Full Scale SSC Testing of High Hardness 4130 Steel Riser P-line Weldments

View through CrossRef
Abstract American Petroleum Institute (API) standard 16C, Choke and Kill System, requires that peripheral lines (P-lines) meet the hardness requirements of NACE(1) MR0175/ISO15156-2. This means a maximum hardness of 22HRC for low alloy steels. Further, NACE MR0175/ISO15156-2 allows downhole casing, tubing and tubular components made of AISI 41xx steels, quenched and tempered in tubular form, to have a hardness of 26HRC, but each heat should be qualified by Sulfide Stress Cracking (SSC) testing in accordance with NACE MR0175/ISO15156-2 Clause B.1 using the tensile test. During production of AISI 4130 Q&T drilling riser choke and kill lines weld cap hardness over 237HB/22HRC was experienced. This article describes Capcis(2) HSE(3) OTI 95-635 full pipe ring sour corrosion tests on high hardness AISI 4130 Q&T P-line pipe and weldments. In the full pipe ring tests, welded pipes were loaded by squeezing up to a Hoop stress of 552MPa (SMYS) in the outer surface. Test solution was the NACE TM0177 solution A, with H2S partial pressure of 0.01, 0.1 and 1.0 bar (1, 10 and 100 kPa), respectively. Pipes and welds (weld cap and heat affected zone) with hardness that ranged from 230HV10 to 357HV10 did not show any signs of hydrogen induced sulfide stress cracking after the 30 days exposure. Test procedure and an overview of actual pipe and HAZ hardness variations are presented.
NACE International
Title: Full Scale SSC Testing of High Hardness 4130 Steel Riser P-line Weldments
Description:
Abstract American Petroleum Institute (API) standard 16C, Choke and Kill System, requires that peripheral lines (P-lines) meet the hardness requirements of NACE(1) MR0175/ISO15156-2.
This means a maximum hardness of 22HRC for low alloy steels.
Further, NACE MR0175/ISO15156-2 allows downhole casing, tubing and tubular components made of AISI 41xx steels, quenched and tempered in tubular form, to have a hardness of 26HRC, but each heat should be qualified by Sulfide Stress Cracking (SSC) testing in accordance with NACE MR0175/ISO15156-2 Clause B.
1 using the tensile test.
During production of AISI 4130 Q&T drilling riser choke and kill lines weld cap hardness over 237HB/22HRC was experienced.
This article describes Capcis(2) HSE(3) OTI 95-635 full pipe ring sour corrosion tests on high hardness AISI 4130 Q&T P-line pipe and weldments.
In the full pipe ring tests, welded pipes were loaded by squeezing up to a Hoop stress of 552MPa (SMYS) in the outer surface.
Test solution was the NACE TM0177 solution A, with H2S partial pressure of 0.
01, 0.
1 and 1.
0 bar (1, 10 and 100 kPa), respectively.
Pipes and welds (weld cap and heat affected zone) with hardness that ranged from 230HV10 to 357HV10 did not show any signs of hydrogen induced sulfide stress cracking after the 30 days exposure.
Test procedure and an overview of actual pipe and HAZ hardness variations are presented.

Related Results

Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Abstract Although the possibility of a riser dropping off from its top hang-off point during installation or in service is minimal, such incident can pose significan...
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
Abstract As part of the Norwegian Deepwater Programme (NDP) a state of the art review was carried out by DNV to gather information on the various riser monitoring...
Multiple Riser System for Shallow Water
Multiple Riser System for Shallow Water
Abstract Shallow water and high wave induced ship motions create a challenging and harsh environment for flexible risers and umbilicals. Two new riser systems are...
Low Cost Deepwater Hybrid Riser System.
Low Cost Deepwater Hybrid Riser System.
Abstract The design and analysis of a cost effective multi flowpath production riser for deep and ultra deep water floating production systems is presented. The d...