Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
View through CrossRef
There are many advantages of reasonably determining the affected zone and its construction sequence for the multiline parallel pipe-jacking construction, such as convenient to reasonably arrange the pipeline section distribution mode, reducing the construction safety risk, and construction difficulty. Combined with the engineering construction practice of the multiline parallel pipe-jacking project for the north city drainage and flood control project through Chu River in Hefei, the strength reduction method has been utilized to study the surrounding stratum FOS for the pipe-jacking construction unloading under different overburden thickness Hs, different clear distance D, and different river water depth
H
w
in this paper. The formula of the minimum critical overburden thickness Hsmin and the minimum critical clear distance Dmin of the surrounding stratum self-stability during pipe-jacking construction unloading have been derived. The division method of the affected zone for the multiline parallel river-crossing pipe-jacking construction which behaves as the mutual influence nonself-stability zone, the mutual influence self-stability zone, and the no mutual influence self-stability zone has been proposed. For further discussion, the construction sequence of the multiline parallel river-crossing pipe jacking has been studied.
Title: Study on the Division of the Affected Zone under Construction Unloading and Its Construction Sequence of the Multiline Parallel River-Crossing Pipe Jacking
Description:
There are many advantages of reasonably determining the affected zone and its construction sequence for the multiline parallel pipe-jacking construction, such as convenient to reasonably arrange the pipeline section distribution mode, reducing the construction safety risk, and construction difficulty.
Combined with the engineering construction practice of the multiline parallel pipe-jacking project for the north city drainage and flood control project through Chu River in Hefei, the strength reduction method has been utilized to study the surrounding stratum FOS for the pipe-jacking construction unloading under different overburden thickness Hs, different clear distance D, and different river water depth
H
w
in this paper.
The formula of the minimum critical overburden thickness Hsmin and the minimum critical clear distance Dmin of the surrounding stratum self-stability during pipe-jacking construction unloading have been derived.
The division method of the affected zone for the multiline parallel river-crossing pipe-jacking construction which behaves as the mutual influence nonself-stability zone, the mutual influence self-stability zone, and the no mutual influence self-stability zone has been proposed.
For further discussion, the construction sequence of the multiline parallel river-crossing pipe jacking has been studied.
Related Results
Field Test and Numerical Simulation of Jacking Force of Reinforced Concrete Pipe Jacking in Long Distance Composite Formation
Field Test and Numerical Simulation of Jacking Force of Reinforced Concrete Pipe Jacking in Long Distance Composite Formation
Jacking force is one of the important parameters of pipe jacking construction. In order to analyze the mechanical properties of large-diameter reinforced concrete pipe jacking cons...
The Jacking System and Simulator for Mating the Hutton TLP
The Jacking System and Simulator for Mating the Hutton TLP
ABSTRACT
The Hutton TLP Deck/ Hull mating and weldout operation required the use of a sophisticated and unique hydraulic jacking system. The system was designed t...
Optimized Design of Pipe-in-Pipe Systems
Optimized Design of Pipe-in-Pipe Systems
Abstract
Deepwater subsea developments must address the flow assurance issues and increasingly these are forming a more critical part of the design. Pipe-in-pipe ...
Study on the Mechanical Properties of Large Rectangular and Shallow Embedded Pipe-Jacking During Pushing-Process
Study on the Mechanical Properties of Large Rectangular and Shallow Embedded Pipe-Jacking During Pushing-Process
Abstract
With the continuous increase of urban population, the development degree of urban underground space is increasing, and the pipe jacking method has been wide...
Effect of Undercrossing Shield Tunnels Excavation on Existing Rectangular Pipe-Jacking Tunnels
Effect of Undercrossing Shield Tunnels Excavation on Existing Rectangular Pipe-Jacking Tunnels
Shield tunneling underneath existing rectangular pipe jacking can often lead to uneven settling. To solve the problem of excessive deformation of the existing underground pedestria...
Study on the Influence of Excavation Unloading on Pile Depth in Sandy Soil
Study on the Influence of Excavation Unloading on Pile Depth in Sandy Soil
With the development of urban construction, uplift pile has been widely used in underground structure bearing buoyancy. The pile is buried deep underground, and the foundation pit ...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...
Pipe-in-Pipe Swaged Field Joint for Reel Lay
Pipe-in-Pipe Swaged Field Joint for Reel Lay
Abstract
Subsea 7 and ITP InTerPipe (ITP) have developed a highly efficient Pipe in Pipe technology to be installed by the Reel-Lay method. This solution is based...