Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Economic Manufacturing Quantity Model with Machine Failure,Overtime and Rework/Disposal of Nonconforming Items

View through CrossRef
To increase their competitive advantage in turbulent marketplaces, contemporary manufacturers must show determination in seeking ways to: fulfill buyer orders with quality merchandise; meet deadlines; handle unexpected production disruptions; and lower the total relevant expense. To tackle the abovementioned challenges, this study explores an economic manufacturing quantity (EMQ) model with machine failure, overtime, and rework/disposal of nonconforming items; the goal is to find the best fabrication uptime that minimizes total relevant expenses. Specifically, we consider a production unit with overtime capacity as an operational feature that is linked to higher unit and setup costs. Further, its EMQ-based process is subject to random nonconforming items and failure rates. Extra screening separates the reworkable nonconforming items from scrap, and the rework is executed at the end of each cycle of regular fabrication. The failures follow a Poisson distribution, and a machine repair task starts as soon as a failure occurs; the fabrication of the lot that was interrupted resumes after the repair has been carried out. A decision model is built to capture the characteristics of the problem. Mathematical and optimization processes help in determining the optimal fabrication uptime. A numerical example not only illustrates the applicability of the research outcomes, but also reveals a diverse set of information about the individual or joint influences of deviations in mean-time-to-failure, overtime factors, and rework/disposal ratios linked to nonconforming rates related to the optimal replenishment uptime, total operating expenses, and various cost contributors; this facilitates better decision making.
Title: Economic Manufacturing Quantity Model with Machine Failure,Overtime and Rework/Disposal of Nonconforming Items
Description:
To increase their competitive advantage in turbulent marketplaces, contemporary manufacturers must show determination in seeking ways to: fulfill buyer orders with quality merchandise; meet deadlines; handle unexpected production disruptions; and lower the total relevant expense.
To tackle the abovementioned challenges, this study explores an economic manufacturing quantity (EMQ) model with machine failure, overtime, and rework/disposal of nonconforming items; the goal is to find the best fabrication uptime that minimizes total relevant expenses.
Specifically, we consider a production unit with overtime capacity as an operational feature that is linked to higher unit and setup costs.
Further, its EMQ-based process is subject to random nonconforming items and failure rates.
Extra screening separates the reworkable nonconforming items from scrap, and the rework is executed at the end of each cycle of regular fabrication.
The failures follow a Poisson distribution, and a machine repair task starts as soon as a failure occurs; the fabrication of the lot that was interrupted resumes after the repair has been carried out.
A decision model is built to capture the characteristics of the problem.
Mathematical and optimization processes help in determining the optimal fabrication uptime.
A numerical example not only illustrates the applicability of the research outcomes, but also reveals a diverse set of information about the individual or joint influences of deviations in mean-time-to-failure, overtime factors, and rework/disposal ratios linked to nonconforming rates related to the optimal replenishment uptime, total operating expenses, and various cost contributors; this facilitates better decision making.

Related Results

Research on the rework risk core tasks in prefabricated construction in China
Research on the rework risk core tasks in prefabricated construction in China
PurposeThe purpose of this paper is to assess the process of prefabricated construction (PC) and analyze the impacts of rework risk to identify the core tasks for which the rework ...
ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
ANALISIS PEKERJAAN YANG MENGALAMI REWORK PADA PROYEK PERUMAHAN DI BANDUNG
AbstrakKebutuhan rumah pada tahun 2013 mencapai 12 juta unit, sedangkan suplai produksi rumah hanya 250.000 - 400.000 unit/tahun dan ada sekitar 900.000 rumah tangga baru per tahun...
E-waste Management Using Blockchain Technology
E-waste Management Using Blockchain Technology
Introduction; Bridging the digital divide requires the provision of affordable, fair and quality ICT. With nearly two-thirds of the world’s population still offline, there is a nee...
FACTORS CAUSING THE DECLINE IN CERAMIC WORKERS' PRODUCTIVITY AND STRATEGIES FOR IMPROVEMENT
FACTORS CAUSING THE DECLINE IN CERAMIC WORKERS' PRODUCTIVITY AND STRATEGIES FOR IMPROVEMENT
This study examines the comparison of labor productivity during normal working hours and overtime in the ceramic installation work of the Transit Office renovation project of the M...
DESIGN PROCESS MODELLING TO MEASURE ENGINEERING PRODUCTIVITY IN BUILDING DESIGN
DESIGN PROCESS MODELLING TO MEASURE ENGINEERING PRODUCTIVITY IN BUILDING DESIGN
AbstractA multi-domain Matrix (MDM) is used to identify and analyse rework loops within the Building Design (BD) process caused by building regulations. To model this process, we u...
Overtime Working: Employee Willingness
Overtime Working: Employee Willingness
A recent article in Employee Relations by Frank Fishwick discussed the high incidence of overtime work in manual occupations in Britain and examined some of the practical difficult...
Ekonomika bosanskih velikaša u 14. i 15. stoljeću
Ekonomika bosanskih velikaša u 14. i 15. stoljeću
The role and significance of the Bosnian nobility in the historical currents of medieval Bosnia can be reliably traced in the 14th and 15th centuries when various socio-political f...

Back to Top