Offshore Monitoring Campaign on Installation of Suction Piles in Deep Water Fields

View through CrossRef
Abstract Within the offshore industry Heerema Marine Contractors (HMC) is known for the semi-submersible crane vessels able to install offshore structures up to 14,000t. Over the last years HMC has also proven to be a leading player in the ultra deep water construction market by setting world records on installation of heaviest structures at the greatest water depths using the Deepwater Construction Vessel (DCV) Balder and Semi-Submersible Crane Vessel (SSCV) Thialf. The installed deepwater subsea structures include flowlines completed with flowline end structures, manifolds and risers. Due to the large lift capacity of the DCV Balder, Heerema Marine Contractors is ready to install these structures in deep water fields up to 3500m. For deployment of structures multiple steel wire hoist arrangements such as the Balder's deepwater crane hoist arrangement, mooring line deployment winch or the support vessel hoist wire are available. Some typical examples of deepwater structure installations performed are shown in figure 1 and 2.
Title: Offshore Monitoring Campaign on Installation of Suction Piles in Deep Water Fields
Description:
Abstract Within the offshore industry Heerema Marine Contractors (HMC) is known for the semi-submersible crane vessels able to install offshore structures up to 14,000t.
Over the last years HMC has also proven to be a leading player in the ultra deep water construction market by setting world records on installation of heaviest structures at the greatest water depths using the Deepwater Construction Vessel (DCV) Balder and Semi-Submersible Crane Vessel (SSCV) Thialf.
The installed deepwater subsea structures include flowlines completed with flowline end structures, manifolds and risers.
Due to the large lift capacity of the DCV Balder, Heerema Marine Contractors is ready to install these structures in deep water fields up to 3500m.
For deployment of structures multiple steel wire hoist arrangements such as the Balder's deepwater crane hoist arrangement, mooring line deployment winch or the support vessel hoist wire are available.
Some typical examples of deepwater structure installations performed are shown in figure 1 and 2.

Related Results

SS: Spar Technology- Developments in Deepwater spar installation
SS: Spar Technology- Developments in Deepwater spar installation
Abstract During the last seven years Heerema Marine Contractors (HMC) has installed more than half of all Spars in the deep waters of the Gulf of Mexico. The dual...
Suction Pile Allowable Suction Pressure Envelopes Based on Soil Failure and Structural Buckling
Suction Pile Allowable Suction Pressure Envelopes Based on Soil Failure and Structural Buckling
Abstract This study develops the allowable suction pressure envelopes using applicable industrial codes for different suction pile sizes at various penetration depth...
Hemolytic characteristics of three suctioning systems for use with a newly developed cardiopulmonary bypass system
Hemolytic characteristics of three suctioning systems for use with a newly developed cardiopulmonary bypass system
Introduction: We have been developing a closed-circuit cardiopulmonary bypass (CPB) system (“Dihead CPB”) for application during coronary artery bypass grafting (CABG) and valve su...
Performance Assessment of Deep Penetration Offshore Piles Driven Into Calcareous Soils
Performance Assessment of Deep Penetration Offshore Piles Driven Into Calcareous Soils
ABSTRACT This paper presents the results of an installation monitoring and performance assessment program for offshore platform foundations in Campos Basin on the...
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
Long Buoyant Flexible Pile Frames for Support of Deepwater Offshore Platforms
ABSTRACT This paper is about Long Buoyant Flexible Pile Frames for support of deep-water offshore platforms. These Long Buoyant Flexible Pile Frame structures com...
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
Subsea Installations Using Vibratory Piling Hammers
Subsea Installations Using Vibratory Piling Hammers
ABSTRACT During the summer of 1987 ICE hydraulic vibratory hammers were used 3 times successfully for subsea installations of anchorpiles and template foundation ...
Offshore WTG Monopile Installation – Crane Vessel Preparation
Offshore WTG Monopile Installation – Crane Vessel Preparation
Abstract Oil and Gas EPC contractors in the Middle East are gradually transitioning into the Wind farm development projects in Far East Asia and Europe. NPCC, one of...

Back to Top