Ms paper describes the process of standarzing the Heidrun Sub sea water injection system. The layout, basis of design and equipment utilized are presented, along with exploring the benefits and concerns of adopting a standard sub sea system. Realized by this approach were: the interchangeability of equipment between Heidrun and other licenses, the lowering of development costs, the capturing of key-lemmings and the sharing of resources. By identifying and weighing the benefits versus the concerns, standardization can be successfully utilized between petroleum companies with different project parameters, thus saving significant costs for all parties.
Introduction
There are marry benefits, concerns, and reward associated with standardizing a sub sea system. In the earlier stages of the Heidrun development, several sub sea concepts were evacuated, ranging from individual water injection wells tied back to the Tension Leg Platform (TLP), to multiple-well sub sea templates.
It was recognized that substantial savings and synergies could be achieved if the Heidrun Project chose art economically viable development concept which fit into Statoil's long-term strategy for sub sea developments (being that Statoil would take over operator ship of the Heidrun field at first-oil). After evaluation, it was decided that the Heidrun Sub sea Water injections System would be modeled after Statoil's Stratford Satellite Project (SSP) design.
However, there were problems. Operating parameters specific to Heidrun, would have to be met. Agreements had to be reached on the use of the existing specialized sub sea tools which were not part of the Heidrun partnership. Finally, capturing the knowledge already hard-won by SSP had to be integrated into Heidrun. This paper describes the Heidrun sub sea water injections system specifics, and shows the process of working through concerns and thereby realizing the benefits of standardization.
Heidrun Subsea Water injection System Description
The Heidrun Field is roughly 10 km long and 6 km wide (figure 1). It is situated on the mid-Norwegian Continental Shelf in an area known as Haltenbanken, 175 km from the Norwegian coast in Production Licenses 095 and 124. The field lies pre-dormis within Block 6507/7 with an eastern extension into Block 6507/8, and in water depths ranging from 310 to 348 meters.
The major reservoirs consist of the Fangst Group, the Upper and Lower Elfie, and the Are Formations, all of Jurassic age. During the planning stages, it was recognized that perimeter sub sea water injection wells would be required to reach the water column in some of the existing fault blocks. The option of extended reach wells from the TLP was explored, but was rejected due to technical difficulties and associated costs. Six water injection we] Is were deemed necessary for optimum, initial water injection and were planned to be drilled from two seabed locations.
Title: The Concerns and Benefits of Standardization on the Heidrun Subsea Water Injection System
Description:
Abstract
Ms paper describes the process of standarzing the Heidrun Sub sea water injection system.
The layout, basis of design and equipment utilized are presented, along with exploring the benefits and concerns of adopting a standard sub sea system.
Realized by this approach were: the interchangeability of equipment between Heidrun and other licenses, the lowering of development costs, the capturing of key-lemmings and the sharing of resources.
By identifying and weighing the benefits versus the concerns, standardization can be successfully utilized between petroleum companies with different project parameters, thus saving significant costs for all parties.
Introduction
There are marry benefits, concerns, and reward associated with standardizing a sub sea system.
In the earlier stages of the Heidrun development, several sub sea concepts were evacuated, ranging from individual water injection wells tied back to the Tension Leg Platform (TLP), to multiple-well sub sea templates.
It was recognized that substantial savings and synergies could be achieved if the Heidrun Project chose art economically viable development concept which fit into Statoil's long-term strategy for sub sea developments (being that Statoil would take over operator ship of the Heidrun field at first-oil).
After evaluation, it was decided that the Heidrun Sub sea Water injections System would be modeled after Statoil's Stratford Satellite Project (SSP) design.
However, there were problems.
Operating parameters specific to Heidrun, would have to be met.
Agreements had to be reached on the use of the existing specialized sub sea tools which were not part of the Heidrun partnership.
Finally, capturing the knowledge already hard-won by SSP had to be integrated into Heidrun.
This paper describes the Heidrun sub sea water injections system specifics, and shows the process of working through concerns and thereby realizing the benefits of standardization.
Heidrun Subsea Water injection System Description
The Heidrun Field is roughly 10 km long and 6 km wide (figure 1).
It is situated on the mid-Norwegian Continental Shelf in an area known as Haltenbanken, 175 km from the Norwegian coast in Production Licenses 095 and 124.
The field lies pre-dormis within Block 6507/7 with an eastern extension into Block 6507/8, and in water depths ranging from 310 to 348 meters.
The major reservoirs consist of the Fangst Group, the Upper and Lower Elfie, and the Are Formations, all of Jurassic age.
During the planning stages, it was recognized that perimeter sub sea water injection wells would be required to reach the water column in some of the existing fault blocks.
The option of extended reach wells from the TLP was explored, but was rejected due to technical difficulties and associated costs.
Six water injection we] Is were deemed necessary for optimum, initial water injection and were planned to be drilled from two seabed locations.
Related Results
Overview of Key Zonal Water Injection Technologies in China
Overview of Key Zonal Water Injection Technologies in China
Abstract
Separated layer water injection is the important technology to realize the oilfield long-term high and stable yield. Through continuous researches and te...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Subsea Water Treatment and Injection Station
Subsea Water Treatment and Injection Station
Abstract
Description
Many reservoirs in the UKCS are experiencing rapid pressure drop, reduced production, low recovery rates an...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Abstract
Subsea completions in deep waters are becoming more and more frequent around the world. This entails the use of innovative technology, remote interventio...
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
High Voltage Subsea Pump – A Low Cost Subsea Boosting Enabler
In a cost constrained scenario, technology driven solutions aiming at CAPEX reductions are crucial to make Subsea Processing (SSP) projects economically attractive. Subsea Processi...
Open Source Architectures Development for Subsea Factory
Open Source Architectures Development for Subsea Factory
Abstract
The future application of subsea processing technologies envisages subsea production systems with an increased level of functional complexity because of the...
Deep Water X-mas Tree Standardization -- Interchangeability Approach
Deep Water X-mas Tree Standardization -- Interchangeability Approach
ABSTRACT
Aiming the rationalization of subsea operations to turn the production of oil and gas more economical and reliable, standardization of subsea equipment i...