Introduction Disputes involving off-shore projects are always complex. This is due in part to the nature of the projects themselves, which often involve the newest forms of complex technology and construction that may take years to complete. During the construction, thousands of decisions are made and sometimes changed as technology evolves. Each such decision could be examined in the course of a litigation or arbitration, depending upon the issues in dispute. The number of parties involved also contributes to a dispute's complexity. The project's owner, the general contractor, dozens of subcontractors and suppliers, the surety company, and the banks that loaned money for the project's completion all may play a role. Each party may have a different view of the disputed issues and, of course, each is entitled to an attorney. And, because the project could involve perhaps hundreds of people, the number of witnesses who may be interviewed, deposed, and even called to testify in any court or arbitration hearing can be quite large. The amount of potential damages in offshore construction disputes compounds the complexity. Damages are a part of nearly every dispute, of course, but the magnitude of potential damages in off-shore construction disputes tends to make every litigation issue more important: the result of each issue could mean a multi-million dollar difference in any damages award. For example, the issue of who is responsible for a delay in the project's completion " a dispute that frequently arises in off-shore construction projects " may result in millions of dollars in damages if potential revenue is lost when a project is non-operational for many months. Disputed facts may concern critical path scheduling, detailed (or not so detailed) change orders, acceleration and impact costs, design defects, and others. Witnesses could include, among others, those responsible for planning the project, making changes to the project, designing the equipment, bidding for the equipment, ordering of the equipment, and the scheduling of the construction. These witnesses may be employed by the owner, by the contractor, or by any number of subcontractors, all of whom might be parties to the litigation or arbitration. The owner obviously wants to be reimbursed for all lost revenues. The contractor and the subcontractors, on the other hand, want to blame the owner for any delay or, alternatively, blame each other. The surety company that guaranteed the completion of the project wants to either blame the owner or, if it can, collect any damages from the contractor. Finally, the banks want to make sure that their loans are repaid. The lines are thus drawn for a rather complex and high-stakes battle. The practical realities of the parties' relative positions also must be considered in analyzing the dispute. The contractor, who often operates on narrow margins, may lack the money to pay for any damage assessment. This may play a role in litigating the dispute and in attempting to reach any pre-trial settlement. After all, it would do an owner no good if, after a hearing on the dispute, it were awarded hundreds of millions of dollars against a contractor that had no ability to pay.
Title: Litigating To Win The Complex Construction Dispute
Description:
Introduction Disputes involving off-shore projects are always complex.
This is due in part to the nature of the projects themselves, which often involve the newest forms of complex technology and construction that may take years to complete.
During the construction, thousands of decisions are made and sometimes changed as technology evolves.
Each such decision could be examined in the course of a litigation or arbitration, depending upon the issues in dispute.
The number of parties involved also contributes to a dispute's complexity.
The project's owner, the general contractor, dozens of subcontractors and suppliers, the surety company, and the banks that loaned money for the project's completion all may play a role.
Each party may have a different view of the disputed issues and, of course, each is entitled to an attorney.
And, because the project could involve perhaps hundreds of people, the number of witnesses who may be interviewed, deposed, and even called to testify in any court or arbitration hearing can be quite large.
The amount of potential damages in offshore construction disputes compounds the complexity.
Damages are a part of nearly every dispute, of course, but the magnitude of potential damages in off-shore construction disputes tends to make every litigation issue more important: the result of each issue could mean a multi-million dollar difference in any damages award.
For example, the issue of who is responsible for a delay in the project's completion " a dispute that frequently arises in off-shore construction projects " may result in millions of dollars in damages if potential revenue is lost when a project is non-operational for many months.
Disputed facts may concern critical path scheduling, detailed (or not so detailed) change orders, acceleration and impact costs, design defects, and others.
Witnesses could include, among others, those responsible for planning the project, making changes to the project, designing the equipment, bidding for the equipment, ordering of the equipment, and the scheduling of the construction.
These witnesses may be employed by the owner, by the contractor, or by any number of subcontractors, all of whom might be parties to the litigation or arbitration.
The owner obviously wants to be reimbursed for all lost revenues.
The contractor and the subcontractors, on the other hand, want to blame the owner for any delay or, alternatively, blame each other.
The surety company that guaranteed the completion of the project wants to either blame the owner or, if it can, collect any damages from the contractor.
Finally, the banks want to make sure that their loans are repaid.
The lines are thus drawn for a rather complex and high-stakes battle.
The practical realities of the parties' relative positions also must be considered in analyzing the dispute.
The contractor, who often operates on narrow margins, may lack the money to pay for any damage assessment.
This may play a role in litigating the dispute and in attempting to reach any pre-trial settlement.
After all, it would do an owner no good if, after a hearing on the dispute, it were awarded hundreds of millions of dollars against a contractor that had no ability to pay.

Related Results

Win-win-win papakonstantinidis social dilemma
Win-win-win papakonstantinidis social dilemma
Research ON THE EQUILIBRIUM between what is best for individuals and what is best for collectives has long been central to sociology and other social sciences (Simpson and Willer, ...
PSYCHOLOGICAL win-win-win
PSYCHOLOGICAL win-win-win
In a psychological order "win-win-win" indicates legitimate and certain principles of governance Introduces "superego" in place of "individualism" From a psychological perspective...
Practical Suggestions for Win-Win, Win-Lose, Lose-Win, and Lose-Lose Strategies in Mediation or Arbitration
Practical Suggestions for Win-Win, Win-Lose, Lose-Win, and Lose-Lose Strategies in Mediation or Arbitration
This essay discusses the practical aspects of mediation and arbitration. The article outlines effective steps to implement win-win, win-lose, lose-win, and lose-lose negotiation st...
Effects of WIN 55,212 cannabinoid and SMA-WIN 55,212 on the expression of cannabinoid receptors in different glioma cell lines.
Effects of WIN 55,212 cannabinoid and SMA-WIN 55,212 on the expression of cannabinoid receptors in different glioma cell lines.
Abstract Background: Glioblastoma (GBM) is a highly invasive primary malignancy of the brain that is prone to acquiring resistance to chemotherapy. Given the limited therap...
Sustainable TOURISM: win-win-win papakonstantinidis model
Sustainable TOURISM: win-win-win papakonstantinidis model
Tourism is considered by the three forms of its sustainability • The economic sustainability • The social sustainability • The environmental sustainability That corresponds 1-1 t...
Pengaruh Pelayanan, Lokasi, Dan Store Atmosphere Terhadap Keputusan Pembelian Konsumen Pada Minimarket Win Win Kota Jambi
Pengaruh Pelayanan, Lokasi, Dan Store Atmosphere Terhadap Keputusan Pembelian Konsumen Pada Minimarket Win Win Kota Jambi
Penelitian ini bertujuan untuk mengkaji Pengaruh Pelayanan, Lokasi, dan Store Atmosphere secara parsial dan simultan terhadap Keputusan Pembelian Konsumen Pada Minimarket Win Win K...
A Study on Analysis of Dispute Resolution Mechanisms in Construction Contracts
A Study on Analysis of Dispute Resolution Mechanisms in Construction Contracts
The construction industry is considered one of the most complex industries due to involvement of multiple stakeholders such ass clients, contractors, sun contractors, engineers, co...
How to develop a win-win-win-win business model
How to develop a win-win-win-win business model
How many of you want to have a win-win-win-win veterinary business? This is a win for the animals in your care, your pro­ducers, your veterinary business and you personally. ...

Back to Top