Conceptualising project management capabilities for offsite construction

View through CrossRef
PurposeRecent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project management techniques. While previous research mainly focuses on transformations related to digital and advanced technologies driven by industry 4.0 principles, a research gap still exists on the intersection of project management capabilities and OSC. This study attempts to bridge this gap by capturing the homogeneity of different capabilities and integrating them into an overarching framework.Design/methodology/approachA scientometric analysis is conducted to provide an overview of the co-occurrence network of keywords in the representative studies. A systematic literature review (SLR) of articles published between 2010 and 2022, followed by a subsequent full-text examination of 63 selected articles, revealed 34 interrelated capabilities to be categorised under three exhaustive planning-oriented, design-oriented and delivery-oriented groups.FindingsThis review revealed an upward trend of publication on project management capabilities for OSC with a specific interest in optimisation of resources allocated to offsite operations. The top five capabilities discussed more frequently in the literature include (1) artificial intelligence for design error detection, (2) enhanced resource productivity, (3) cost saving in offsite production, (4) real-time traceability of modules and (5) applying lean agile production principles to OSC, which imply the critical role of quality, cost saving, traceability and agility in OSC.Originality/valueThis study elicits core capabilities and develops a new offsite project management framework for the first time. The authors provide directions for researchers and practitioners to apply capabilities for obtaining better outcomes and higher value out of offsite operations.
Title: Conceptualising project management capabilities for offsite construction
Description:
PurposeRecent research advocates that there are plenty of opportunities for key players in the offsite construction (OSC) sector to harness the full potential of advanced project management techniques.
While previous research mainly focuses on transformations related to digital and advanced technologies driven by industry 4.
0 principles, a research gap still exists on the intersection of project management capabilities and OSC.
This study attempts to bridge this gap by capturing the homogeneity of different capabilities and integrating them into an overarching framework.
Design/methodology/approachA scientometric analysis is conducted to provide an overview of the co-occurrence network of keywords in the representative studies.
A systematic literature review (SLR) of articles published between 2010 and 2022, followed by a subsequent full-text examination of 63 selected articles, revealed 34 interrelated capabilities to be categorised under three exhaustive planning-oriented, design-oriented and delivery-oriented groups.
FindingsThis review revealed an upward trend of publication on project management capabilities for OSC with a specific interest in optimisation of resources allocated to offsite operations.
The top five capabilities discussed more frequently in the literature include (1) artificial intelligence for design error detection, (2) enhanced resource productivity, (3) cost saving in offsite production, (4) real-time traceability of modules and (5) applying lean agile production principles to OSC, which imply the critical role of quality, cost saving, traceability and agility in OSC.
Originality/valueThis study elicits core capabilities and develops a new offsite project management framework for the first time.
The authors provide directions for researchers and practitioners to apply capabilities for obtaining better outcomes and higher value out of offsite operations.

Related Results

Architecture between heteronomy and self-generation
Architecture between heteronomy and self-generation
Introduction «I have never worked in the technocratic exaltation, solving a constructive problem and that’s it. I’ve always tried to interpret the space of human life» (Vitto...
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
The article examines the principles of effective formation of a project management system at an enterprise. In the modern environment, project management standards and management i...
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
This research examines the project management strategies utilized by Nehemiah in the reconstruction of Jerusalem's walls, as described in the biblical text, and assesses their comp...
The relationship between project management process characteristics and performance outcomes
The relationship between project management process characteristics and performance outcomes
Purpose– The aim of this paper is to examine the links between project management process characteristics and project-level and firm-level performance outcomes to test the hypothes...
KNOWLEDGE MANAGEMENT AT PROJECT-ORIENTED ENTERPRISES
KNOWLEDGE MANAGEMENT AT PROJECT-ORIENTED ENTERPRISES
The analysis of the peculiarities of knowledge management of operational and project activities at the project-oriented enterprise is carried out in the work. The conceptual model ...
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
BIM-INTEGRATED SYSTEM: A SUCCESSFUL ALTERNATIVE FOR ESTIMATING CASH FLOW IN BUILDING PROJECTS
Cash flow calculation is an essential economic aspect of evaluating the success of a construction project. Strong cash flow positively impacts not only project effectiveness but al...
Research on the Importance of Project Pisk Management to Project Success
Research on the Importance of Project Pisk Management to Project Success
A project is a one-time task that needs to be completed within a limited amount of resources and time. The nature of project management is to obtain the value of certainty by manag...