Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Matrix Acidizing Optimization for Screened Sandstone Formation at High-Rate Gas Well of Deepwater GWK-8

View through CrossRef
Deepwater GWK-8 is a gas well in deep sea with 1500 meters water depth and a deviated well with a sandstone formation that has good permeability, potentially high-rate gas well, high reservoir pressures, and large reservoir size. This well is expected to immediately ramp up production at optimal productivity through Floating Production Storage and Offloading (FPSO) in Makassar Strait. For a gas well at deep-water exploration must be commercially viable, it needs to achieve optimal production rate. Gas production initially was not meet the expectations, so it needed to be optimized by one of stimulation method that suitable for this well is matrix acidizing. Sandstone formation is screened by Shape Memory Polymer (SMP) sand control system and matrix acidizing is carried out to optimize the deliverability of gas well by dissolving formation impurities and normalize damage in the wellbore. Methodology of this study begins with collecting data on reservoir data, formation lithology, completion, and well-testing. The optimization of matrix acidizing process is based on initial well-testing results where skin (s) of pre-acidizing is 46 with a permeability (k) is 51.4 mD. The matrix acidizing process uses mud acid (HCl-HF) for upper zone of deepwater GWK-8 that has been installed Shape Memory Polymer (SMP) sand control at the pay zone area. Based on well-testing of post-matrix acidizing, successfully proven in reducing the skin number (s) from 46 to 10, increasing permeability (k) from 51.4 mD to 120 mD, and increasing productivity from 30 MMSCFD to 44 MMSCFD.
Title: Matrix Acidizing Optimization for Screened Sandstone Formation at High-Rate Gas Well of Deepwater GWK-8
Description:
Deepwater GWK-8 is a gas well in deep sea with 1500 meters water depth and a deviated well with a sandstone formation that has good permeability, potentially high-rate gas well, high reservoir pressures, and large reservoir size.
This well is expected to immediately ramp up production at optimal productivity through Floating Production Storage and Offloading (FPSO) in Makassar Strait.
For a gas well at deep-water exploration must be commercially viable, it needs to achieve optimal production rate.
Gas production initially was not meet the expectations, so it needed to be optimized by one of stimulation method that suitable for this well is matrix acidizing.
Sandstone formation is screened by Shape Memory Polymer (SMP) sand control system and matrix acidizing is carried out to optimize the deliverability of gas well by dissolving formation impurities and normalize damage in the wellbore.
Methodology of this study begins with collecting data on reservoir data, formation lithology, completion, and well-testing.
The optimization of matrix acidizing process is based on initial well-testing results where skin (s) of pre-acidizing is 46 with a permeability (k) is 51.
4 mD.
The matrix acidizing process uses mud acid (HCl-HF) for upper zone of deepwater GWK-8 that has been installed Shape Memory Polymer (SMP) sand control at the pay zone area.
Based on well-testing of post-matrix acidizing, successfully proven in reducing the skin number (s) from 46 to 10, increasing permeability (k) from 51.
4 mD to 120 mD, and increasing productivity from 30 MMSCFD to 44 MMSCFD.

Related Results

The Future of Regulations for the Deepwater GOM
The Future of Regulations for the Deepwater GOM
Abstract Deepwater oil and gas activities in the U.S. Gulf of Mexico Outer ContinentalShelf (OCS) are regulated by the Minerals Management Service (MMS). The leve...
A Study and Application of Multi-section Acidizing Technology with Original Production String in Horizontal Well
A Study and Application of Multi-section Acidizing Technology with Original Production String in Horizontal Well
Abstract The formation damageability of drilling and completion fluids on horizontal wells is more critical than on vertical wells, due to longer horizontal section ...
Acidizing Sandstone Formations Using a Sandstone Acid System For High Temperatures
Acidizing Sandstone Formations Using a Sandstone Acid System For High Temperatures
Abstract Regular mud acid mixtures have been extensively used to stimulate sandstone formations; however, the use of this acid in a deep well has some major drawback...
An Integrated Tubing String for Synergistic Acidizing-Flowback: Simulation and Optimization Targeting Offshore Dongying Formation
An Integrated Tubing String for Synergistic Acidizing-Flowback: Simulation and Optimization Targeting Offshore Dongying Formation
The oil layers in the Dongying Formation offshore oilfield are severely contaminated. The near-wellbore reservoir pore throats are blocked, which seriously affects the development ...
Evaluation of the Effectiveness of Matrix Stimulation Recipes for High CO2 Carbonate Reservoirs for Bypassing Formation Damage
Evaluation of the Effectiveness of Matrix Stimulation Recipes for High CO2 Carbonate Reservoirs for Bypassing Formation Damage
Abstract This paper presents the evaluation of the effectiveness of two novel organic acid stimulation fluids for matrix acidizing of a high temperature, high CO2 ga...
Removal of Wellbore Scales from High Temperature Depleted Gas Wells
Removal of Wellbore Scales from High Temperature Depleted Gas Wells
Abstract Mixed mineral scales were observed in production tubulars of many Mobile Bay gas wells. These wells are mostly ultra-high temperature (about 400oF) sour ...
Research on characterization of the deterioration of sandstone physical and mechanical properties under mining and water action
Research on characterization of the deterioration of sandstone physical and mechanical properties under mining and water action
Abstract Mining geological disasters occur frequently in Guizhou, with mine mining and rainfall-induced avalanche geological disasters mainly, the investigation concluded t...
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Abstract This paper describes the most important features required for installing deepwater pipelines, pipelines with in-line sled assemblies, PLETs, and SCRs. Th...

Back to Top