Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Case Studies of Distributed Generation Projects With Microturbines in Brazil

View through CrossRef
Microturbines have showed good perspectives for the distributed generation of the electricity in low capacity range, because they have high reliability and simple design (high potential for a cheap manufacture and in large scale). Besides, this technology must have a great application in systems of cogeneration of the public service (malls, hotel, hospital, etc.) and in the distributed generation of the electricity in the developing countries in order to get a reliable operation system, in a range of power compatible with the isolated communities. In Brazil, The Thermal Systems Study Group (NEST) of Federal University of Itajuba´ (UNIFEI) sponsored by The Energy Company of Minas Gerais (CEMIG), are developing a project of experimental valuation of the system with microturbines for electricity generation fueled with natural gas and diesel. The objective of this paper is to show an economic evaluation which presents the generation costs and the payback period with the Capstone 30 kW natural gas microturbines business in three cases: microturbines operating on base load in gas station, microturbines operating on peak shave in the industry and a microturbine cogeneration system operating in the residential segment. It was considered the cost of microturbines at this moment and the projection for the future, as well as the cost of electricity and natural gas in Brazil. An economical analysis was carried out for different variables involved and the results show the Capstone 30 kW natural gas microturbines business are feasible firstly in cogeneration cases which is possible to get until 3 years of payback period. Besides, the return on the investment have shown improvements with the incentive of the natural gas distributing companies and with the rises in the electricity price of Brazilian utilities.
Title: Case Studies of Distributed Generation Projects With Microturbines in Brazil
Description:
Microturbines have showed good perspectives for the distributed generation of the electricity in low capacity range, because they have high reliability and simple design (high potential for a cheap manufacture and in large scale).
Besides, this technology must have a great application in systems of cogeneration of the public service (malls, hotel, hospital, etc.
) and in the distributed generation of the electricity in the developing countries in order to get a reliable operation system, in a range of power compatible with the isolated communities.
In Brazil, The Thermal Systems Study Group (NEST) of Federal University of Itajuba´ (UNIFEI) sponsored by The Energy Company of Minas Gerais (CEMIG), are developing a project of experimental valuation of the system with microturbines for electricity generation fueled with natural gas and diesel.
The objective of this paper is to show an economic evaluation which presents the generation costs and the payback period with the Capstone 30 kW natural gas microturbines business in three cases: microturbines operating on base load in gas station, microturbines operating on peak shave in the industry and a microturbine cogeneration system operating in the residential segment.
It was considered the cost of microturbines at this moment and the projection for the future, as well as the cost of electricity and natural gas in Brazil.
An economical analysis was carried out for different variables involved and the results show the Capstone 30 kW natural gas microturbines business are feasible firstly in cogeneration cases which is possible to get until 3 years of payback period.
Besides, the return on the investment have shown improvements with the incentive of the natural gas distributing companies and with the rises in the electricity price of Brazilian utilities.

Related Results

Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract Introduction Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Project Management Dynamics and Performance of Kenya Electricity Generating Company Projects
Project Management Dynamics and Performance of Kenya Electricity Generating Company Projects
Kenya continues to face challenges regarding the actualization and timely implementation of electricity generation projects aimed at increasing the electricity capacity required in...
Chest Wall Hydatid Cysts: A Systematic Review
Chest Wall Hydatid Cysts: A Systematic Review
Abstract Introduction Given the rarity of chest wall hydatid disease, information on this condition is primarily drawn from case reports. Hence, this study systematically reviews t...
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Abstarct Introduction Orbital hydatid cysts (HCs) constitute less than 1% of all cases of hydatidosis, yet their occurrence is often linked to severe visual complications. This stu...
The Hidden Problem of Cross-Reactivity: Challenges in HIV Testing During the COVID-19 Era: A Systematic Review
The Hidden Problem of Cross-Reactivity: Challenges in HIV Testing During the COVID-19 Era: A Systematic Review
Abstract Introduction Human immunodeficiency virus (HIV) and Severe Acute Respiratory Syndrome Coronavirus 2 (SARS-CoV2) surface glycoproteins, including shared epitope motifs, sho...
Microturbine Cycle Options
Microturbine Cycle Options
The deregulation of electric power and growing emphasis placed on distributed power generation, is establishing the need for a compact thermal energy system capable of providing th...
ANALYSIS AND PRIORITIZING RISK MINIMIZING TECHNIQUES OF IT PROJECTS
ANALYSIS AND PRIORITIZING RISK MINIMIZING TECHNIQUES OF IT PROJECTS
This article is devoted to the risk analysis of IT projects. The article defines the risks of IT projects, classifies the key risks of IT projects and identifies the main sources o...

Back to Top