Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ

View through CrossRef
Abstract. In addition to providing benefits, marine mining activities can have a negative impact on the marine environment, causing various changes to the marine environment. One of the efforts to minimize the resulting changes is the mining Backfilling method, which is the direct closure of ex-mining holes from which ore reserves have been taken in stages. In this research, a study on reclamation planning and reclamation costs was carried out in the Sangau B.3 Block with an area of 213.59 Ha. The technical planning includes studies on the manufacture and installation of FADs and the transplantation of artificial coral reefs, maintenance and monitoring of sea water quality. The reclamation will be carried out by PT XYZ with a processing time of 2,266.43 hours / 284 days with 8 hours of work per day. The cost calculation includes direct and indirect cost components, direct costs include FAD costs, artificial coral reef transplant costs, maintenance costs and seawater quality monitoring costs, while indirect costs include equipment mobility costs, reclamation planning costs, third party costs, and supervision costs. Based on calculations, the direct cost of the reclamation plan for the Sangau B.3 Block area from 2023-2026 is Rp. 12,354,487,782 with an indirect cost of Rp. 5,588,398,553. So that the total cost of the planned reclamation activities is IDR 18,182,204,687. Abstrak. Selain memberikan manfaat, aktifitas penambangan laut dapat memberikan dampak negatif terhadap lingkungan laut, menimbulkan berbagai macam perubahan bagi lingkungan laut. Salah satu upaya untuk meminimalisir perubahan yang ditimbukan, dilakukan metode penambangan Backfilling yang merupakan penutupan langsung pada lubang bekas tambang yang sudah diambil cadangan bijihnya dengan cara bertahap. Pada penelitian ini dilakukan kajian perencanaan reklamasi dan perhitungan biaya reklamasi pada Blok Sangau B.3 dengan luasan 213,59 Ha. Perencanaan teknis meliputi kajian pembuatan dan pemasangan rumpon serta transplantasi terumbu karang buatan, pemeliharaan dan pemantauan kualitas air laut. Pelaksanaan reklamasi akan dilakukan oleh PT XYZ dengan lama waktu pengerjaan 2.266,43 jam / 284 hari dengan pengerjaan perhari 8 jam. Pada perhitungan biaya meliputi komponen biaya langsung dan biaya tidak langsung, biaya langsung mencakup biaya rumpon, biaya transplantasi terumbu karang buatan, biaya pemeliharaan dan biaya pemantauan kualitas air laut, sedangkan biaya tidak langsung meliputi biaya mobilitas alat, biaya perencanaan reklamasi, biaya pihak ketiga, dan biaya supervisi. Berdasarkan perhitungan didapatkan biaya langsung rencana reklamasi untuk area Blok Sangau B.3 dari tahun 2023-2026 yaitu sebesar Rp 12.354.487.782 dengan biaya tidak langsung sebesar Rp 5.588.398.553. Sehingga total biaya dari rencana kegiatan reklamasi sebesar Rp 18.182.204.687.
Title: Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Description:
Abstract.
In addition to providing benefits, marine mining activities can have a negative impact on the marine environment, causing various changes to the marine environment.
One of the efforts to minimize the resulting changes is the mining Backfilling method, which is the direct closure of ex-mining holes from which ore reserves have been taken in stages.
In this research, a study on reclamation planning and reclamation costs was carried out in the Sangau B.
3 Block with an area of 213.
59 Ha.
The technical planning includes studies on the manufacture and installation of FADs and the transplantation of artificial coral reefs, maintenance and monitoring of sea water quality.
The reclamation will be carried out by PT XYZ with a processing time of 2,266.
43 hours / 284 days with 8 hours of work per day.
The cost calculation includes direct and indirect cost components, direct costs include FAD costs, artificial coral reef transplant costs, maintenance costs and seawater quality monitoring costs, while indirect costs include equipment mobility costs, reclamation planning costs, third party costs, and supervision costs.
Based on calculations, the direct cost of the reclamation plan for the Sangau B.
3 Block area from 2023-2026 is Rp.
12,354,487,782 with an indirect cost of Rp.
5,588,398,553.
So that the total cost of the planned reclamation activities is IDR 18,182,204,687.
Abstrak.
Selain memberikan manfaat, aktifitas penambangan laut dapat memberikan dampak negatif terhadap lingkungan laut, menimbulkan berbagai macam perubahan bagi lingkungan laut.
Salah satu upaya untuk meminimalisir perubahan yang ditimbukan, dilakukan metode penambangan Backfilling yang merupakan penutupan langsung pada lubang bekas tambang yang sudah diambil cadangan bijihnya dengan cara bertahap.
Pada penelitian ini dilakukan kajian perencanaan reklamasi dan perhitungan biaya reklamasi pada Blok Sangau B.
3 dengan luasan 213,59 Ha.
Perencanaan teknis meliputi kajian pembuatan dan pemasangan rumpon serta transplantasi terumbu karang buatan, pemeliharaan dan pemantauan kualitas air laut.
Pelaksanaan reklamasi akan dilakukan oleh PT XYZ dengan lama waktu pengerjaan 2.
266,43 jam / 284 hari dengan pengerjaan perhari 8 jam.
Pada perhitungan biaya meliputi komponen biaya langsung dan biaya tidak langsung, biaya langsung mencakup biaya rumpon, biaya transplantasi terumbu karang buatan, biaya pemeliharaan dan biaya pemantauan kualitas air laut, sedangkan biaya tidak langsung meliputi biaya mobilitas alat, biaya perencanaan reklamasi, biaya pihak ketiga, dan biaya supervisi.
Berdasarkan perhitungan didapatkan biaya langsung rencana reklamasi untuk area Blok Sangau B.
3 dari tahun 2023-2026 yaitu sebesar Rp 12.
354.
487.
782 dengan biaya tidak langsung sebesar Rp 5.
588.
398.
553.
Sehingga total biaya dari rencana kegiatan reklamasi sebesar Rp 18.
182.
204.
687.

Related Results

Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Evaluasi Rencana Biaya Reklamasi Dan Revegetasi Di Pt. Internasional Prima Coal
Berdasarkan Kepmen ESDM No. 1827 K/30/MEM/2018 setiap pemegang IUP Operasi Produksi wajib menyampaikan dokumen rencana reklamasi dan jaminan reklamasi sebelum memulai kegiatan oper...
Rencana Teknis dan Ekonomis Reklamasi Tambang di PT. X Baleendah
Rencana Teknis dan Ekonomis Reklamasi Tambang di PT. X Baleendah
Abstract. Mining activities are closely related to environmental changes. Mining activities can also have an impact on the social and economic sphere of the local area. So mining c...
Kemampuan Adaptasi Tanaman Nenas Badau Pada Lahan Pasca Tambang Timah Kabupaten Belitung
Kemampuan Adaptasi Tanaman Nenas Badau Pada Lahan Pasca Tambang Timah Kabupaten Belitung
Lahan pasca tambang timah merupakan lahan kritis yang berpotensi sebagai lahan pertanian.  Nenas Badau adalah salah satu jenis tanaman yang dapat dibudidayakan pada lahan pasca tam...
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Rencana Teknis dan Ekonomis Reklamasi PT Tonia Mitra Sejahtera Site Lengora Pantai
Abstract. Environmental impacts that can occur such as decreased soil productivity, soil compaction, the possibility of erosion, unstable soil movement, disruption of flora and fau...
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Rencana Teknis dan Biaya Reklamasi Periode Kedua Tambang Batuan Andesit
Abstract. The andesite rocks in this study come from the PT. Sofa Nugraha mine located in Parung Panjang District, Bogor Regency, West Java Province. The purpose of this research i...

Back to Top