversity: Origins of Interior Decoration Education in the United States, 1870–1930
During the last quarter of the nineteenth century, many factors, such as greater emphasis on the importance of the home and its decoration, contributed to the separation of interio...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract
Introduction
Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Social innovation : understanding selected Durban-based interior designers' perceptions of socially responsible interior design
Social innovation : understanding selected Durban-based interior designers' perceptions of socially responsible interior design
In a world with pressing social issues that require the collaboration of multiple stakeholders to solve them, this research sought to find out through the views of interior design ...
Chest Wall Hydatid Cysts: A Systematic Review
Chest Wall Hydatid Cysts: A Systematic Review
Abstract
Introduction
Given the rarity of chest wall hydatid disease, information on this condition is primarily drawn from case reports. Hence, this study systematically reviews t...
Dekorasi Pelaminan Karya Kemahen Art Decoration Ditinjau Dari Prinsip-Prinsip Desain
Dekorasi Pelaminan Karya Kemahen Art Decoration Ditinjau Dari Prinsip-Prinsip Desain
ABSTRACTThe art of decoration is the art of designing, arranging objects, shapes, rooms and other objects with the aim of beautifying and beautifying the visual appearance of the o...
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Abstarct
Introduction
Orbital hydatid cysts (HCs) constitute less than 1% of all cases of hydatidosis, yet their occurrence is often linked to severe visual complications. This stu...
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
The article examines the principles of effective formation of a project management system at an enterprise. In the modern environment, project management standards and management i...