Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Nemba Field Development: A Phased Approach

View through CrossRef
Abstract A phased field development program is currently underway for the Nemba Field offshore Cabinda, Angola, This paper provides the current geologic interpretation, a description of the existing/planned development facilities, and the general reservoir management philosophy utilized for Nemba. The benefits resulting from phasing field development at Nemba are discussed. Introduction The Nemba Field is located approximately 60 kilometers offshore Cabinda, Angola in 350-400 feet of water. The field lies within Area B of the Cabinda Concession, and is being developed on behalf of the Cabinda Association (Sonangol, Chevron, Elf and Agip) by Cabinda Gulf Oil Company Limited (CABGOC). A map of the Cabinda Concession is provided in Figure 1. The Nemba reservoir occurs within the Albian-age Pinda Formation. A large gas cap, more prevalent in the northernportion of the field, provides the primary reservoir drive mechanism. It is estimated that the field contains in excess of 3 trillion cubic feet (TCF) of associated and non-associatedgas and I billion barrels of oil and condensate. The field was discovered in October 1990. Following a three well delineation program in the southern portion of the field, a phased field development strategy was initiated in the second half of 1993 which includes primary oil developmentas well as secondary oil recovery by gas injection. The phased development plan includes the following major components:an early production system (EPS) in the central Nemba area that came onstream in January 1996,drilling, production and gas injection facilities in thesouthern portion of the field (ie., South Nemba) scheduled to come onstream in the second quarter of1998,drilling, production and gas injection facilities in thenorthern portion of the field (ie., North Nemba) scheduled to come onstream in 2000, andan infill drilling program from the South Nemba facilities scheduled to begin in 2001. The phased field development strategy has made it possible to effectively manage the development of the Nemba resource from both a subsurface as well as surface perspective by allowing the Operator to:minimize the geologic/production risk associated with a large new discovery,effectively manage capital, drilling and other resources,optimize production facilities based on a continuallyimproving reservoir characterization, andaccelerate the time to first production and initial project revenue. The phased field development strategy takes advantage of continually changing and improving reservoir information. As reservoir characterization progresses, new information is incorporated into field development planning and production facility designs. Phasing field development will allow the Operator to maximize the value of the Nemba resource to both the Cabinda Association and the government of Angola. This is achieved in part by identifying optimum facility designs which minimize development costs while providing appropriate reservoir management flexibility. Field History The current geologic interpretation of the Nemba reservoir is based on delineation and development activities carried out between 1990 and 1996. These activities included; drill stemtesting of appraisal wells, wireline logging, an extensive coring program, 2-D and 3D seismic evaluation, and utilization of production data from the Nemba EPS.
Title: Nemba Field Development: A Phased Approach
Description:
Abstract A phased field development program is currently underway for the Nemba Field offshore Cabinda, Angola, This paper provides the current geologic interpretation, a description of the existing/planned development facilities, and the general reservoir management philosophy utilized for Nemba.
The benefits resulting from phasing field development at Nemba are discussed.
Introduction The Nemba Field is located approximately 60 kilometers offshore Cabinda, Angola in 350-400 feet of water.
The field lies within Area B of the Cabinda Concession, and is being developed on behalf of the Cabinda Association (Sonangol, Chevron, Elf and Agip) by Cabinda Gulf Oil Company Limited (CABGOC).
A map of the Cabinda Concession is provided in Figure 1.
The Nemba reservoir occurs within the Albian-age Pinda Formation.
A large gas cap, more prevalent in the northernportion of the field, provides the primary reservoir drive mechanism.
It is estimated that the field contains in excess of 3 trillion cubic feet (TCF) of associated and non-associatedgas and I billion barrels of oil and condensate.
The field was discovered in October 1990.
Following a three well delineation program in the southern portion of the field, a phased field development strategy was initiated in the second half of 1993 which includes primary oil developmentas well as secondary oil recovery by gas injection.
The phased development plan includes the following major components:an early production system (EPS) in the central Nemba area that came onstream in January 1996,drilling, production and gas injection facilities in thesouthern portion of the field (ie.
, South Nemba) scheduled to come onstream in the second quarter of1998,drilling, production and gas injection facilities in thenorthern portion of the field (ie.
, North Nemba) scheduled to come onstream in 2000, andan infill drilling program from the South Nemba facilities scheduled to begin in 2001.
The phased field development strategy has made it possible to effectively manage the development of the Nemba resource from both a subsurface as well as surface perspective by allowing the Operator to:minimize the geologic/production risk associated with a large new discovery,effectively manage capital, drilling and other resources,optimize production facilities based on a continuallyimproving reservoir characterization, andaccelerate the time to first production and initial project revenue.
The phased field development strategy takes advantage of continually changing and improving reservoir information.
As reservoir characterization progresses, new information is incorporated into field development planning and production facility designs.
Phasing field development will allow the Operator to maximize the value of the Nemba resource to both the Cabinda Association and the government of Angola.
This is achieved in part by identifying optimum facility designs which minimize development costs while providing appropriate reservoir management flexibility.
Field History The current geologic interpretation of the Nemba reservoir is based on delineation and development activities carried out between 1990 and 1996.
These activities included; drill stemtesting of appraisal wells, wireline logging, an extensive coring program, 2-D and 3D seismic evaluation, and utilization of production data from the Nemba EPS.

Related Results

Theoretical analysis and experimental measurement of digital multi-beam phased antenna array in the C frequency range
Theoretical analysis and experimental measurement of digital multi-beam phased antenna array in the C frequency range
The choice of elements for constructing a phased antenna array providing a relative frequency bandwidth up to 9% for the transmission or reception of wireless communication system ...
Nemba Field Development: A Phased Approach
Nemba Field Development: A Phased Approach
This article is a synopsis of paper OTC 8330, "Nemba Field Development: A Phased Approach," by C.P. Whatley, M.L. Schrader, SPE, and J.B. Murphy, Chevron Overseas Petroleum Inc.; a...
Inspeksi Upper Wing Top Skin Panel Menggunakan Phased Array Ultrasonic Testing (PAUT)
Inspeksi Upper Wing Top Skin Panel Menggunakan Phased Array Ultrasonic Testing (PAUT)
<em>Non Destructive Testing (NDT) adalah cara yang paling ekonomis untuk melakukan inspeksi dan cara untuk menemukan cacat. Salah satu metode inspeksi NDT adalah Ultrasonic T...
North Nemba Flare Bucket Foundations
North Nemba Flare Bucket Foundations
Abstract The successful installation of the North Nemba Flare in November 1999 demonstrates that suction-installed foundations ("buckets") are a competitive found...
PIN-PMN-PT Single Crystal 1-3 Composite based 20 MHz Ultrasound Phased Array
PIN-PMN-PT Single Crystal 1-3 Composite based 20 MHz Ultrasound Phased Array
Based on a modified dice-and-fill technique, a PIN-PMN-PT single crystal 1-3 composite with the kerf of 12μm and pitch of 50μm was prepared. The as-made piezoelectric composite mat...
Ultrasonic phased array flexible coupling detection of defects in high-voltage cable terminal lead seals
Ultrasonic phased array flexible coupling detection of defects in high-voltage cable terminal lead seals
High-voltage cable terminal lead seals may develop defects such as holes, cracks, or delamination due to substandard installation quality or external forces during operation. Owing...
Phased Array Antenna Calibration Based on Autocorrelation Algorithm
Phased Array Antenna Calibration Based on Autocorrelation Algorithm
The problem of calibrating phased array antennas in a noisy environment using an autocorrelation algorithm is investigated and a mathematical model of the autocorrelation calibrati...
Shape and Weighting Optimization of a Subarray for an mm-Wave Phased Array Antenna
Shape and Weighting Optimization of a Subarray for an mm-Wave Phased Array Antenna
This paper discusses how to optimize the weighting of individual subarrays to derive the low sidelobe level (SLL) based on quadratic programming (QP) and how to derive QP parameter...

Back to Top