Javascript must be enabled to continue!
Full Scale SSC Testing of High Hardness 4130 Steel Riser P-line Weldments
View through CrossRef
Abstract
American Petroleum Institute (API) standard 16C, Choke and Kill System, requires that peripheral lines (P-lines) meet the hardness requirements of NACE(1) MR0175/ISO15156-2. This means a maximum hardness of 22HRC for low alloy steels. Further, NACE MR0175/ISO15156-2 allows downhole casing, tubing and tubular components made of AISI 41xx steels, quenched and tempered in tubular form, to have a hardness of 26HRC, but each heat should be qualified by Sulfide Stress Cracking (SSC) testing in accordance with NACE MR0175/ISO15156-2 Clause B.1 using the tensile test. During production of AISI 4130 Q&T drilling riser choke and kill lines weld cap hardness over 237HB/22HRC was experienced. This article describes Capcis(2) HSE(3) OTI 95-635 full pipe ring sour corrosion tests on high hardness AISI 4130 Q&T P-line pipe and weldments. In the full pipe ring tests, welded pipes were loaded by squeezing up to a Hoop stress of 552MPa (SMYS) in the outer surface. Test solution was the NACE TM0177 solution A, with H2S partial pressure of 0.01, 0.1 and 1.0 bar (1, 10 and 100 kPa), respectively. Pipes and welds (weld cap and heat affected zone) with hardness that ranged from 230HV10 to 357HV10 did not show any signs of hydrogen induced sulfide stress cracking after the 30 days exposure. Test procedure and an overview of actual pipe and HAZ hardness variations are presented.
Title: Full Scale SSC Testing of High Hardness 4130 Steel Riser P-line Weldments
Description:
Abstract
American Petroleum Institute (API) standard 16C, Choke and Kill System, requires that peripheral lines (P-lines) meet the hardness requirements of NACE(1) MR0175/ISO15156-2.
This means a maximum hardness of 22HRC for low alloy steels.
Further, NACE MR0175/ISO15156-2 allows downhole casing, tubing and tubular components made of AISI 41xx steels, quenched and tempered in tubular form, to have a hardness of 26HRC, but each heat should be qualified by Sulfide Stress Cracking (SSC) testing in accordance with NACE MR0175/ISO15156-2 Clause B.
1 using the tensile test.
During production of AISI 4130 Q&T drilling riser choke and kill lines weld cap hardness over 237HB/22HRC was experienced.
This article describes Capcis(2) HSE(3) OTI 95-635 full pipe ring sour corrosion tests on high hardness AISI 4130 Q&T P-line pipe and weldments.
In the full pipe ring tests, welded pipes were loaded by squeezing up to a Hoop stress of 552MPa (SMYS) in the outer surface.
Test solution was the NACE TM0177 solution A, with H2S partial pressure of 0.
01, 0.
1 and 1.
0 bar (1, 10 and 100 kPa), respectively.
Pipes and welds (weld cap and heat affected zone) with hardness that ranged from 230HV10 to 357HV10 did not show any signs of hydrogen induced sulfide stress cracking after the 30 days exposure.
Test procedure and an overview of actual pipe and HAZ hardness variations are presented.
Related Results
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract
Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Enabling Solutions for Deepwater Drilling Riser Management-A Critical Evaluation
Abstract
As exploration activity increases and day rates increase for drilling vessels there is significant pressure on drilling contractors to push the limitatio...
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Use and Conversion of an Existing Marine Drilling Riser for a System Integration Test for the Collection of Seafloor Polymetallic Nodules
Abstract
The world's demand for metal is rising and new solutions must be explored to meet the needs associated with population growth, urbanization, decarbonized en...
The Dorada Field Production Risers
The Dorada Field Production Risers
Abstract
The Dorada Field floating production system, located offshore Spain in 310 ft of water in the Mediterranean Sea, utilizes three individual production ris...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract
The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT
Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
The Development of Deepwater Riser Recovery Technology in Liuhua Oil Field
Abstract
In the May of 2006, the three flexible risers of the FPSO " Nanhai Shengli?? at the Liuhua oil field in South China Sea were broken and dropped into seab...
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
Feasibility Of Top-Tensioned Dual Casing Production Riser Systems In Ultra-Deepwater
ABSTRACT
This paper presents a feasibility study for design of a spar with Top-Tensioned Production Risers (TTRs) in 10,000 ft water depth. The study was sponsore...