Javascript must be enabled to continue!
Fluid Tracking Modeling for Condensate/Oil Production and Gas Utilization Allocation – An Abu Dhabi Onshore Example
View through CrossRef
Abstract
One of the reservoirs in a giant field in onshore Abu Dhabi has been producing for six decades. The reservoir was already saturated at the time of production commencement, with a large oil rim and a gas cap. Both water injection and lean gas injection have been relied upon to sustain production, and will play an even more prominent role for the future development of oil rim and gas cap. Due to the stakeholders’ different entitlements / equity interests in the hydrocarbons originally existed in oil rim area versus gas cap area, it is important to be able to allocate liquid hydrocarbon production and injection gas utilization among the stakeholders, based on a systematic framework.
This paper presents a comprehensive comparison of two modeling-based approaches of fluid tracking for condensate allocation and gas utilization – a tracer modeling option in a commercial reservoir simulator, and a full component fluid tracking approach implemented for this reservoir. The component tracking approach is based on the idea that if individual components represented in a fully compositional reservoir model are tracked separately starting from model initialization, one can trace back the source of hydrocarbon production from both gas cap and oil rim. This approach is implemented through the doubling of the number of components in the equation of state fluid characterization – one set of components for the gas cap, and another set for the oil rim. In order to track the net utilization of the injected lean gas, additional components are needed – in this case one more component representing the lean gas, as the injected gas is a dry gas.
The results of the comprehensive comparison demonstrate very clearly that these two approaches yield consistent condensate allocation and gas utilization results over the entire life of field (including history match and prediction). For condensate allocation, the hydrocarbon liquid production split depends on how the injected lean gas is tracked. For gas utilization, the injected lean gas must be tracked as a distinct component separate from both oil rim and gas cap components. The comparison also shows that although the tracer-based approach is numerically more efficient with less runtime, the full component tracking approach is simulator agnostic, and therefore can be implemented in any reservoir simulator. In addition, the full component tracking method can be used for cases where injection gas is a known mixture of oil rim and gas cap gas – something the tracer-based option cannot handle.
In summary, this paper presents a first comprehensive comparison of the two (2) different fluid tracking modeling approaches, with practical recommendations on modeling-based hydrocarbon liquid production and injection gas utilization allocation in cases where the commercial framework makes such allocation necessary.
Title: Fluid Tracking Modeling for Condensate/Oil Production and Gas Utilization Allocation – An Abu Dhabi Onshore Example
Description:
Abstract
One of the reservoirs in a giant field in onshore Abu Dhabi has been producing for six decades.
The reservoir was already saturated at the time of production commencement, with a large oil rim and a gas cap.
Both water injection and lean gas injection have been relied upon to sustain production, and will play an even more prominent role for the future development of oil rim and gas cap.
Due to the stakeholders’ different entitlements / equity interests in the hydrocarbons originally existed in oil rim area versus gas cap area, it is important to be able to allocate liquid hydrocarbon production and injection gas utilization among the stakeholders, based on a systematic framework.
This paper presents a comprehensive comparison of two modeling-based approaches of fluid tracking for condensate allocation and gas utilization – a tracer modeling option in a commercial reservoir simulator, and a full component fluid tracking approach implemented for this reservoir.
The component tracking approach is based on the idea that if individual components represented in a fully compositional reservoir model are tracked separately starting from model initialization, one can trace back the source of hydrocarbon production from both gas cap and oil rim.
This approach is implemented through the doubling of the number of components in the equation of state fluid characterization – one set of components for the gas cap, and another set for the oil rim.
In order to track the net utilization of the injected lean gas, additional components are needed – in this case one more component representing the lean gas, as the injected gas is a dry gas.
The results of the comprehensive comparison demonstrate very clearly that these two approaches yield consistent condensate allocation and gas utilization results over the entire life of field (including history match and prediction).
For condensate allocation, the hydrocarbon liquid production split depends on how the injected lean gas is tracked.
For gas utilization, the injected lean gas must be tracked as a distinct component separate from both oil rim and gas cap components.
The comparison also shows that although the tracer-based approach is numerically more efficient with less runtime, the full component tracking approach is simulator agnostic, and therefore can be implemented in any reservoir simulator.
In addition, the full component tracking method can be used for cases where injection gas is a known mixture of oil rim and gas cap gas – something the tracer-based option cannot handle.
In summary, this paper presents a first comprehensive comparison of the two (2) different fluid tracking modeling approaches, with practical recommendations on modeling-based hydrocarbon liquid production and injection gas utilization allocation in cases where the commercial framework makes such allocation necessary.
Related Results
Block 61 Condensate Decline Management Strategy
Block 61 Condensate Decline Management Strategy
Abstract
Block 61 is gas field located in Southwest of Oman and is being operated by BP. Field has been on production under Exploration and Production Sharing Agreem...
Enhanced Gas-Condensate Recovery in Complex Reservoirs: Pilots and Models
Enhanced Gas-Condensate Recovery in Complex Reservoirs: Pilots and Models
Abstract
Gas injection in gas-condensate reservoirs requires reservoir studies with cumbersome and complex simulations of flow and of phase behaviour for multipha...
Boosting Condensate Recoveries of a Mature Retrograde Gas-Condensate Field in Pakistan
Boosting Condensate Recoveries of a Mature Retrograde Gas-Condensate Field in Pakistan
Abstract
One of the most challenging part of managing a Gas-Condensate reservoir is to reduce Condensate Banking and its damaging impacts on the overall recovery. Se...
Gas Utilization – The KOC Approach
Gas Utilization – The KOC Approach
Abstract
Kuwait Oil Company (KOC), an upstream subsidiary of Kuwait Petroleum Corporation (KPC), ranks amongst the major oil companies of the world. However, due to ...
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Source Rocks of the Thamama Hydrocarbon in Abu Dhabi
Abstract
More than 80% of Abu Dhabi oil reserves are accumulated in the Thamama reservoirs. However, its source rock locations, thickness and richness distributions ...
The Different Condensate Gas Recovery Using Gas Oil Permeability and Gas Condensate Permeability Curve
The Different Condensate Gas Recovery Using Gas Oil Permeability and Gas Condensate Permeability Curve
Abstract
Till now, condensate reservoir engineers in China used substitute permeability curve, measured by unsteady-state method using model oil (kerosene etc.) and ...
Colorado Rockies Yield an Intriguing Oil-Ring Accumulation
Colorado Rockies Yield an Intriguing Oil-Ring Accumulation
Abstract
The McCallum Unit anticline, located near Walden in Jackson County, Colo., possesses highly unusual fluid characteristics because the produced gas is 92 per...
A New Method for Predicting the Law of Unsteady Flow Through Porous Medium on Gas Condensate Well
A New Method for Predicting the Law of Unsteady Flow Through Porous Medium on Gas Condensate Well
Abstract
In order to consider the influence of variation of retrograde condensate saturation on well performance during production process in low permeability con...

