Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Installing Jackups in Punch-Through-Sensitive Clays

View through CrossRef
ABSTRACT The paper describes some of the problems of installing a jackup adjacent to a fixed platform in an area with difficult geotechnical conditions. An account is presented of the initial problems experienced at a location that resulted in a punchthrough and consequent structural damage to the legs of a modern jackup. The geotechnical conditions and available geotechnical surveys are described as are the subsequent additional geotechnical surveys required to identify whether a similar jackup could be safely re-instated at the location. The analyses indicated that geotechnical remediation would be required and the adopted method of ‘swiss-cheesing’ is discussed. Comments are made on the subsequent successful installation and eventual removal of the second jackup. The paper is directed towards owners and operators wishing to install jackups at locations where punch-through sensitive clays are present. It provides conclusions on the requirements from geotechnical surveys at such locations and on the benefits and implications of undertaking geotechnical remedial programs. Punch-through represents a major risk in the operations of jackup platforms in certain geotechnical conditions and the avoidance of such risks by the techniques described has a considerable economic value. SUMMARY AND INTRODUCTION In August 2004 a new jackup was installed at the Belida B wellhead platform (WHP) offshore Indonesia in the Natuna Sea in order to drill over a conventional steel jacket. The water depth at the location was 249ft (75.9m). The jackup was positioned on the south face of the jacket with a heading of 210 degrees. The unit was successfully located in the desired position (despite some sliding problems encountered due to spudcan craters left by a previous unit) and elevated out of the water in order to apply full preload. The preload had been held for just over 2.3 hours when additional penetration of the starboard leg was observed. Despite attempts to maintain the unit in a level condition the situation grew rapidly worse and the hull swayed and yawed to starboard until it stabilized in an afloat condition with its legs broken just below the hull. The unit was successfully removed for repairs. The legs which had broken off and were embedded in the seabed were then recovered by a floating sheer-leg crane. The operators of the field were anxious to complete their drilling program and during the following year arrangements were made to examine whether a jack-up could be safely installed at the same location. The jackup selected was of the same design as that which had been damaged during the earlier installation attempt. New geotechnical survey data was obtained from the disturbed soil locations where the legs had been removed and this indicated that the risk of a punchthrough was still present. Means of remediating the seabed were examined and as a result of these studies it was decided that a process known as ‘swiss-cheesing’ should be adopted in order to ensure that the jackup spudcans would be driven safely through the layer of stiff material found to be overlying a weaker layer..
Title: Installing Jackups in Punch-Through-Sensitive Clays
Description:
ABSTRACT The paper describes some of the problems of installing a jackup adjacent to a fixed platform in an area with difficult geotechnical conditions.
An account is presented of the initial problems experienced at a location that resulted in a punchthrough and consequent structural damage to the legs of a modern jackup.
The geotechnical conditions and available geotechnical surveys are described as are the subsequent additional geotechnical surveys required to identify whether a similar jackup could be safely re-instated at the location.
The analyses indicated that geotechnical remediation would be required and the adopted method of ‘swiss-cheesing’ is discussed.
Comments are made on the subsequent successful installation and eventual removal of the second jackup.
The paper is directed towards owners and operators wishing to install jackups at locations where punch-through sensitive clays are present.
It provides conclusions on the requirements from geotechnical surveys at such locations and on the benefits and implications of undertaking geotechnical remedial programs.
Punch-through represents a major risk in the operations of jackup platforms in certain geotechnical conditions and the avoidance of such risks by the techniques described has a considerable economic value.
SUMMARY AND INTRODUCTION In August 2004 a new jackup was installed at the Belida B wellhead platform (WHP) offshore Indonesia in the Natuna Sea in order to drill over a conventional steel jacket.
The water depth at the location was 249ft (75.
9m).
The jackup was positioned on the south face of the jacket with a heading of 210 degrees.
The unit was successfully located in the desired position (despite some sliding problems encountered due to spudcan craters left by a previous unit) and elevated out of the water in order to apply full preload.
The preload had been held for just over 2.
3 hours when additional penetration of the starboard leg was observed.
Despite attempts to maintain the unit in a level condition the situation grew rapidly worse and the hull swayed and yawed to starboard until it stabilized in an afloat condition with its legs broken just below the hull.
The unit was successfully removed for repairs.
The legs which had broken off and were embedded in the seabed were then recovered by a floating sheer-leg crane.
The operators of the field were anxious to complete their drilling program and during the following year arrangements were made to examine whether a jack-up could be safely installed at the same location.
The jackup selected was of the same design as that which had been damaged during the earlier installation attempt.
New geotechnical survey data was obtained from the disturbed soil locations where the legs had been removed and this indicated that the risk of a punchthrough was still present.
Means of remediating the seabed were examined and as a result of these studies it was decided that a process known as ‘swiss-cheesing’ should be adopted in order to ensure that the jackup spudcans would be driven safely through the layer of stiff material found to be overlying a weaker layer.

Related Results

Natural Antibacterial Clays: Historical Uses and Modern Advances
Natural Antibacterial Clays: Historical Uses and Modern Advances
AbstractAntibacterial clays in nature include a variety of clay mineral assemblages that are capable of killing certain human pathogens. Although clays have been used for medicinal...
The influence of depositional conditions on the crystallo-chemical characteristics of Paleogene glauconites of Iraq
The influence of depositional conditions on the crystallo-chemical characteristics of Paleogene glauconites of Iraq
Glauconites are abundant in Paleocene Alaji Formation and Eocene Jaddala Formation.  This study highlights the influence of depositional conditions on mineralogical and ch...
Punch-Through Encountered in India and Indonesia
Punch-Through Encountered in India and Indonesia
ABSTRACT Punch-through were encountered by 2 three -leg type jack-up rigs, "Hakuryu 9" and "Hakuryu 7", in the Bay of Bengal and at Offshore North Sumatra, respec...
The influence of intense fissuring on the mechanical behaviour of clays
The influence of intense fissuring on the mechanical behaviour of clays
The paper discusses the geological history, intrinsic properties, structural features and mechanical behaviour of three differently fissured clays outcropping within the Apennine c...
A Study on the Difference in Aging Characteristics of Sensitive and Non‐Sensitive Skin
A Study on the Difference in Aging Characteristics of Sensitive and Non‐Sensitive Skin
ABSTRACTBackgroundAccording to Euromonitor and T Mall data statistics from 2017 to 2022, the Chinese market for sensitive skin (SS) skincare is growing by 20% every year, and anti‐...
Geomimicry: harnessing the antibacterial action of clays
Geomimicry: harnessing the antibacterial action of clays
AbstractA decade of research on clays that kill human pathogens, including antibiotic-resistant strains such as methicillin-resistant S. aureus (MRSA), has documented their common ...
The Characterization Of Clays From Latuhalat Village Activated Using Ammonium Nitrate
The Characterization Of Clays From Latuhalat Village Activated Using Ammonium Nitrate
Research on characterization clays from Latuhalat village before and after the activation using ammonium nitrate has been carried out. The brick was grinded, washed with aquadest a...
Rodnoosjetljiv jezik na primjeru njemačkih časopisa Brigitte i Der Spiegel
Rodnoosjetljiv jezik na primjeru njemačkih časopisa Brigitte i Der Spiegel
On the basis of the comparative analysis of texts of the German biweekly magazine Brigitte and the weekly magazine Der Spiegel and under the presumption that gender-sensitive langu...

Back to Top