Study on the Operating Strategy Optimization of Moving to Remote Shutdown Station When Main Control Room Is Un-Inhabitable
View through CrossRef
For PWR, remote shutdown station (RSS) is a redundant control mean to shut down the reactor when main control room (MCR) inhabitation is challenged (e.g. fire, smoke...). Nowadays, due to nuclear power plants control measures were improved with DCS system, a full function DCS RSS was equipped and more essential equipment could be controlled on RSS.
Under operating conditions that prohibit nuclear power plant operators to stay in the main control room, the operators should move to RSS and shutdown the reactor to ensure plant safety following <Moving to remote shutdown station when main control room is un-inhabitable operating strategy> (RSS strategy for short) to fallback the plant from power operation to cold shutdown. The original operating strategy by nature circulation is no longer the best choice both for operation safety and economy efficiency, and an optimized new strategy should be raised.
Based on the former reason, an optimized operation strategy was raised in this paper. In the optimized strategy, all plant normal standard operation modes were considered as initial conditions, rather than only considering power operation condition in the original one. The fallback mode and fallback strategy for each initial condition was also designed and optimized. To accelerate the depression and heat removal process, a forced circulation operation strategy is adopted when the reactor coolant pumps are available, and less local operation was included by taking advantages of the full function operating measures on RSS. To simplify the whole procedure structure, the operation modules of other general operating procedures are reused.
To validate the effectiveness of the optimized operating strategy, a full scope PWR simulation tool was employed to make thermo hydraulic calculation validation of the reactor response and also the remote control station HMI supporting validation. By simulating the original strategy and the optimized one and related analysis, we found that the optimized strategy is effective, and able to be executed based on the remote control station hardware. By executing the optimized strategy, the unit can fall back to the cold shutdown condition safely and a few hours were saved compared with the original strategy. The optimized strategy had already been implemented on real PWR nuclear power plant.
American Society of Mechanical Engineers
Title: Study on the Operating Strategy Optimization of Moving to Remote Shutdown Station When Main Control Room Is Un-Inhabitable
Description:
For PWR, remote shutdown station (RSS) is a redundant control mean to shut down the reactor when main control room (MCR) inhabitation is challenged (e.
g.
fire, smoke.
).
Nowadays, due to nuclear power plants control measures were improved with DCS system, a full function DCS RSS was equipped and more essential equipment could be controlled on RSS.
Under operating conditions that prohibit nuclear power plant operators to stay in the main control room, the operators should move to RSS and shutdown the reactor to ensure plant safety following <Moving to remote shutdown station when main control room is un-inhabitable operating strategy> (RSS strategy for short) to fallback the plant from power operation to cold shutdown.
The original operating strategy by nature circulation is no longer the best choice both for operation safety and economy efficiency, and an optimized new strategy should be raised.
Based on the former reason, an optimized operation strategy was raised in this paper.
In the optimized strategy, all plant normal standard operation modes were considered as initial conditions, rather than only considering power operation condition in the original one.
The fallback mode and fallback strategy for each initial condition was also designed and optimized.
To accelerate the depression and heat removal process, a forced circulation operation strategy is adopted when the reactor coolant pumps are available, and less local operation was included by taking advantages of the full function operating measures on RSS.
To simplify the whole procedure structure, the operation modules of other general operating procedures are reused.
To validate the effectiveness of the optimized operating strategy, a full scope PWR simulation tool was employed to make thermo hydraulic calculation validation of the reactor response and also the remote control station HMI supporting validation.
By simulating the original strategy and the optimized one and related analysis, we found that the optimized strategy is effective, and able to be executed based on the remote control station hardware.
By executing the optimized strategy, the unit can fall back to the cold shutdown condition safely and a few hours were saved compared with the original strategy.
The optimized strategy had already been implemented on real PWR nuclear power plant.
Related Results
Challenges in Execution of Brownfield Projects Without Production Shutdown – Case Study
Challenges in Execution of Brownfield Projects Without Production Shutdown – Case Study
Abstract
Oil producing companies are targeting minimal modifications to existing facilities in an attempt to increase oil production with minimal capital investment ...
Optimizing shutdown and startup procedures in oil facilities: A strategic review of industry best practices
Optimizing shutdown and startup procedures in oil facilities: A strategic review of industry best practices
Shutdown and startup procedures in oil facilities are critical processes that significantly impact operational efficiency, safety, and environmental compliance. This strategic revi...
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Nonlinear optimal control for robotic exoskeletons with electropneumatic actuators
Purpose
To provide high torques needed to move a robot’s links, electric actuators are followed by a transmission system with a high transmission rate. For instance, gear ratios of...
A STUDY ON LOGISTIC SETUP CHALLENGES DURING A SCHEDULE OFFSHORE PLATFORM SHUTDOWN IN PETRONAS CARIGALI KERTEH, TERENGGANU
A STUDY ON LOGISTIC SETUP CHALLENGES DURING A SCHEDULE OFFSHORE PLATFORM SHUTDOWN IN PETRONAS CARIGALI KERTEH, TERENGGANU
Plant turnaround shutdown is a fundamental asset management in capital intensive process-based industries. Offshore platform is like a ‘town’ in the middle of the sea with a fa...
Analysis of the Response Law of Station Buried Depth Change to Subway Station Under Vibration Load
Analysis of the Response Law of Station Buried Depth Change to Subway Station Under Vibration Load
In the period of rapid development of urban rail transit, the traditional transportation hub has become increasingly unable to meet the needs of people 's travel due to the lack of...
Ensuring Safety through Flexibility Enhancement of Amine Unit Operation
Ensuring Safety through Flexibility Enhancement of Amine Unit Operation
Abstract
Limitations in Amine storage capacities at one of GASCO's Plants necessitates the use of temporary ISO-Storage containers to store surplus Amine during Plan...
HUBUNGAN KETEPATAN ESTIMASI DURASI OPERASI DENGAN UTILISASI KAMAR OPERASI ELEKTIF DI INSTALASI BEDAH SENTRAL RSUD Dr. SAIFUL ANWARMALANG
HUBUNGAN KETEPATAN ESTIMASI DURASI OPERASI DENGAN UTILISASI KAMAR OPERASI ELEKTIF DI INSTALASI BEDAH SENTRAL RSUD Dr. SAIFUL ANWARMALANG
The operating room is a vital service in hospitals. The quality of service from theoperating room can be assessed from one indicator, namely operating room utilization.Utilization ...
Abstract 1296: Vascular shutdown anti-tumor effect of tetra-arsenic oxide on cervical cancer cells
Abstract 1296: Vascular shutdown anti-tumor effect of tetra-arsenic oxide on cervical cancer cells
Abstract
Background: Tetra arsenic oxide (As4O6) is a novel arsenic compound that exhibits potent anti-vascular activity and significantly suppresses solid tumor gro...