Verification of Bridge Foundation Design Assumptions and Calculations
View through CrossRef
The Sagamore Parkway Bridge consists of twin parallel bridges over the Wabash River in Lafayette, IN. The old steel-truss eastbound bridge was demolished in November 2016 and replaced by a new seven-span concrete bridge. The new bridge consists of two end-bents (bent 1 and bent 8) and six interior piers (pier 2 to pier 7) that are founded on closed-ended and open-ended driven pipe piles, respectively. During bridge construction, one of the bridge piers (pier 7) and its foundation elements were selected for instrumentation for monitoring the long-term response of the bridge to dead and live loads. The main goals of the project were (1) to compare the design bridge loads (dead and live loads) with the actual measured loads and (2) to study the transfer of the superstructure loads to the foundation and the load distribution among the piles in the group. This report presents in detail the site investigation data, the instrumentation schemes used for load and settlement measurements, and the response of the bridge pier and its foundation to dead and live loads at different stages during and after bridge construction. The measurement results include the load-settlement curves of the bridge pier and the piles supporting it, the load transferred from the bridge pier to its foundation, the bearing capacity of the pile cap, the load eccentricity, and the distribution of loads within the pier’s cross section and among the individual piles in the group. The measured dead and live loads are compared with those estimated in bridge design.
Title: Verification of Bridge Foundation Design Assumptions and Calculations
Description:
The Sagamore Parkway Bridge consists of twin parallel bridges over the Wabash River in Lafayette, IN.
The old steel-truss eastbound bridge was demolished in November 2016 and replaced by a new seven-span concrete bridge.
The new bridge consists of two end-bents (bent 1 and bent 8) and six interior piers (pier 2 to pier 7) that are founded on closed-ended and open-ended driven pipe piles, respectively.
During bridge construction, one of the bridge piers (pier 7) and its foundation elements were selected for instrumentation for monitoring the long-term response of the bridge to dead and live loads.
The main goals of the project were (1) to compare the design bridge loads (dead and live loads) with the actual measured loads and (2) to study the transfer of the superstructure loads to the foundation and the load distribution among the piles in the group.
This report presents in detail the site investigation data, the instrumentation schemes used for load and settlement measurements, and the response of the bridge pier and its foundation to dead and live loads at different stages during and after bridge construction.
The measurement results include the load-settlement curves of the bridge pier and the piles supporting it, the load transferred from the bridge pier to its foundation, the bearing capacity of the pile cap, the load eccentricity, and the distribution of loads within the pier’s cross section and among the individual piles in the group.
The measured dead and live loads are compared with those estimated in bridge design.
Related Results
Verification of High Speed on Chip with VIP using System Verilog
Verification of High Speed on Chip with VIP using System Verilog
Abstract - The exploration work is addressing verification of High speed on chips protocol; we've used the system Verilog grounded test bench structure. I developed a system Verilo...
Shenzi 16-Inch Oil Export SCR CVA Verification
Shenzi 16-Inch Oil Export SCR CVA Verification
Abstract
In 2006 Enterprise developed a 16-inch oil export system from Shenzi field located in Green Canyon Block 653 in the Gulf of Mexico, approximately 120 nau...
Platform Verification - Aview From Amember Of Industry
Platform Verification - Aview From Amember Of Industry
ABSTRACT
Concerns have been raised in many sectors regarding the safety and reliability of offshore platforms. In this paper, the history of offshore operations a...
Numerical Simulation of Barge Impact on a Continuous Girder Bridge and Bridge Damage Detection
Numerical Simulation of Barge Impact on a Continuous Girder Bridge and Bridge Damage Detection
Vessel collisions on bridge piers have been frequently reported. As many bridges are vital in transportation networks and serve as lifelines, bridge damage might leads to catastrop...
ПЕРСПЕКТИВИ ОНТОЛОГІЧНОГО МОДЕЛЮВАННЯ ЯК ЗАСОБУ ВЕРИФІКАЦІЇ РЕЗУЛЬТАТІВ ПСИХОЛОГІЧНОГО ДОСЛІДЖЕННЯ (НА ПРИКЛАДІ ВИВЧЕННЯ ЯВИЩ ГРИ)
ПЕРСПЕКТИВИ ОНТОЛОГІЧНОГО МОДЕЛЮВАННЯ ЯК ЗАСОБУ ВЕРИФІКАЦІЇ РЕЗУЛЬТАТІВ ПСИХОЛОГІЧНОГО ДОСЛІДЖЕННЯ (НА ПРИКЛАДІ ВИВЧЕННЯ ЯВИЩ ГРИ)
Purpose. Methodological differences in the verification standards for the results of scientific knowledge between individual psychological branches represented in the domestic and ...
Innovative Techniques for Software Verification in Medical Devices
Innovative Techniques for Software Verification in Medical Devices
Medical device software verification is essential for safety, effectiveness, and dependability. Traditional verification methods must adapt to complex software systems and regulato...
Behaviour and design of a double track open timber floor plate girder railway deck steel bridge
Behaviour and design of a double track open timber floor plate girder railway deck steel bridge
This paper discusses the nonlinear behaviour and design of a double track open timber floor plate girder railway deck steel bridge. A 3-D finite element model has been developed fo...