Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analysis and Application of Vibration Damping Hole in Tunnel Working Face Based on Grey Correlation Analysis

View through CrossRef
In the process of tunnel blasting construction, certain vibration hazards will be caused to adjacent buildings. Therefore, it is necessary to explore feasible vibration reduction measures in the construction process. Combined with field measurement and numerical calculation, the law of vibration reduction effect of vibration reduction holes in the blasting construction of subway tunnels is analyzed. The gray correlation theory is used to determine the influence degree of vibration reduction hole parameters on the vibration reduction effect; each parameter is clarified, and the primary and secondary relationship of each parameter in the vibration reduction effect is clarified. Among them, the effect of damping hole spacing is particularly obvious. Combined with numerical calculation and comprehensive analysis of on-site construction effects, it is found that during the construction process, the distance between the vibration damping holes is 120 mm, the distance between the vibration damping holes and the explosion source is 2000 mm, the diameter of the vibration damping holes is more than 120 mm, the depth of the vibration damping holes is 1200–1500 mm, and double-row vibration-damping hole spacing is 50–100 mm, which can achieve a better vibration-damping effect. The research results will provide a reference vibration reduction technology for the blasting construction of urban shallow tunnels and have certain reference value and guiding significance for the blasting scheme design and vibration control of similar projects.
Title: Analysis and Application of Vibration Damping Hole in Tunnel Working Face Based on Grey Correlation Analysis
Description:
In the process of tunnel blasting construction, certain vibration hazards will be caused to adjacent buildings.
Therefore, it is necessary to explore feasible vibration reduction measures in the construction process.
Combined with field measurement and numerical calculation, the law of vibration reduction effect of vibration reduction holes in the blasting construction of subway tunnels is analyzed.
The gray correlation theory is used to determine the influence degree of vibration reduction hole parameters on the vibration reduction effect; each parameter is clarified, and the primary and secondary relationship of each parameter in the vibration reduction effect is clarified.
Among them, the effect of damping hole spacing is particularly obvious.
Combined with numerical calculation and comprehensive analysis of on-site construction effects, it is found that during the construction process, the distance between the vibration damping holes is 120 mm, the distance between the vibration damping holes and the explosion source is 2000 mm, the diameter of the vibration damping holes is more than 120 mm, the depth of the vibration damping holes is 1200–1500 mm, and double-row vibration-damping hole spacing is 50–100 mm, which can achieve a better vibration-damping effect.
The research results will provide a reference vibration reduction technology for the blasting construction of urban shallow tunnels and have certain reference value and guiding significance for the blasting scheme design and vibration control of similar projects.

Related Results

Everyday Life in the "Tourist Zone"
Everyday Life in the "Tourist Zone"
This article makes a case for the everyday while on tour and argues that the ability to continue with everyday routines and social relationships, while at the same time moving thro...
Damping Of Moored Floating Structures
Damping Of Moored Floating Structures
1.ABSTRACT The resonant response of moored floating structures due to low-frequency excitation is controlled primarily by the effective damping coefficient of the...
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Construction time of secondary lining of ultra-small spacing parallel overlapping tunnel
Abstract Due to the unique spatial structure, stress transfer mechanism, and construction disturbance characteristics of ultra-small spacing parallel overlapping tu...
Grey relations
Grey relations
PurposeThe goal of this article is to introduce the notion of a grey relation between grey sets using grey numbers.Design/methodology/approachThis study uses the grey number to cre...
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Comparison of prevalence of symptoms of carpal tunnel syndrome between dental students and dental practitioners - A cross-sectional study
Background: carpal tunnel syndrome (CTS) arises from compression of the median nerve when it passes through the carpal tunnel in the wrist. Dental professionals use vibratory instr...
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
Safety assessment of the construction of double track tunnels underneah exsiting railway tunnels
The ground disturbance caused by the tunnel construction will inevitably have an impact on the upper part of the constructed tunnel structure, and the railroad tunnel requires a ve...
Damping Measurements On An Offshore Platform
Damping Measurements On An Offshore Platform
ABSTRACT Ambient and forced vibration tests were recently conducted on an offshore steel template platform in the Ekofisk complex of the North Sea. Valuable infor...
Blades condition monitoring using shaft torsional vibration signals
Blades condition monitoring using shaft torsional vibration signals
PurposeThe purpose of this paper is to validate mathematically the feasibility of extracting the rotating blades vibration condition from the shaft torsional vibration measurement....

Back to Top