Javascript must be enabled to continue!
St Joseph Chemical EOR Pilot – A Key De-risking Step Prior to Offshore ASP Full field Implementation
View through CrossRef
Abstract
Chemical enhanced oil recovery (cEOR) is a complex process which exhibits a number of risks and uncertainties. A successful chemical EOR implementation depends on the success and the ability in addressing all these risks upfront and one of the important de-risking steps is the piloting process before full scale implementation.
St Joseph is an offshore field in North Sabah region of Malaysia chosen for chemical EOR implementation. In line with the implementation of chemical EOR, there are a number of uncertainties and risks associated with such a development. Some key uncertainties are generic to cEOR development, such as the heterogeneity, chemical effectiveness, emulsion, production of sales specification oil, etc. However, there are certain risks and uncertainties that are typical for this particular field, such as fractured injection, offshore environment, large secondary gas cap, etc. In order to de-risk the full field development and get a better handle on the risks and uncertainty, a pilot is planned.
The paper discuses the approach taken for the pilot selection, which includes the qualitative and quantitative assessment of pilot types vis-à-vis key risks, the workflow towards designing the pilot, the modeling approach followed, the facility concept of the design, and injectivity modeling, leading to final pilot design. The paper also touches upon the data acquisition and surveillance plan to analyze the pilot performance and quantitatively address the key risks.
In addition, the risks and uncertainties of the pilot implementation are also discussed, together with the mitigation and remediation methods. The pilot study resulted in the detailed pilot design and data gathering plan. The results of the pilot will be used to determine if chemical EOR is viable for full field development at St Joseph.
Title: St Joseph Chemical EOR Pilot – A Key De-risking Step Prior to Offshore ASP Full field Implementation
Description:
Abstract
Chemical enhanced oil recovery (cEOR) is a complex process which exhibits a number of risks and uncertainties.
A successful chemical EOR implementation depends on the success and the ability in addressing all these risks upfront and one of the important de-risking steps is the piloting process before full scale implementation.
St Joseph is an offshore field in North Sabah region of Malaysia chosen for chemical EOR implementation.
In line with the implementation of chemical EOR, there are a number of uncertainties and risks associated with such a development.
Some key uncertainties are generic to cEOR development, such as the heterogeneity, chemical effectiveness, emulsion, production of sales specification oil, etc.
However, there are certain risks and uncertainties that are typical for this particular field, such as fractured injection, offshore environment, large secondary gas cap, etc.
In order to de-risk the full field development and get a better handle on the risks and uncertainty, a pilot is planned.
The paper discuses the approach taken for the pilot selection, which includes the qualitative and quantitative assessment of pilot types vis-à-vis key risks, the workflow towards designing the pilot, the modeling approach followed, the facility concept of the design, and injectivity modeling, leading to final pilot design.
The paper also touches upon the data acquisition and surveillance plan to analyze the pilot performance and quantitatively address the key risks.
In addition, the risks and uncertainties of the pilot implementation are also discussed, together with the mitigation and remediation methods.
The pilot study resulted in the detailed pilot design and data gathering plan.
The results of the pilot will be used to determine if chemical EOR is viable for full field development at St Joseph.
Related Results
Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Abstract
The challenges facing offshore CO2 enhanced oil recovery (EOR) and carbon capture and storage (CCS) projects are presented in this paper along with poten...
Chemical EOR Evaluation for GNPOC and PDOC Fields in Sudan
Chemical EOR Evaluation for GNPOC and PDOC Fields in Sudan
Abstract
The objective of this paper is to scope the Chemical EOR potential in both GNPOC and PDOC fields in Sudan. From the initial EOR screening, the most amenable...
Evaluating Chemical EOR Potential of St Joseph Field, Offshore Malaysia
Evaluating Chemical EOR Potential of St Joseph Field, Offshore Malaysia
Abstract
This paper presents a systematic evaluation of enhanced oil recovery (EOR) potentials for St Joseph Field located in the offshore Malaysia. The field has be...
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Recent Progress and Evaluation of ASP Flooding for EOR in Daqing Oil Field
Abstract
Many ASP flooding method have been tested in Daqing oil field. After the success of polymer flooding in Daqing oil field, four alkaline- surfactant-polymer ...
Best Practices for Assessing Chemical EOR Project Risks for a Major Malaysian Offshore Oilfield
Best Practices for Assessing Chemical EOR Project Risks for a Major Malaysian Offshore Oilfield
Abstract
A major Malaysian matured offshore oilfield which is currently under waterflooding has been seen declining in production in recent years. Among various enha...
Integrated EOR Screening in a Marginal Oil Field Environment
Integrated EOR Screening in a Marginal Oil Field Environment
Abstract
An evaluation of potential EOR processes applicable in the marginal oil field operation of the Niger Delta region is presented. Technical feasibility, proce...
Comparison of Strong Alkali and Weak Alkali ASP Flooding Pilot Tests in Daqing Oilfield
Comparison of Strong Alkali and Weak Alkali ASP Flooding Pilot Tests in Daqing Oilfield
Abstract
ASP flooding is one of the most promising EOR technologies. Lots of laboratory studies and pilot tests have been finished in Daqing oilfield which is the la...
An Alkaline/Surfactant/Polymer Field Test in a Reservoir with a Long-Term 100% Water Cut
An Alkaline/Surfactant/Polymer Field Test in a Reservoir with a Long-Term 100% Water Cut
Abstract
Daqing Oil Field has already successfully implemented two alkaline/surfactant/polymer (ASP) floods with dense well spacing. To further confirm the feasib...

