ABSTRACT The Norne Production and Storage Vessel (PSV) will be the largest monohull production facility in the world with a throughput capacity of 173,000 bbl oil and 238 mill scf gas per day, Production will be based on subsea completed wells, drilled through five templates and connectedto the turret moored PSV via flexible rises and flowlines. A high capacity swivel stack has been designed fortransfer of oil/gas/water between turret and facilities on the process deck. The Norne field is located further north than any other Norwegian field in operation or under development, and the water depth on location is 380 m. INTRODUCTION The Norne field is located in Block 6608/1 O, about 200 km west of the mid-Norway coast. The water depth on location is about 380 m. The top of the reservoir is found at a depth of 2525 m below MSL. At a reference depth of 2639 m the formation pressure is 273 bar and the temperature 98 degrees C. The recoverable oil reserves are about 72 mill. Sm3. The reservoir drive mechanism will be a combination of water and gas injection. Initially all produced gas will be reinjected into the gas cap. The plateau production rate representing a yearly recovery rate of 12.57. of total recoverable reserves Will be maintained for 3-4 years. The field will produce forabout 16 years. The development scenario is based on a Production and Storage Vessel (PSV) in combination with a subsea production system comprising 6 oil producers, 6 water injectorsand 2 gas injectors. The wells will be drilled through five subsea templates, two located in the northern part and three in the southern part of the field. The templates will be connected to the PSV via flexible flowlines and risers. THE PRODUCTION AND STORAGE VESSEL The PSV is a turret moored, ship-shaped production, storage and offloading vessel of Tentech 850 S design, see Fig.1. With throughput capacities as listed below the Nome PSV will be the largest monohull production system in the world. (Available In Full Paper) The vessel will, on location, be moored by means of a 12 point mooring system with 12 anchor chain winches arranged on the turret of the vessel. Five fully azimuthing, variable speed thrusters will be utilized as an active element in the station keeping and heading control, see section Instrumentation and control. The turret which will be held geostationary by the mooring lines, will also serve as attachment for all the flexible risers. From the swivel, on top of the turret, {he well stream is transferred to the inlet separator on the process deck. A total of 16 storage tanks and 2 slop tanks with a total capacity of 117,000 m3 will be arranged in the hull. Double bottom tanks, wing tanks and peak tanks provide ample capacity (about 48,000 m3) to maintain sufficient draught in ballast condition. All water ballast tanks and systems are segregated from the oil storage tanks. Accommodation for 120 persons will be arranged in the forward part of the vessels.
Title: The Norne Production Ship - Design Considerations
Description:
ABSTRACT The Norne Production and Storage Vessel (PSV) will be the largest monohull production facility in the world with a throughput capacity of 173,000 bbl oil and 238 mill scf gas per day, Production will be based on subsea completed wells, drilled through five templates and connectedto the turret moored PSV via flexible rises and flowlines.
A high capacity swivel stack has been designed fortransfer of oil/gas/water between turret and facilities on the process deck.
The Norne field is located further north than any other Norwegian field in operation or under development, and the water depth on location is 380 m.
INTRODUCTION The Norne field is located in Block 6608/1 O, about 200 km west of the mid-Norway coast.
The water depth on location is about 380 m.
The top of the reservoir is found at a depth of 2525 m below MSL.
At a reference depth of 2639 m the formation pressure is 273 bar and the temperature 98 degrees C.
The recoverable oil reserves are about 72 mill.
Sm3.
The reservoir drive mechanism will be a combination of water and gas injection.
Initially all produced gas will be reinjected into the gas cap.
The plateau production rate representing a yearly recovery rate of 12.
57.
of total recoverable reserves Will be maintained for 3-4 years.
The field will produce forabout 16 years.
The development scenario is based on a Production and Storage Vessel (PSV) in combination with a subsea production system comprising 6 oil producers, 6 water injectorsand 2 gas injectors.
The wells will be drilled through five subsea templates, two located in the northern part and three in the southern part of the field.
The templates will be connected to the PSV via flexible flowlines and risers.
THE PRODUCTION AND STORAGE VESSEL The PSV is a turret moored, ship-shaped production, storage and offloading vessel of Tentech 850 S design, see Fig.
1.
With throughput capacities as listed below the Nome PSV will be the largest monohull production system in the world.
(Available In Full Paper) The vessel will, on location, be moored by means of a 12 point mooring system with 12 anchor chain winches arranged on the turret of the vessel.
Five fully azimuthing, variable speed thrusters will be utilized as an active element in the station keeping and heading control, see section Instrumentation and control.
The turret which will be held geostationary by the mooring lines, will also serve as attachment for all the flexible risers.
From the swivel, on top of the turret, {he well stream is transferred to the inlet separator on the process deck.
A total of 16 storage tanks and 2 slop tanks with a total capacity of 117,000 m3 will be arranged in the hull.
Double bottom tanks, wing tanks and peak tanks provide ample capacity (about 48,000 m3) to maintain sufficient draught in ballast condition.
All water ballast tanks and systems are segregated from the oil storage tanks.
Accommodation for 120 persons will be arranged in the forward part of the vessels.

Related Results

Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Norne-Heidrun: Closing "The Loop" With Diverless Flanged Connections
Abstract Subsea completions in deep waters are becoming more and more frequent around the world. This entails the use of innovative technology, remote interventio...
Design and Optimization for Ship Structure Based on Knowledge-Based Engineering
Design and Optimization for Ship Structure Based on Knowledge-Based Engineering
It is always pursued that the excellent ship structure is rapidly designed and modified on the premise of ensuring security in ship engineering. In this paper, design and optimizat...
Connecting Ship Operation and Architecture in Ship Design Processes
Connecting Ship Operation and Architecture in Ship Design Processes
It is challenging to deal with the operation of ships by crew members in ship design processes. This is important because the efficiency and safety of ship operations ultimately de...
Estimating 4D Velocity Changes and Contact Movement on the Norne Field
Estimating 4D Velocity Changes and Contact Movement on the Norne Field
Abstract Hydrocarbon production and injection programs induce changes in elastic properties in a reservoir. These elastic changes can be monitored over time using...
Soviet Shipbuilding: Productivity improvement Efforts
Soviet Shipbuilding: Productivity improvement Efforts
Constant demand for new naval and commercial vessels has created special conditions for the Government-owned Soviet shipbuilding industry, which practically has not been affected b...
The expanding scope of ship design practice
The expanding scope of ship design practice
As the former International Chair of IMDC, the initiator of the continuing series of IMDC State of Art (SoA) Reports and the lead author of most IMDC SoA Reports on design methodol...
Influence of Ship Design Complexity on Ship Design Competitiveness
Influence of Ship Design Complexity on Ship Design Competitiveness
Complexity is discussed in design literature mainly through its negative and in some cases positive consequences. This article critically reviews and elaborates the effects of comp...
Advancing Automation in Early-Stage Navy Ship System Design
Advancing Automation in Early-Stage Navy Ship System Design
Ship systems, such as the electrical distribution and thermal management systems, are larger, more complex, and more integrated than ever before due to the radical increase in elec...

Back to Top