Monitoring Campaign on Sub-Sea Installation
View through CrossRef
The Deepwater Construction Vessel (DCV) Balder performed an one-and-half year deep water construction project in west Africa. The project started in 2010 and consists of multiple oil fields located in water depths ranging from 1800m to 2100m. Heerema Marine Contractors (the Contractor) has successfully installed a large number of sub-sea structures, flow lines and Risers. Installation procedures were optimized, new deck equipment has been installed and passive heave compensation is designed. These measures enabled the crew to achieve an excellent performance in the swell dominated seas West of Africa. To accurately capture the experiences with the new equipment and procedures, an extensive Offshore Monitoring Campaign (OMC) was performed.
To achieve this goal three areas of interest were identified:
• Lowering structures to the seabed at deepwater
• Offloading of barges alongside the DCV Balder
• Motion behavior of DCV Balder in swell environment
The objectives of the monitoring campaign were:
• Validation of the models and performance of the equipment
• Verification of the operability limits for different installation activities
• Transfer of knowledge between engineering and operations
The paper describes how the Contractor executed the different measurements and how the results from the measurements were fed back into the execution of the project. The challenges which were faced to obtain high quality measurement data will be dealt with. Finally it shows the benefits of performing full-scale measurement to engineer safe and efficient deep water operations.
American Society of Mechanical Engineers
Title: Monitoring Campaign on Sub-Sea Installation
Description:
The Deepwater Construction Vessel (DCV) Balder performed an one-and-half year deep water construction project in west Africa.
The project started in 2010 and consists of multiple oil fields located in water depths ranging from 1800m to 2100m.
Heerema Marine Contractors (the Contractor) has successfully installed a large number of sub-sea structures, flow lines and Risers.
Installation procedures were optimized, new deck equipment has been installed and passive heave compensation is designed.
These measures enabled the crew to achieve an excellent performance in the swell dominated seas West of Africa.
To accurately capture the experiences with the new equipment and procedures, an extensive Offshore Monitoring Campaign (OMC) was performed.
To achieve this goal three areas of interest were identified:
• Lowering structures to the seabed at deepwater
• Offloading of barges alongside the DCV Balder
• Motion behavior of DCV Balder in swell environment
The objectives of the monitoring campaign were:
• Validation of the models and performance of the equipment
• Verification of the operability limits for different installation activities
• Transfer of knowledge between engineering and operations
The paper describes how the Contractor executed the different measurements and how the results from the measurements were fed back into the execution of the project.
The challenges which were faced to obtain high quality measurement data will be dealt with.
Finally it shows the benefits of performing full-scale measurement to engineer safe and efficient deep water operations.
Related Results
SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract
During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract
The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...
Independence Installation
Independence Installation
Abstract
This Session paper will review the planning, preparation, and execution of the installation of the Independence Hub facility in Mississippi Canyon Block ...
Seasonal Arctic sea ice predictability and prediction
Seasonal Arctic sea ice predictability and prediction
Arctic sea ice plays a central role in the Earth’s climate. Changes in the sea ice on seasonal-to-interannual timescales impact ecosystems, populations and a growing number of stak...
Sensitivity of modeled atmospheric nitrogen species and nitrogen deposition to variations in sea salt emissions in the North Sea and Baltic Sea regions
Sensitivity of modeled atmospheric nitrogen species and nitrogen deposition to variations in sea salt emissions in the North Sea and Baltic Sea regions
Abstract. Coarse sea salt particles are emitted ubiquitously from the ocean surface by wave-breaking and bubble-bursting processes. These particles impact the atmospheric chemistry...
Sea Level Rise
Sea Level Rise
Sea level is the height of the sea surface expressed either in a geocentric reference frame (absolute sea level) or with respect to the moving Earth’s crust (relative sea level). A...
Challenges of TLP Installation Offshore Brazil
Challenges of TLP Installation Offshore Brazil
Abstract
Installation of a Tension Leg Platform comprises distinct phases, all of which can provide special challenges when considering locating a TLP in a fronti...
Offshore WTG Monopile Installation – Crane Vessel Preparation
Offshore WTG Monopile Installation – Crane Vessel Preparation
Abstract
Oil and Gas EPC contractors in the Middle East are gradually transitioning into the Wind farm development projects in Far East Asia and Europe. NPCC, one of...