Javascript must be enabled to continue!
Västlänken – The West Link Project, Korsvägen construction section in Gothenburg, Sweden
View through CrossRef
AbstractWest Link (Swedish: Västlänken) is one of the biggest infrastructure projects in Sweden building an in total 8 km double‐track railway tunnel in Gothenburg, which is currently under construction. “E05 Korsvägen” is a construction lot which is part of the West Link project with the Swedish transport authority Trafikverket as the client. The works were awarded to the Joint Venture (JV) West Link Contractors consisting of Wayss & Freytag Ingenieurbau AG and NCC. A special contract model with a design and build part combined with a regular bill of quantities comprises building an underground double‐track railway tunnel with a length of 3.2 km and the new Korsvägen station. This sub‐project includes three drill and blast sections and three open excavation sections. All three construction pits will be executed in challenging soft ground conditions. The JV is confronted with high environmental demands and special requirements for the blasting works in the urban area of Gothenburg.
Title: Västlänken – The West Link Project, Korsvägen construction section in Gothenburg, Sweden
Description:
AbstractWest Link (Swedish: Västlänken) is one of the biggest infrastructure projects in Sweden building an in total 8 km double‐track railway tunnel in Gothenburg, which is currently under construction.
“E05 Korsvägen” is a construction lot which is part of the West Link project with the Swedish transport authority Trafikverket as the client.
The works were awarded to the Joint Venture (JV) West Link Contractors consisting of Wayss & Freytag Ingenieurbau AG and NCC.
A special contract model with a design and build part combined with a regular bill of quantities comprises building an underground double‐track railway tunnel with a length of 3.
2 km and the new Korsvägen station.
This sub‐project includes three drill and blast sections and three open excavation sections.
All three construction pits will be executed in challenging soft ground conditions.
The JV is confronted with high environmental demands and special requirements for the blasting works in the urban area of Gothenburg.
Related Results
Are Cervical Ribs Indicators of Childhood Cancer? A Narrative Review
Are Cervical Ribs Indicators of Childhood Cancer? A Narrative Review
Abstract
A cervical rib (CR), also known as a supernumerary or extra rib, is an additional rib that forms above the first rib, resulting from the overgrowth of the transverse proce...
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but al...
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
This research examines the project management strategies utilized by Nehemiah in the reconstruction of Jerusalem's walls, as described in the biblical text, and assesses their comp...
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
The article examines the principles of effective formation of a project management system at an enterprise. In the modern environment, project management standards and management i...
Desa Pekerja Bangunan: Pemberdayaan Masyarakat Menuju Desa Penghasil Pekerja Bangunan Profesional Dan Bersertifikat Dengan Pemasaran Jasa Online Di Kelurahan Gunungpati
Desa Pekerja Bangunan: Pemberdayaan Masyarakat Menuju Desa Penghasil Pekerja Bangunan Profesional Dan Bersertifikat Dengan Pemasaran Jasa Online Di Kelurahan Gunungpati
The needs of construction workers play a very important role in society. However, based on the results of a survey of several construction workers from Gunungpati Village, problems...
The Moderating Role of Human Resources in the Relationship Between Project Control and Construction Performance During the COVID-19 Pandemic
The Moderating Role of Human Resources in the Relationship Between Project Control and Construction Performance During the COVID-19 Pandemic
Introduction: The COVID-19 pandemic has significantly affected the construction industry, disrupting project performance due to labor shortages, supply chain delays, and financial ...
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Abstract
The Tilenga project operated by TotalEnergies Exploration and Production Uganda, is an onshore oil project located in the Lake Albert Basin of Uganda. The p...
Improvement of the project control system : a case study of an interior decoration company
Improvement of the project control system : a case study of an interior decoration company
This thesis aimed to reduce the delay and unnecessarily accelerated or crashed activities of the project by improving the project control system of an interior decoration company. ...

