Javascript must be enabled to continue!
Well Engineering Aspects and Risk Analysis of Carbon Capture and Storage (CCS) Wells
View through CrossRef
Abstract
Interest in strategies to reduce greenhouse gas emissions has increased as a result of rising awareness of international climate change target. On such technology in the roadmap is the carbon capture utilization and storage (CCUS). New and existing wells can be drilled or retro-fitted to serve the carbon dioxide (CO2) injection purpose; well engineering aspects of well construction will have to be adjusted to meet the functional specifications of injecting CO2 down the sub-surface to provide a life span of 25+ years from first CO2 injected, casing design will have to be tailored for the new load cases required for CO2 injection.
In this work, a methodology for well design in carbon capture and sequestration (CCS) projects is discussed. Utility wells, which are used to lower pressure by removing formation water, as well as observation or monitoring wells are included in the CCS wells in addition to CO2 injection wells. Our research took aim at Process Safety and Well Barriers, an area of Well Engineering that hasn't been developed to CCS Wells, our results proposed a comprehensive approach to well barrier diagrams for CCS Wells .A new risk assessment matrix and CCS Wells Risk Index has been developed for CCS Wells which introduces a qualitative and quantitative way to screen and rank CCS projects based on a holistic analysis of all well's related risk elements.
Based on CCS Well Risk Assessment, CCS Wells Risk Index and Detailed Engineering Design with Specific Mitigations for each risk identified, it is recommended to proceed throughout the well delivery process with the proposed CCS Well Prospect. Annular zonal isolation is critical for prevention of CO2 migration and cross flow in shallower reservoirs pass the water caprock (i.e., water table), to this end several research studies such as those e quoted in this paper confirm that Portland Cement Slurries are suitable to provide zonal isolation even in the presence of carbonation of a very small thickness near the injection layer interface for a period of 35 plus years, reduction of cement porosity will provide additional benefits via chemical products in the slurry as to further minimizing any CO2 migration through cement pores in the annular space. The detailed casing design carried out using Von Misses Triaxial equation confirmed that L80 casing will be more than enough for the intended most severe load cases with a DF of 1.84 > 1.25 (Required).
The risk assessment conducted on this project prior to mitigation enabled an effective identification of critical risk elements and its mitigation; further implementation of the risk mitigation plan allows to reduce the likelihood and impact to ALARP levels (As-low-as-reasonably-practical).
The CCS Well Index calculated at 0.25 (25%) evidenced a low-risk project which should pass the concept select phase of the well delivery process and continue throughout the road map and mature to execution. The risk assessment conducted on this project prior to mitigation enabled an effective identification of critical risk elements and its mitigation; further implementation of the risk mitigation plan allows to reduce the likelihood and impact to ALARP levels (As-low-as-reasonably-practical).
Title: Well Engineering Aspects and Risk Analysis of Carbon Capture and Storage (CCS) Wells
Description:
Abstract
Interest in strategies to reduce greenhouse gas emissions has increased as a result of rising awareness of international climate change target.
On such technology in the roadmap is the carbon capture utilization and storage (CCUS).
New and existing wells can be drilled or retro-fitted to serve the carbon dioxide (CO2) injection purpose; well engineering aspects of well construction will have to be adjusted to meet the functional specifications of injecting CO2 down the sub-surface to provide a life span of 25+ years from first CO2 injected, casing design will have to be tailored for the new load cases required for CO2 injection.
In this work, a methodology for well design in carbon capture and sequestration (CCS) projects is discussed.
Utility wells, which are used to lower pressure by removing formation water, as well as observation or monitoring wells are included in the CCS wells in addition to CO2 injection wells.
Our research took aim at Process Safety and Well Barriers, an area of Well Engineering that hasn't been developed to CCS Wells, our results proposed a comprehensive approach to well barrier diagrams for CCS Wells .
A new risk assessment matrix and CCS Wells Risk Index has been developed for CCS Wells which introduces a qualitative and quantitative way to screen and rank CCS projects based on a holistic analysis of all well's related risk elements.
Based on CCS Well Risk Assessment, CCS Wells Risk Index and Detailed Engineering Design with Specific Mitigations for each risk identified, it is recommended to proceed throughout the well delivery process with the proposed CCS Well Prospect.
Annular zonal isolation is critical for prevention of CO2 migration and cross flow in shallower reservoirs pass the water caprock (i.
e.
, water table), to this end several research studies such as those e quoted in this paper confirm that Portland Cement Slurries are suitable to provide zonal isolation even in the presence of carbonation of a very small thickness near the injection layer interface for a period of 35 plus years, reduction of cement porosity will provide additional benefits via chemical products in the slurry as to further minimizing any CO2 migration through cement pores in the annular space.
The detailed casing design carried out using Von Misses Triaxial equation confirmed that L80 casing will be more than enough for the intended most severe load cases with a DF of 1.
84 > 1.
25 (Required).
The risk assessment conducted on this project prior to mitigation enabled an effective identification of critical risk elements and its mitigation; further implementation of the risk mitigation plan allows to reduce the likelihood and impact to ALARP levels (As-low-as-reasonably-practical).
The CCS Well Index calculated at 0.
25 (25%) evidenced a low-risk project which should pass the concept select phase of the well delivery process and continue throughout the road map and mature to execution.
The risk assessment conducted on this project prior to mitigation enabled an effective identification of critical risk elements and its mitigation; further implementation of the risk mitigation plan allows to reduce the likelihood and impact to ALARP levels (As-low-as-reasonably-practical).
Related Results
CCS- A Bitter Past or a Prospective Future
CCS- A Bitter Past or a Prospective Future
Abstract
Carbon Capture and Storage (CCS) is indeed a very effective technology in reducing the CO2 concentrations from the atmosphere and possesses massive potentia...
Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Outlook and Technologies for Offshore CO2 EOR/CCS Projects
Abstract
The challenges facing offshore CO2 enhanced oil recovery (EOR) and carbon capture and storage (CCS) projects are presented in this paper along with poten...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract
This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Integrated Petrophysical Studies for Subsurface Carbon Sequestration
Integrated Petrophysical Studies for Subsurface Carbon Sequestration
Petrophysics is a core component of subsurface characterization and monitoring for carbon sequestration. The United States Environmental Protection Agency’s underground injection c...
Japan's New Laws Regarding CCS, Hydrogen, and Ammonia
Japan's New Laws Regarding CCS, Hydrogen, and Ammonia
The year 2024 has marked the advent of the CCS industry and the hydrogen and ammonia industry in Japan. On 17 May 2024, the Japanese Diet (parliament) passed two legislations, name...
Carbon Capture & Storage Management for Kuwait Oil Company, Kuwait
Carbon Capture & Storage Management for Kuwait Oil Company, Kuwait
Abstract
Kuwait Oil Company (KOC) has commissioned a study to determine the potential contribution that Carbon Capture and Storage alone (CCS), Carbon Capture and St...
Effects of Stand Structural Characteristics, Diversity, and Stability on Carbon Storage Across Different Densities in Natural Forests: A Case Study in the Xiaolong Mountains, China
Effects of Stand Structural Characteristics, Diversity, and Stability on Carbon Storage Across Different Densities in Natural Forests: A Case Study in the Xiaolong Mountains, China
The carbon storage in forest ecosystems is closely linked to biomass, and its dynamic changes are of significant importance for assessing forest structure and function, as well as ...
Carbon Cyber Infrastructure CCI: Identifying and Characterizing CO2 Sources and Opportunities for Carbon Capture and Storage
Carbon Cyber Infrastructure CCI: Identifying and Characterizing CO2 Sources and Opportunities for Carbon Capture and Storage
Abstract
CO2 sources vary widely in emission characteristics including concentration, pressure, contaminants and intermittency. In addition, the ability to initiate ...