Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Variasi Sistem Pembayaran Terhadap Cash Flow (Studi Kasus : Pembangunan Laboratorium Terpadu AKN Blitar)

View through CrossRef
Construction projects are a form of long-term investment that requires large capital. One important aspect in construction projects is the payment system. Therefore, it is necessary to vary the payment system on the cash flow of construction projects to determine the effect of the payment variation system on the safest cash flow for the contractor. In this research, the case study used for the calculation of payment system variations on cash flow is the AKN Putra Sang Fajar Blitar integrated laboratory construction project. The payment system used is the progress term payment system. The method used to obtain these results is done by varying the down payment and work progress. There are 6 variations (V) used, namely V1 down payment (0%) work progress 20%, V2 down payment (0%) work progress 25%, V3 down payment 10% work progress 10%, V4 down payment 10% work progress 25%, V5 down payment 20% work progress 20%, V6 down payment 20% work progress 25%. From the results that have been obtained, the highest peak overdraft is in V2 amounting to -Rp5,365,573,659.76 and the lowest is in V3 amounting to -Rp2,864,421,825.56. Meanwhile, the final overdraft value is the same in each variation, which is Rp824,863,740.58. Therefore, the safest variation is V3 with the lowest peak overdraft. The effect of the variation of the payment system that has been known is that the greater the down payment in each variation, the lower the peak overdraft, as well as the smaller the work progress term, the lower the peak overdraft.
Title: Variasi Sistem Pembayaran Terhadap Cash Flow (Studi Kasus : Pembangunan Laboratorium Terpadu AKN Blitar)
Description:
Construction projects are a form of long-term investment that requires large capital.
One important aspect in construction projects is the payment system.
Therefore, it is necessary to vary the payment system on the cash flow of construction projects to determine the effect of the payment variation system on the safest cash flow for the contractor.
In this research, the case study used for the calculation of payment system variations on cash flow is the AKN Putra Sang Fajar Blitar integrated laboratory construction project.
The payment system used is the progress term payment system.
The method used to obtain these results is done by varying the down payment and work progress.
There are 6 variations (V) used, namely V1 down payment (0%) work progress 20%, V2 down payment (0%) work progress 25%, V3 down payment 10% work progress 10%, V4 down payment 10% work progress 25%, V5 down payment 20% work progress 20%, V6 down payment 20% work progress 25%.
From the results that have been obtained, the highest peak overdraft is in V2 amounting to -Rp5,365,573,659.
76 and the lowest is in V3 amounting to -Rp2,864,421,825.
56.
Meanwhile, the final overdraft value is the same in each variation, which is Rp824,863,740.
58.
Therefore, the safest variation is V3 with the lowest peak overdraft.
The effect of the variation of the payment system that has been known is that the greater the down payment in each variation, the lower the peak overdraft, as well as the smaller the work progress term, the lower the peak overdraft.

Related Results

Cash‐based approaches in humanitarian emergencies: a systematic review
Cash‐based approaches in humanitarian emergencies: a systematic review
This Campbell systematic review examines the effectiveness, efficiency and implementation of cash transfers in humanitarian settings. The review summarises evidence from five studi...
Pengaruh Arus Kas Investasi, Arus Kas Pendanaan, Arus Kas Operasi dan Laba Bersih terhadap Dividen Kas pada Perusahaan Properti
Pengaruh Arus Kas Investasi, Arus Kas Pendanaan, Arus Kas Operasi dan Laba Bersih terhadap Dividen Kas pada Perusahaan Properti
This study aims to determine the effect of investment cash flow, funding cash flow, operating cash flow, and net income on cash dividends in property companies listed on the Indone...
COEFFICIENT ANALYSIS OF CASH FLOWS OF THE ENTERPRISE
COEFFICIENT ANALYSIS OF CASH FLOWS OF THE ENTERPRISE
Introduction. Cash flow analysis is a necessary prerequisite for their effective management to accelerate the turnover of assets and capital and ensure financial stability and solv...
Nexus free cash flow dan kebijakan dividen
Nexus free cash flow dan kebijakan dividen
<p>Kebijakan dividen dan determinannya tetap menjadi isu kontroversial dalam literatur keuangan. Tujuan studi ini untuk menguji pengaruh langsung <em>free cash flow<...
Analisis Pengelolaan Arsip Dinamis pada Akademi Komunitas Negeri Putra Sang Fajar Blitar
Analisis Pengelolaan Arsip Dinamis pada Akademi Komunitas Negeri Putra Sang Fajar Blitar
Archive management plays a crucial role in supporting the smooth administration and accountability of an institution, including Akademi Komunitas Negeri (AKN) Putra Sang Fajar Blit...
PEMANFAATAN LABORATORIUM IPS SMP
PEMANFAATAN LABORATORIUM IPS SMP
Penelitian ini bertujuan mengetahui pemanfaatan laboratorium IPS di SMP. Pemanfaatan laboratorium dalam penelitian ini ditinjau dari; 1) kondisi laboratorium IPS di SMP, 2) manajem...

Back to Top